Report
to/Rapport au :
Corporate Services and Economic Development Committee
Comité des services organisationnels et du
développement économique
and Council / et au Conseil
02 December 2004 / le 2 décembre 2004
Steve Kanellakos, Deputy City Manager/Directeur municipale adjoint,
Community & Protective Services/Services communautaires et de
protection
Contact Person/Personne
ressource : Aaron Burry, Director, Parks & Recreation/
Directeur des parcs et loisirs,(613)
580-2424,Ext./poste 23666, Aaron.Burry@ottawa.ca
And/et Réjean Chartrand, Director, Strategic
Delivery Unit/Directeur de l’unité d’exécution stratégique, 580-2424,
Ext./poste 21696, Rejean.Chartrand@ottawa.ca
REPORT RECOMMENDATIONS
1. That
Corporate Services and Economic Development Committee recommend Council approve
the Kinburn District Service Centre at 5670 Carp Road as the site for a new
arena facility in West Carleton to be reviewed as part of the City’s
public-private partnership (P3) process.
2. That
Corporate Services and Economic Development Committee:
(a)
Authorize staff to initiate the process for a request
for proposals (RFP) for the design, construction and operation of the Kinburn
arena facility under a public-private partnership (P3);
(b)
Direct staff to report back to Committee and Council on
the principles and framework of the public-private partnership prior to issuing
an RFP for the project.
RECOMMANDATIONS DU
RAPPORT
1. Que le Comité des
services organisationnels et du développement économique recommande au Conseil
d’approuver l’emplacement du Centre de service de Kinburn, situé au 5670,
chemin Carp, comme site d’un nouvel aréna à West Carleton devant faire l’objet
d’un examen dans le cadre du programme des partenariats public-privé (P3) de la
Ville d’Ottawa.
2. Que le Comité des services organisationnels et du développement économique :
(a) autorise
le personnel à entreprendre les démarches nécessaires à la publication d’une
demande de propositions pour la conception, la construction et l’exploitation
de l’aréna de Kinburn dans le cadre d’un partenariat public-privé (P3);
(b) donne
instruction au personnel de faire rapport au Comité et au Conseil sur les
principes et le cadre devant régir le partenariat public-privé avant de publier
une demande de propositions pour ce projet.
BACKGROUND
On February 12th, 2003, in a report on the qualification of proponents for a public-private partnership project for new indoor ice surfaces, City Council approved the following motion:
That staff follow up on the Request for
Qualifications received from two community groups within the former
municipality of West Carleton and recommend on the feasibility of financing and
constructing an ice surface outside of this P3 process.
The
two community-based proposals were from the West Carleton Minor Hockey
Association proposing a one-pad facility as an addition to the West Carleton
Secondary School (WCSS), and the second was from the Carp Agricultural Society
proposing a new one-pad facility on the fairgrounds linked to the existing W.
Erskine Johnston Arena. These proposals
did not qualify for the short list under the P3 terms and process
established. However, in recognition of
the community involvement and commitment shown by the proposals along with the
capital reserves that were already in place in former West Carleton, staff was
directed to consider these proposals on their own merits and to identify a
preferred site for a new indoor ice surface in West Carleton.
On
a City-wide basis, the need to develop additional ice surfaces is well
documented and is illustrated by extensive community support and demand for new
facilities. The Facility Needs Study
recently completed by the City indicated a need for up to ten new ice surfaces
over the coming decade, based on a Council-approved community infrastructure
framework arena service ratio of 1:20,000.
By September 2005, the equivalent of 41 community ice surfaces will be
in operation, serving a City population estimated at 875,000. This translates to a ratio of 1:23,700. By 2007, the City's population is expected
to reach 920,000, which will require a total of 46 arenas to meet the approved
service level. Consequently, an additional
4 ice surfaces will have to come on-line by 2007 to maintain arena service
ratios.
It
is important to note that several existing community arenas are approaching the
end of their facility life. The west
end Belltown Dome arena is scheduled to be de-commissioned by the end of 2006,
and two other centennial-era arenas are scheduled to be taken off-line by
2009. Such imminent arena closings will
put additional pressure on the City to develop new arena facilities across the
city.
On
a district and community basis, the former municipality of West Carleton had
long recognized a lack of arena facilities to meet the demand of local users,
and had accumulated capital reserves for the future construction of a new arena
in the municipality. Based on these reserves,
in September 2003, Council approved a new capital project entitled “West
Carleton Arena” in the amount of $1.165 million for the planning, design and
construction of the facility.
Site
Selection Process
In
the summer of 2003, Parks and Recreation staff initiated a site selection
process to evaluate the two sites proposed by West Carleton community groups
for a new arena facility:
1. West
Carleton Secondary School (WCSS), Dunrobin Road
2. Carp
Fairgrounds, Carp Road
Staff
developed ten site evaluation criteria to define objective characteristics of
the “ideal” site for a new arena in West Carleton. The ten draft criteria were:
Criteria |
Application |
Centrality to area
population |
Sites that are generally central to the various population areas
within West Carleton will be scored higher |
Building development and
site services |
Sites that have normal development, infrastructure and servicing
costs will be scored higher |
Constraints on
timing/cost of development |
Sites without constraints that may contribute to significant delays
in construction and therefore affect timing of development will be scored
higher |
Suitability for current
needs and future expansion |
Sites that will accommodate the planned facility, the required
parking, and future expansion will be scored higher |
Integrated and
coordinated programming |
Sites where adjacent land uses complement the facility, and
contribute to an enhanced or integrated level of service for users, will be
scored higher |
Outlying settlement
areas |
Sites in outlying population centres within West Carleton at a
distance from existing arena facilities will be scored higher |
Environmental impact |
Sites where the proposed facility will be compatible with surrounding
land uses will be scored higher |
Proximity to major
traffic routes in West Carleton |
Sites where at least one boundary fronts on a major arterial road
that could provide direct access will be scored higher |
Site acquisition/value |
Sites with low acquisition costs will be scored higher |
Significant operational
cost savings |
Sites where there are opportunities that allow the City to more
efficiently or effectively operate the facility in a manner that will
contribute to long-term cost savings will be scored higher |
In
summer and fall 2003, engineering consultants were engaged to undertake a water
supply, waste water (septic) and geotechnical review of the two sites to
determine potential constraints and costs associated with development of an
arena facility. This review was
initiated to provide base data for the application of the site evaluation
criteria.
In
November 2003, a public open house was held at the Kinburn District Service
Centre to present the draft site evaluation criteria to the West Carleton
community and obtain input as to the validity and the relative importance of
each of the criteria. During the open
house, a survey was distributed to those in attendance. The survey listed the evaluation criteria in
random order and requested that respondents rank them in order of
importance. Well over one hundred
members of the community attended the open house and a similar number completed
and submitted the criteria ranking survey.
The results were tabulated and produced the following ranking of
criteria, in order of importance to the community:
1. Suitability
for current needs and future expansion
2. Centrality
to area population
3. Significant
operational cost savings
4. Building
development and site services
5. Integrated
and coordinated programming
6. Proximity
to major traffic routes in West Carleton
7. Site
acquisition/value
8. Outlying
settlement areas
9. Constraints
on timing/cost of development
10. Environmental impact
While
the community responded positively to the open house and participated fully in
the ranking of site evaluation criteria, two dominant issues emerged from
discussions with participants: 1) a
desire to expand the evaluation beyond the two Council-directed sites,
and; 2) an urgency to select a site in
order to proceed to the development stage and rally the whole West Carleton
community behind the project.
Residents
of various West Carleton communities, such as Constance Bay, Fitzroy Harbour,
Dunrobin and Kinburn, requested that sites in their communities also be
considered and evaluated. Residents
felt there was a lack of recreational facilities in the northern portion of the
ward and that new facilities should not be located in the south where
communities were already served by arena facilities.
In
December 2003, a new Ward Councillor took office in West Carleton. In a meeting with Councillor El-Chantiry in
January 2004, staff was asked to consider other optional sites for a new arena
facility in West Carleton, based on the rationale that a more comprehensive
evaluation would legitimize and expedite the site selection process. In order to ensure community support, a
range of sites should be evaluated against the approved site selection
criteria, including the Carp and WCSS sites.
This comprehensive approach would allow Council to make an informed
decision in accordance with its February 2003 directions.
Parks and Recreation and Real Property Asset Management staff subsequently developed an expanded list of sites in West Carleton that could accommodate a new arena facility. All sites with the exception of WCSS, are owned by the City.
· West Carleton Secondary School
· Carp Fairgrounds
· Dunrobin Community Centre
· Constance Bay Community Centre
· Kinburn District Service Centre
· Fitzroy Harbour Community Centre
Engineering
consultants were retained to study the water, septic and geotechnical
conditions of the additional sites to inform the evaluation process. Preliminary site plans were prepared for all
sites to determine the impact of new arena facilities on each site.
With
the completion of site plan and geotechnical studies in the summer of 2004, a
staff project team evaluated each site on a point scale which reflected the
relative importance of each criteria as determined by the community. This "weighted" evaluation
produced the following results:
Site
Evaluation Results
Site: |
Points: |
1. Carp Fairgrounds |
|
2. Kinburn District Service Centre |
49 |
3. Constance Bay Community Centre |
37 |
4. Fitzroy Harbour Community Centre |
36 |
5. Dunrobin Community Centre |
34 |
6. West Carleton Secondary School |
23 |
The
following is a summary of the advantages and disadvantages of each site:
CARP
FAIRGROUNDS 3832
Carp Road (3.0 ha)
|
|
Advantages |
Disadvantages |
o Twining with W. Erskine Johnston Arena |
o
Carp already
served by existing arena |
o Operational cost savings |
o Relocation of ball diamond and outdoor rink required |
o Integrated programming with Agricultural Fair |
o One seasonal ice pad; one year-round ice pad |
o Opportunity for tournament and multiple programming |
|
o Existing municipal services |
|
o On major road |
|
o No site acquisition costs |
|
o Would replace aging Huntley CC |
|
o Reduced requirement for parking |
|
The Carp site is ranked
high based primarily on the potential to twin W. Erskine Johnston Arena and the
availability of existing municipal water supply and sewer services. The Carp fairgrounds site can absorb a second
ice surface, however this will concentrate all arena facilities in the southern
area of West Carleton, leaving the central and northern area under-served. A second arena will also displace a ball
diamond and the outdoor rink on the fairgrounds site.
KINBURN DISTRICT SERVICE
CENTRE 5670 Carp Road (4.0 ha)
|
|
Advantages |
Disadvantages |
o Suitable size for twin pad facility |
o Well water treatment required |
o Central to West Carleton population |
o Higher cost anticipated for sewage disposal |
o On major road |
o Zoning amendment required |
o No site acquisition costs |
|
o Potential for integrated programming and operations with District Service Centre |
|
o Reduced requirement for parking |
|
The Kinburn site is
ranked high due to its central location and the integration opportunities with
the former West Carleton Town Hall (currently the District Service
Centre). The site also can accommodate
a twin arena, without displacing existing recreational facilities. The district service centre is a modern,
attractive, functional but under-used facility. There is potential to
physically link the former town hall to the new arena, creating joint
recreational and community programming opportunities. There will be additional servicing and operating costs associated
with well water and septic systems.
Existing zoning is institutional, which will require amendment to add an
arena as a permitted use.
CONSTANCE BAY COMMUNITY CENTRE 262 Len Purcell Drive (4.1 ha)
|
|
Advantages |
Disadvantages |
o Suitable size for twin pad facility |
o Not on major traffic route, limited accessibility |
o Under-serviced area |
o Traffic impact on Constance Bay community |
o No site acquisition costs |
o Impact on environmentally sensitive Torbolton Forest |
o Well water and soils for sewage disposal acceptable |
o Development contrary to designated “Natural Environment Area” in Official Plan |
|
o Well water treatment required |
The Constance Bay site
was ranked lower due to its location in a residential community adjacent to an
environmentally sensitive area (Torbolton Forest). While the site can accommodate a twin facility and associated
parking, this would result in the loss of sportsfields, play areas or the skate
board park. The Torbolton Forest would
restrict the relocation of these facilities.
The main advantage of an arena in Constance Bay is that it would offer
recreational opportunities to a significant under-serviced residential area in
West Carleton.
FITZROY HARBOUR COMMUNITY CENTRE 100 Clifford Campbell Street (5.8 ha)
|
|
Advantages |
Disadvantages
|
o Suitable size for twin pad facility |
o Not on major traffic route, limited accessibility |
o Under-serviced area |
o Traffic impact on Fitzroy Harbour community |
o No site acquisition costs |
o Well water treatment required |
|
o Higher cost anticipated for sewage disposal |
The Fitzroy Harbour site
is similarly disadvantaged as the Constance Bay location in that it is located
on a local road in a residential area and would lose existing sportsfields
should an arena facility and associated parking be developed on site. There would be additional servicing and operating
costs associated with well water and septic systems. An arena located in Fitzroy Harbour would, however benefit the
under-served northern area of West Carleton.
DUNROBIN COMMUNITY CENTRE 1151 Thomas Dolan Parkway (3.9 ha)
|
|
Advantages |
Disadvantages |
o
Central to
West Carleton population |
o Loss of sportsfields to accommodate new facility |
o Under-serviced area |
o Requirement to purchase adjacent property to accommodate facility and relocate sportsfields |
o On major road |
o Potential impact on adjacent residences |
o Well water and soils for sewage disposal acceptable |
o Rezoning required for adjacent property |
The Dunrobin Community
Centre site scored lower in the evaluation due to a requirement to purchase
adjacent property to accommodate the arena facility and associated parking,
without loss of existing sportsfields.
The adjacent property would require re-zoning to permit the arena
development, which would impact adjacent residences. The primary advantage of the site is a location in an
under-served area, central to West Carleton.
WEST CARLETON SECONDARY
SCHOOL 3088 Dunrobin Road
|
|
Advantages |
Disadvantages |
o Integrated programming with school facilities |
o
High cost of
water supply and treatment |
o Reduced requirement for parking |
o High cost of septic system upgrade and expansion |
o Central to West Carleton population |
o No opportunity for future twinning – single pad only |
o Under-serviced area |
o Loss of sportsfields to accommodate facility |
o On major road |
o Loss of revenue during school use |
o No site acquisition costs |
|
The West Carleton
Secondary School site scored the lowest in the evaluation primarily due to the
serious challenges of water supply and waste treatment. Poor water quality on-site would necessitate
securing a well source off-site and piping water a significant distance to the
arena facility, at a high capital and annual operating cost. The existing school septic system would have
to be upgraded and expanded to accommodate the new facility. Unless WCSS would accept the loss of
sportsfields, the site could only accommodate a single ice pad. The main benefits of the site are a central
Dunrobin location and programming opportunities with WCSS.
The
results of the evaluation show that the Carp Fairgrounds and the Kinburn
District Service Centre were tied as the two highest ranked sites. While both would make viable sites for a new
arena facility in West Carleton, the Kinburn site is preferred, based on
the following rationale:
Capital Funding
There is $1.1 million available in the approved
capital project and $600,000 collected in development charges, for a total of
$1.7 million available for the development of a new arena facility in West
Carleton. The community and the ward
councillor have committed to fundraise an additional $500,000 for the project,
for a total of $2.2 million available in capital funding.
A new single pad linked to W. Erskine Johnston Arena
in Carp is estimated to cost $6 - 8 million, while a new twin pad facility in
Kinburn is estimated at $12 - 14 million, resulting in a capital shortfall of
$4 - 6 million for the Carp option and $10 - 12 million for Kinburn. The City's Community Infrastructure Strategy
and the long-range capital forecast would not foresee new capital funding for
this initiative before 2008. Unless
alternative sources of capital funding are found, a new municipally funded
arena facility in West Carleton would not open until 2010 at the earliest.
Public Private Partnership (P3) Option
There has been recent significant, unsolicited
interest shown by the private sector to develop and operate a new arena
facility in West Carleton in partnership with the City. The Kinburn site represents an opportunity
for P3 delivery of a new twin arena facility, while the Carp site is best suited
to a traditional municipal/community delivery model. The Kinburn site has vacant land and an under-used district
service centre, providing potential for innovative design and integrated
facility operations. As Carp's W.
Erskine Johnston Arena is City-owned and operated, it would be more appropriate
for the City to fund and operate a second ice surface linked to the existing
facility.
Should Council approve a P3 implementation strategy
for a new arena facility at Kinburn, no new City capital funding would be
required. A best-case scenario could
see a new twin pad arena at Kinburn in operation by the end of 2006, if
implemented through a P3 initiative. A
new City funded arena in Carp would be unlikely to open before 2010.
Community Programming
The Kinburn site offers
potential for community-wide integration of recreation and municipal
services. The Kinburn District Service
Centre is centrally located in West Carleton and, befitting its former role as
a Town Hall, has the potential to be a focal centre for the whole West Carleton
community. The district service centre
has under-used capacity that could offer cross-programming and operations
opportunities for P3 arena proponents.
A new arena facility should complement the distinctive rural
architecture of the former town hall and help ensure the long-term viability of
this community facility.
The Carp site offers
limited opportunity for local area integration of services. The twinning of the Carp arena would involve
the replacement of the Huntley Community Centre and its local programming
functions.
Community Input:
A public meeting was held on September 29th, 2004 to present the results of the site evaluations and the proposed implementation strategy. Overall, the residents in attendance at the public meeting reacted positively to the evaluation results and staff's recommendation of the Kinburn District Service Centre as the site for a new twin pad arena, developed as a P3 project. There was considerable disappointment expressed by the proponents of the West Carleton Secondary School site, most notably by students who presented a petition to the Ward Councillor requesting that the arena be located at the school. After much discussion, there was general acceptance that the WCSS site was not a viable option given the site's significant water supply and waste treatment challenges.
The prevailing sentiment
at the public meeting was to put the site selection issue to rest and proceed
with implementation of an arena facility to serve the needs of West Carleton
users as quickly as possible. As the
Kinburn P3 option had the potential to deliver a new facility several years
ahead of City funded facilities in Carp or elsewhere, there was strong support
for this option.
The public meeting also
saw a re-commitment by the community to raise $500,000 in funding to support
the arena project.
P3 Implementation Strategy:
Incentives:
A business case can be made for a twin ice pad facility in Kinburn. Based on the current community demand for ice time in West Carleton and the west end in general, staff have estimated that if a new twin ice pad were in operation today at Kinburn, 90% of all prime ice time (weekends and weekday evenings) during the regular season (October 1st to March 31st) would be booked. A Kinburn facility open in 2007 would see 100% of prime ice time booked, based on projected population increases and demand.
The City has recently
executed five P3 agreements where risk was shared between the municipality and
the private sector. Two of these
agreements involved the development of arena facilities, where the City was
granted a fixed amount of community ice time within the facility in exchange
for the municipality guaranteeing the long-term loan on the property.
In these two agreements, initial capital outlay from the City was avoided, however financial incentives may be a useful tool to gain the interest of investors in advancing the development of a West Carleton arena facility. Other incentives that can be leveraged include the City's vacant land at the Kinburn site as well as the existing district service centre facility, which could be leased in whole or in part to a P3 proponent. The benefit of including the district service centre in the partnership would be to give the proponent the ability to link the existing building with the new arena to integrate the space required for the profitable operation of the total facility. Potential uses of the district service centre include, assembly, banquet and meeting space and/or training, clinic, office and storage space. Any benefit to the developer under this option would translate into a greater amount or lower cost of community ice time for the City.
Request for Proposals:
To advance the development of a new arena facility at the Kinburn District Service centre, staff is proposing that a Request for Proposals (RFP) be prepared and released once appropriate incentives are determined. The RFP could include all of the City lands at 5670 Carp Road and the district service centre. In return the City would receive a defined amount of community ice time as per the conditions that would be included in the RFP and further negotiated in a partnership agreement.
In developing the RFP, it is necessary to clearly identify the goals and objectives of the City in entering into a possible partnership with a private sector partner and understand the principles and framework that will underlie the development of a successful partnership. Staff will report back to Committee and Council in early March 2005 with the proposed principles for the partnership and the framework for the RFP.
Next Steps and Timelines:
Should council approve a P3 implementation strategy for a new arena facility at the Kinburn District Service Centre, the following implementation timeline is anticipated:
• City Council Approval and Issuance of RFP March 2005
• Selection of Preferred Partner May 2005
• City Council Approval to Negotiate Agreement June 2005
• Complete Negotiations with Preferred Partner, incl. Public Consultation Nov. 2005
• Complete Construction Nov. 2006
• Facility Open Dec. 2006
ENVIRONMENTAL IMPLICATIONS
A preliminary site plan prepared for a twin arena on the Kinburn District Service Centre site indicates that the facility and required parking can be accommodated without significant environmental impact. Any minor impacts will be identified and mitigated through the site plan control process.
The
Kinburn District Service Centre is the site of the former West Carleton Town
Hall and acts as the municipal service point for this western rural
community. The addition of a new arena
facility will complement and reinforce the Kinburn site as a multi-service
centre for the rural residents of West Carleton. The Kinburn site is zoned institutional and will require a zoning
amendment to add an arena as a permitted use.
Two public meetings were held as part of the site selection process for a new arena facility in West Carleton. The first was held in November 2003 to review and rank draft site evaluation criteria in order of importance to the community. A survey was distributed at the meeting and over one hundred surveys were completed and returned. The second meeting was held in September 2004 to present the results of the site evaluation, the recommended site and the proposed means of implementation.
There are no financial implications to the approval of the
recommendations of this report.
DISPOSITION
Staff will prepare the proposed P3 principles and framework for the project and report back to Council for authority to issue an RFP for a new arena facility at the Kinburn District Service Centre. Staff will prepare a zoning amendment application for the addition of an arena as a permitted use in the existing institutional zoning of the Kinburn Client Service Centre.