4. LAND EXCHANGE - 1048219 ONTARIO INC.
(REGIONAL GROUP) – WEST RIDGE SUBDIVISION

ÉCHANGE DE TERRAINS - 1048219 ONTARIO INC.
(GROUPE RÉGIONAL) – LOTISSEMENT DE WEST RIDGE

 

 

 

Committee Recommendations as amended

 

That Council:

 

1. Declare the parcel of vacant land, consisting of approximately 9.76 ha (24.12 ac), described as being part of Lot 3, Concession 9, geographic Township of Cumberland, designated as Parts 1 to 4 Plan 5OR-633 and known municipally as 2360 Trim Road, and shown on Annex “A” attached, as surplus to the City's needs;

 

2. Waive City policy pertaining to the internal and external circulation, notice and the marketing of surplus properties and authorize staff to sell the property outlined in Recommendation 1;

 

3. Approve the sale of the land detailed in Recommendation 1 to 1048219 Ontario Inc. (Regional Group), in exchange for a parcel of vacant land consisting of approximately 6.968 ha (17.2 ac), described as being part of Block 112, Registered Plan 4M-1057, geographic Township of Goulbourn, and shown on Annex “C”, all for the nominal sum of $1.00 plus GST, and subject to:

 

a) the completion of legal surveys;

b) any easements that may be required;

c) the execution of an Agreement of Purchase and Sale acceptable to the General Manager, Corporate Services;

d) completion of the Blackburn Hamlet Bypass Extension Environmental Assessment resulting in a modified alignment and;

e) the City not assuming any other costs related to developing the West Ridge Subdivision or complying with agreements associated with this development.

 

 


 

 

 

Recommandations modifiÉes du comité

 

Que le Conseil :

 

1. déclare comme excédentaire aux besoins de la Ville la parcelle de terrain non bâtie, d’une superficie approximative de 9,76 ha (24,12 ac), décrite comme faisant partie du lot 3, concession 9, dans le canton géographique de Cumberland, désignée comme les parties 1 à 4 du Plan 5OR-633 et connue à la Ville d’Ottawa comme le 2360, chemin Trim, figurant dans l’Annexe A ci-jointe;

 

2. déroge à la politique de la Ville touchant à la diffusion, aux avis et au marketing intérieurs et extérieurs des propriétés excédentaires, et d’autoriser le personnel à vendre le terrain décrit dans la Recommandation 1;

 

3. approuve la vente du terrain décrit dans la Recommandation 1 au groupe régional 1048219 Ontario Inc., en échange d’une parcelle de terrain non bâtie d’une superficie approximative de 6,962 ha (17,2 ac), décrite comme faisant partie du bloc 112, Plan enregistré 4M-1057, et située dans le canton géographique de Goulbourn, figurant dans l’Annexe C, le tout pour la somme symbolique de 1 $ (TPS en sus), sous réserve de ce qui suit :

 

a) la réalisation des levés officiels;

b) les servitudes qui pourraient être requises;

c) la signature d’une convention d’achat-vente acceptable pour la Directeur  général, Services généraux;

d) d’achever l’évaluation environnementale sur le prolongement de la rocade de Blackburn Hamlet qui entraînera un changement du tracé;

e) la Ville n’assumera aucun autre frais lié à l’aménagement du lotissement de West Ridge ou à la conformité aux ententes se rapportant à cet aménagement.

 

 

 

 

Documentation

 

1. Corporate Services Department General Manager's report dated 15 September 2003 (ACS2003-CRS-RPR-0069).

 

2. Extract of Draft Minutes, 16 September 2003.

 

 


 


Report to/Rapport au :

 

Corporate Services and Economic Development Committee

Comité des services organisationnels et du développement économique

 

and Council / et au Conseil

 

15 September 2003 / le 15 septembre 2003

 

Submitted by/Soumis par : Kent Kirkpatrick, General Manager/Directeur général,

Corporate Services/Services généraux 

 

Contact Person/Personne ressource : Doug.McCaslin, Manager

Real Property Asset Management/Gestion des actifs et des biens immobiliers

(613) 580-2424 x 22595, Douglas.McCaslin@ottawa.ca

 

Ref N°: ACS2003-CRS-RPR-0069

 

 

SUBJECT:

LAND EXCHANGE - 1048219 ONTARIO INC.
(REGIONAL GROUP) – WEST RIDGE SUBDIVISION

 

 

OBJET :

ÉCHANGE DE TERRAINS - 1048219 ONTARIO INC.
(GROUPE RÉGIONAL) – LOTISSEMENT DE WEST RIDGE

 

 

REPORT RECOMMENDATIONS

 

That should Council wish to proceed with a land exchange to acquire the westerly portion of the West Ridge Phase IIIB subdivision lands to settle the matter of the boundary of the Provincially Significant Wetlands that is now the subject of an appeal before the Ontario Municipal Board, it is recommended:

 

That the Corporate Services and Economic Development Committee recommend Council:

 

1. Declare the parcel of vacant land, consisting of approximately 9.76 ha (24.12 ac), described as being part of Lot 3, Concession 9, geographic Township of Cumberland, designated as Parts 1 to 4 Plan 5OR-633 and known municipally as 2360 Trim Road, and shown on Annex “A” attached, as surplus to the City's needs;

 

2. Waive City policy pertaining to the internal and external circulation, notice and the marketing of surplus properties and authorize staff to sell the property outlined in Recommendation 1;

 

3. Approve the sale of the land detailed in Recommendation 1 to 1048219 Ontario Inc. (Regional Group), in exchange for a parcel of vacant land consisting of approximately 6.968 ha (17.2 ac), described as being part of Block 112, Registered Plan 4M-1057, geographic Township of Goulbourn, and shown on Annex “C”, all for the nominal sum of $1.00 plus GST, and subject to:

 

a) the completion of legal surveys;

b) any easements that may be required;

c) the execution of an Agreement of Purchase and Sale acceptable to the General Manager, Corporate Services;

d) completion of the Blackburn Hamlet Bypass Extension Environmental Assessment resulting in a modified alignment and;

e) the City not assuming any other costs related to developing the West Ridge Subdivision or complying with agreements associated with this development.

 

 

RECOMMENDATIONS DU RAPPORT

 

Que dans l’éventualité ou le Conseil municipal désirerait procéder à un échange de terrains afin d’acquérir la partie Ouest du lotissement de la phase IIIB de West Ridge en vue de régler la question de la limite des terres humides d'importance provinciale qui fait l’objet actuellement d’un appel devant la Commission des affaires municipales, il est  recommandé:

 

Que le Comité des services organisationnels et du développement économique recommande au Conseil :

 

1. de déclarer comme excédentaire aux besoins de la Ville la parcelle de terrain non bâtie, d’une superficie approximative de 9,76 ha (24,12 ac), décrite comme faisant partie du lot 3, concession 9, dans le canton géographique de Cumberland, désignée comme les parties 1 à 4 du Plan 5OR-633 et connue à la Ville d’Ottawa comme le 2360, chemin Trim, figurant dans l’Annexe A ci-jointe;

 

2. de déroger à la politique de la Ville touchant à la diffusion, aux avis et au marketing intérieurs et extérieurs des propriétés excédentaires, et d’autoriser le personnel à vendre le terrain décrit dans la Recommandation 1;

 

3. d’approuver la vente du terrain décrit dans la Recommandation 1 au groupe régional 1048219 Ontario Inc., en échange d’une parcelle de terrain non bâtie d’une superficie approximative de 6,962 ha (17,2 ac), décrite comme faisant partie du bloc 112, Plan enregistré 4M-1057, et située dans le canton géographique de Goulbourn, figurant dans l’Annexe C, le tout pour la somme symbolique de 1 $ (TPS en sus), sous réserve de ce qui suit :

 

a) la réalisation des levés officiels;

b) les servitudes qui pourraient être requises;

c) la signature d’une convention d’achat-vente acceptable pour la Directeur  général, Services généraux;

d) d’achever l’évaluation environnementale sur le prolongement de la rocade de Blackburn Hamlet qui entraînera un changement du tracé;

e) la Ville n’assumera aucun autre frais lié à l’aménagement du lotissement de West Ridge ou à la conformité aux ententes se rapportant à cet aménagement.

 

BACKGROUND

 

Planning and Development Committee (Report 56, Item 24) carried the following motion on 24 July 2003 as part of its consideration of the Development Services Department report (Ref. ACS2003-DEV-APR-0174) dealing with an appeal before the OMB regarding the extent of the Provincially Significant Wetlands associated with the Upper Poole Creek Watershed in the West Ridge IIIB subdivision:

 

Therefore be it resolved that staff be directed to explore avenues for the exchange of lands by the City with the lands in the westerly portion of West Ridge IIIB and this matter be undertaken expeditiously with a progress report to Council by 27 August 2003.

 

As a result of the power blackout, the 27 August 2003 Council meeting was postponed to 3 September 2003. On 29 August 2003 staff provided the following progress report to members of Council:

 

Several options were explored with the owners of West Ridge (1048219 Ontario Inc. – Regional Group). This resulted in only one City-owned property being identified as a possible option for a proposed land exchange.  The parcel, with exchange potential, is located on Trim Road.

 

The Trim Road property is part of a larger parcel owned by the City.  An exchange would require a severance.  Part of the land is currently used for interim snow storage and a portion of the City’s holding will be required for part of the lands for the proposed Blackburn Hamlet By-pass.  The lands being proposed for possible exchange lie to the north of the by-pass.

 

Staff has obtained appraisal reports on both the West Ridge property and the City lands lying north of the proposed by-pass.  These reports indicate comparable values for both properties indicating a potential for completing a land exchange for $1.00.

 

An internal circulation is in the process of being finalized.  Ongoing discussions will continue with TUPW in this regard based on the impact of the ongoing need for the use of the Trim Road site for snow disposal purposes.

 

Subject to the disposition by Council of the West Ridge IIIB matter, staff intends to bring forward a report to CSDEC on 16 September 2003 and Council on 24 September 2003 seeking approval to enter into negotiations with West Ridge with respect to the terms of a possible land exchange. If suitable terms can be negotiated, staff will subsequently report to CSEDC and Council either seeking approval for the land exchange or confirming that a mutually agreeable settlement could not be reached.  The Ontario Municipal Board has adjourned the hearing scheduled for 15 September 2003 pending the determination of Council’s position on the land exchange.  The Board has scheduled 26 September 2003 for the receipt of an update.

 

 

On 3 September 2003 Council approved the motions of the Planning and Development Committee regarding the West Ridge Phase IIIB subdivision (Report 56, Item 24). Staff has continued to pursue the possibility of a land exchange.  The Discussion Section of this report outlines the staff findings and details a potential course of action to achieve a land exchange if Council wishes to settle the matter of the wetland boundary within the subdivision, which is now the subject of an appeal to the OMB.

 

DISCUSSION

 

The internal and utility circulation regarding the possible disposal of the 2360 Trim Road property as shown on Annex “A” was initiated on 6 August 2003 with a due date of 20 August 2003. As of 5 September 2003, only one response was not received (Hydro One).

The responses received from internal stakeholders and subsequent follow-up with appropriate staff indicate the following:

·      Development Services (Infrastructure Approvals & Transportation Planning) responded to the circulation that the Blackburn Hamlet Bypass Extension might require a portion of this property subject to finalizing the preferred alignment for the right of way through an Environmental Assessment (EA) amendment process.

Discussions with Transportation Planning staff confirmed that the analysis and evaluation carried out to date with respect to the EA amendment is leading to a preferred option that would swing the alignment south of the property as shown in Annex “B”. This means that when the EA amendment is complete, the property in question may no longer be affected by the Bypass alignment.

The EA amendment process is not yet complete. It is anticipated that the analysis and report will be completed by the end of September 2003.  The 30-day public review notice would then be posted in early October 2003. The preferred alignment may be approved as early as November 2003.

·      The response to the circulation indicated the site is currently being used by Transportation Utilities and Public Works (TUPW Surface Operations - East) as an interim Snow Disposal Facility (SDF) for the Cumberland/ Orleans area pending completion of studies and approvals for the proposed Innes/Mer Bleue permanent SDF that would allow the Trim Road SDF to be closed.

On 10 September 2003, an on site meeting was held with TUPW staff to identify the location of:

(a)  the portion of the property currently being used as an interim site for snow disposal and;

(b) the potential area that may be required, in the event that the studies indicate a permanent SDF, is subsequently needed somewhere on the Trim Road property.

This review indicated that the current interim snow disposal activities take place to the south portion of the property shown on Annex “A”, which may form part of a land exchange. 

It was also determined that the development of currently vacant lands within the Urban Boundary adjacent to the City’s property together with the future alignment for Blackburn Hamlet Bypass Extension would require that any permanent SDF in this vicinity would have to be relocated to the south west portion of the property. It was agreed that the approximate 40.4 ha (100 ac) portion of the property south of the preferred alignment for the Bypass Extension should be retained until a permanent SDF site for the Orleans/Cumberland area has been approved.

In summary, it was concluded that the proposed land exchange should not interfere with the current or future SDF operations on this property provided that the City retains that portion of the property which is located to the south of the preferred alignment for the Bypass Extension.

·      Emergency and Protective Services (Fire Services) may be interested in this site for a new East station.

Based on the input from Transportation Planning regarding the preferred alignment for the Bypass Extension, as shown on Annex “B”, there will be approximately 4.5 ha (11 ac) of additional City lands adjacent to the lands shown on Annex “A”. These could be located north of the Bypass right of way and then be included in the Urban Area if this is deemed to be appropriate at that time.

From the review of internal stakeholder interests, it is clear that any land exchange involving the portion of the City’s property at 2360 Trim Road as shown on Annex “A” must be conditional on the preferred alignment for the Blackburn Hamlet Bypass Extension being approved.

The solicitor for 1048219 Ontario Inc. / The Regional Group has been informed that the approval process for the Bypass Extension EA Amendment is likely to take approximately three (3) months to complete. He has responded that this would be an acceptable time frame for closing a transaction provided the Council authority to proceed with the land exchange is in place by 26 September 2003, since he must advise the OMB at that time as to whether the appeal before the Board should proceed.

As a result land exchange might, therefore, be made as follows:

1.    The land exchange would be for $1.00.

2.    The land exchange would be conditional on:

a.     the completion of legal surveys;

b.     any easements that may be required;

c.     the execution of an Agreement of Purchase and Sale acceptable to the General Manager, Corporate Services;

d.     completion of the Blackburn Hamlet Bypass Extension Environmental Assessment resulting in a modified alignment and;

e.     to the City not assuming any other costs related to developing the West Ridge Subdivision or complying with agreements associated with this development

3.    The City would declare surplus, and convey approximately 9.76 ha (24.12 ac) of the City’s 58.6 ha holding (144.8 ac) as shown on Annex “A”.

4.    The City would retain the remaining 48.8 ha (120.68 ac) of the 2360 Trim Road property (approximately 48.844 ha or 120.68 ac) to provide for the right of way requirements for the Blackburn Extension Bypass, an interim and potential permanent Snow Disposal Facility site, and a possible site for other potential future City needs such as a Fire Station. 

5.    1048219 Ontario Inc. / The Regional Group would convey to the City the westerly portion of the Phase IIIB West Ridge Subdivision lands consisting of approximately 7 ha (17.2 ac) as shown on Annex “C”.

Two independent appraisals have been completed for the potential land exchange that indicate comparable values for both properties and the potential for completing a land exchange for $1.00.  There are substantial differences in the type of, and development time frame/potential for, the two parcels that can affect value.

 

If the land exchange does not proceed, a favourable decision from the OMB regarding the appeal would allow the subdivision approvals to be finalized. It is anticipated that the land would then be serviced and sold within a one-year period. The two independent appraisals received by the City have been based on these assumptions although there is no guarantee that this will in fact prove to be the case.

 

The developer has indicated a profit expectation (based on the developer’s anticipated timing, costs and lot sales) that would make the cost to the City for the direct purchase of the westerly portion of the Phase IIIB lands more than 1.5 times the appraised value of the property if acquired by purchase, rather than by land exchange.

 

The City’s property as shown on Annex “A” is in a location, which because of the uncertainty of the alignment for Blackburn Bypass Extension and transit corridors, and current market conditions, and activities, is considered by the independent appraisals to be land, which may not be developable for five (5) years. However, based on applications for draft plan approval for residential subdivisions on nearby lands, and the status of the Blackburn Hamlet Bypass EA amendment, it is entirely possible that with appropriate market demand, these lands might be developable within as early as a two year time frame. This would increase the land value significantly to perhaps as much as double the value.

 

Clearly, the basis upon which the West Ridge developer would make the land exchange is predicated on the risk/reward of trading land for which development is imminent for land that is currently not likely to be developed for five (5) years and bringing this land to market much earlier and reaping the resulting reward from taking the calculated risk.

 

The City, for its part, must look at the potential value of the City’s site on Trim Road over the next few years relative to:

 

(a)  the value of the lands being acquired in the West Ridge Subdivision;

 

(b)  the resulting cost/benefit associated with ensuring the Upper Poole Creek Wetlands are fully protected within the proposed West Ridge Phase IIIB subdivision; and

 

(c)  the possible increase in value of the Trim Road property as the development horizon  gets closer over the next few years as a potential increased revenue source.

 

In this respect it is noted that the current application by the developer before the OMB protects approximately 2.95 ha (7.3 ac) of wetland and associated buffer zone within the westerly portion of Phase IIIB. Acquisition of this property by the City would increase this by another 4.01 ha (9.9 ac). Based on the current appraised value of the properties in the land exchange this would represent an acquisition cost of approximately $126,000 per acre for the additional wetland/buffer zone

 

In addition, any land exchange should be conditional on the City not incurring any further costs associated with the development of the West Ridge Subdivision, such as collect backs for Abbot Street and cost sharing for the extension of West Ridge Drive.

 

The time frame associated with completing a transaction before the end of December 2003 is related to settling the matter currently being appealed to the OMB and also to the current uncertainty as to whether, or when, the preferred alignment for the Blackburn Bypass Extension will be approved. As a result, it will be necessary to provide authority to the General Manager of Corporate Services to negotiate and execute agreements for the conveyance of the property shown on Annex “A” property and the acquisition of the westerly portion of the West Ridge Subdivision Phase IIIB lands, as shown on Annex “C”.

 

ENVIRONMENTAL IMPLICATIONS

 

As set out in the motions regarding this matter that were approved by City Council on 3 September 2003, the relevant Official Plan policies indicate that Council should seek the advice of the Ministry of Natural Resources (MNR) for matters pertaining to Provincially Significant Wetlands. The MNR has reiterated that the most recent wetland boundary interpretation, which shows the wetland extending to the northerly most limit of the westerly portion of the West Ridge Subdivision Phase IIIB, remains the information upon which the City should base subdivision design decisions.

The developer’s application before the OMB does not follow this most recent boundary but a previous boundary, which existed at the time of making the subdivision application.

Council has established policies for the protection of environmental lands that are of provincial and regional significance including avenues of acquisition such as a land exchange. Therefore, a land exchange would be in accordance with these policies; settle the matter before the OMB; and ensure that the maximum amount of wetland and buffer is protected as development of Phase IIIB of the West Ridge Subdivision proceeds.

There are no other known environmental implications in approving this land exchange, and the City will complete an up to date environmental site assessment as part of its due diligence process if Council should wish to proceed with the land exchange.

 


CONSULTATION

 

In accordance with policies approved by City Council on 14 November 2001, the availability of the property was circulated to all client City Departments, including the Housing Branch and the Comprehensive Asset Management Division and also to utility agencies to determine if it should be retained by the City to be used in conjunction with any mandated program. The interest expressed by internal stakeholder and the resulting consultation with these stakeholders has been documented previously in the Discussion Section of this report.

 

External agencies were not circulated.

 

The Ward Councillor initiated the motion approved by Council with respect to exploring the possibility of a land exchange; has been consulted during the review process; and has subsequently been advised that a land exchange appears possible if Council wishes to proceed with that option.

 

FINANCIAL IMPLICATIONS

 

Should Council wish to proceed with the land exchange as set out in this report:

The net cost to the City for the acquisition of the westerly portion of the West Ridge Subdivision Phase IIIB lands is $1.00 plus GST, which will be funded from the Environmental Resources Area Acquisition Capital Account 900138-506143.

The transaction revenue for the City owned parcel at 2360 Trim Road is $1.00 plus GST, and will be credited to Profit Centre 119909-407217.

 

SUPPORTING DOCUMENTATION

 

Attached as Annex “A’ is a sketch showing the 24.12 acre portion of the City’s 2360 Trim Road property to be sold; Annex “B” is a sketch showing portion of the property to be sold in relation to the City’s total property holdings at 2360 Trim Road and the existing approved and preferred EA alignments for the Blackburn Hamlet Bypass Extension; and Annex “C” is a sketch showing westerly portion of the West Ridge Phase IIIB Subdivision lands to be acquired.

 

DISPOSITION

 

Should Council wish to proceed with a land exchange as set out in this report then the disposition for this land exchange is as follows: 

Corporate Services Department - Real Estate Services Division/ Legal Services Branch to negotiate and finalize the Agreement of Purchase and Sale.

Development Services -           Transportation Planning to complete the Blackburn Hamlet Bypass Extension EA amendment process.


Annex A

 


Annex B

 


Annex C

 



 

LAND EXCHANGE - 1048219 ONTARIO INC.
(REGIONAL GROUP) – WEST RIDGE SUBDIVISION

ÉCHANGE DE TERRAINS - 1048219 ONTARIO INC.
(GROUPE RÉGIONAL) – LOTISSEMENT DE WEST RIDGE

ACS2003-CRS-RPR-0069

 

Moved by Councillor M. Bellemare

 

That the Corporate Services and Economic Development Committee approve the addition of this item for consideration by the committee at today’s meeting, pursuant to section 82(3) of the procedure by-law (being by-law no. 2002-247).

 

CARRIED

 

 

Councillor Stavinga noted the wording of the preamble to the staff recommendation required that the Committee indicate their desire to proceed with the land exchange and in this regard, she moved the following:

 

Moved by Councillor J. Stavinga

 

That the Corporate Services and Economic Development Committee recommend Council:

 

1. Declare the parcel of vacant land, consisting of approximately 9.76 ha (24.12 ac), described as being part of Lot 3, Concession 9, geographic Township of Cumberland, designated as Parts 1 to 4 Plan 5OR-633 and known municipally as 2360 Trim Road, and shown on Annex “A” attached, as surplus to the City's needs;

 

2. Waive City policy pertaining to the internal and external circulation, notice and the marketing of surplus properties and authorize staff to sell the property outlined in Recommendation 1;

 

3. Approve the sale of the land detailed in Recommendation 1 to 1048219 Ontario Inc. (Regional Group), in exchange for a parcel of vacant land consisting of approximately 6.968 ha (17.2 ac), described as being part of Block 112, Registered Plan 4M-1057, geographic Township of Goulbourn, and shown on Annex “C”, all for the nominal sum of $1.00 plus GST, and subject to:

 

a) the completion of legal surveys;

b) any easements that may be required;

c) the execution of an Agreement of Purchase and Sale acceptable to the General Manager, Corporate Services;

d) completion of the Blackburn Hamlet Bypass Extension Environmental Assessment resulting in a modified alignment and;

e) the City not assuming any other costs related to developing the West Ridge Subdivision or complying with agreements associated with this development.

 

CARRIED as amended