1.         FIRE STATION LOCATION – PHASE 2 - EFFICIENCY REPORT

 

EMPLACEMENT DES CASERNES DE POMPIERS – PHASE 2 – RAPPORT SUR L'EFFICIENCE

 

 

 

Committee RecommendationS

 

That Council approve:

 

1.         The operating pressures for the new Barrhaven Fire Station be offset within existing resources as outlined in this report resulting in $1.9M in savings in 2010.

 

2.         The ladder trucks to be implemented at the new Kanata station and Barrhaven Fire Station be deferred until 2011 as outlined in this report resulting in cost deferral of 3.0M in 2010.

 

3.         The Ottawa Fire Services (OFS) pursue investment in technology (traffic pre-emption, AVL, GPS) to ensure that the OFS can meet target response time in Orleans until the new station is constructed in 2015 while enhancing emergency response throughout the City.

 

4.         Direct Real Estate Services staff to research, negotiate and report back to Committee on the purchase of land for the three growth areas approved pursuant to the Fire Station Location Study – Phase 1 report (ACS2008-CPS-OFS-0001). 

 

 

RecommandationS du Comité

 

Que le Conseil approuve:

 

1.         l’atténuation des pressions relatives à la nouvelle caserne de Barrhaven, et ce, à même les ressources existantes, conformément à ce qui est énoncé dans le présent rapport, ce qui entraînera des économies de 1,9 millions de dollars en 2010;

 

2.         le report à 2011 de la mise en service des voitures d’échelles portatives des nouvelles casernes de Kanata et de Barrhaven, conformément à ce qui est énoncé dans le présent rapport, ce qui entraînera des économies de 3,0 millions de dollars en 2010;


 

3.         la poursuite par le Service des incendies d'Ottawa (SIO) de l’investissement dans la  technologie (système de modification du cycle des feux de circulation, localisation automatique des véhicules (LAV), système mondial de localisation (GPS)) afin que les délais de réponse cibles puissent être atteints à Orléans jusqu’à ce que la nouvelle caserne soit construite, soit jusqu’en 2015, et que l’intervention d’urgence soit améliorée dans toute la ville;

 

4.         la consigne aux employés de Services immobiliers de chercher et de négocier des terrains pour les trois secteurs en croissance qui ont été approuvés dans la foulée du rapport Étude sur l’emplacement des casernes de pompiers – phase 1 (ACS2008‑CPS‑OFS‑0001) et de rendre compte au Comité de leurs démarches en vue de l’acquisition de ces terrains.

 

 

 

Documentation

 

1.   Deputy City Manager's report, City Operations, dated 30 October 2008
(ACS2008-COS-OFS-0002).

 

2.   Extract of Draft Minutes, 6 November 2008.


Report to/Rapport au:

 

Community and Protective Services Committee

Comité des services communautaires et de protection

 

and Council/et au Conseil

 

30 October 2008 / le 30 octobre 2008

 

Submitted by/Soumis par:

Steve Kanellakos, Deputy City Manager/Directeur municipal adjoint,

City Operations / Opérations municipales

 

Contact Person/Personne ressource : Rick Larabie, Chief

Ottawa Fire Services/Service des incendies d' Ottawa

(613) 580-2424 x 29411, Rick.Larabie@ottawa.ca

 

City-wide/ À l’échelle de la ville

Ref N°: ACS2008-COS-OFS-0002

 

 

SUBJECT:

Fire station location – Phase 2 - efficiency report

 

 

OBJET :

emplacement des casernes de pompiers – phase 2 – RAPPORT SUR L'efficiencE

 

 

REPORT RECOMMENDATIONS

 

That the Community and Protective Services Committee recommend that Council approve that:

 

1.         The operating pressures for the new Barrhaven Fire Station be offset within existing resources as outlined in this report resulting in $1.9M in savings in 2010. 

 

2.         The ladder trucks to be implemented at the new Kanata station and Barrhaven Fire Station be deferred until 2011 as outlined in this report resulting in cost deferral of 3.0M in 2010.

 

3.         The Ottawa Fire Services (OFS) pursue investment in technology (traffic pre-emption, AVL, GPS) to ensure that the OFS can meet target response time in Orleans until the new station is constructed in 2015 while enhancing emergency response throughout the City.

 

4.         Direct Real Estate Services staff to research, negotiate and report back to Committee on the purchase of land for the three growth areas approved pursuant to the Fire Station Location Study – Phase 1 report (ACS2008-CPS-OFS-0001). 

 

 

RECOMMANDATIONS DU RAPPORT

 

Que le Comité des services communautaires et de protection recommande au Conseil municipal d’approuver :

 

1.         l’atténuation des pressions relatives à la nouvelle caserne de Barrhaven, et ce, à même les ressources existantes, conformément à ce qui est énoncé dans le présent rapport, ce qui entraînera des économies de 1,9 millions de dollars en 2010;

 

2.         le report à 2011 de la mise en service des voitures d’échelles portatives des nouvelles casernes de Kanata et de Barrhaven, conformément à ce qui est énoncé dans le présent rapport, ce qui entraînera des économies de 3,0 millions de dollars en 2010;

 

3.         la poursuite par le Service des incendies d'Ottawa (SIO) de l’investissement dans la  technologie (système de modification du cycle des feux de circulation, localisation automatique des véhicules (LAV), système mondial de localisation (GPS)) afin que les délais de réponse cibles puissent être atteints à Orléans jusqu’à ce que la nouvelle caserne soit construite, soit jusqu’en 2015, et que l’intervention d’urgence soit améliorée dans toute la ville;

 

4.         la consigne aux employés de Services immobiliers de chercher et de négocier des terrains pour les trois secteurs en croissance qui ont été approuvés dans la foulée du rapport Étude sur l’emplacement des casernes de pompiers – phase 1 (ACS2008‑CPS‑OFS‑0001) et de rendre compte au Comité de leurs démarches en vue de l’acquisition de ces terrains.

 

 

EXECUTIVE SUMMARY

 

As part of the 2008 budget process, City staff were directed to find productivity savings to achieve total savings of $100M over 3 years with the Ottawa Fire Services tasked to find $3.15M of the $100M. 

 

In November of 2008, a memo was sent to Members of Council advising that a Fire Station Location Study was being undertaken that opportunities for efficiencies would be identified in the context of the Fire Station Location review. 

 

At its meeting of October 22, 2008, Council approved the Fire Station Location – Phase 1 report, which outlined a methodology to assist with planning the location and resourcing of fire stations in the future.  Through that report, three growth areas, Kanata, Barrhaven and Orleans, were identified which would form the next priority areas for the Ottawa Fire Services requiring additional resources.


 

Ottawa Fire Services had originally identified capital funding in 2010 to begin building a Barrhaven station with anticipated operating funds required in time for an opening in 2012.  Given the results of the Phase 1 Fire Station Location Study, this time frame has been moved up to build the station in 2009 with an anticipated opening in 2010.  The Ottawa Fire Services proposes to offset the operating pressures by staffing the station primarily within existing resources from the current Barrhaven station resulting in a cost avoidance to the City of approximately $ 1.9M. 

 

Ottawa Fire Services has also identified the need to begin building a station in Kanata in 2009 with an anticipated opening date in 2010. Ottawa Fire Services proposes delaying the implementation of ladder trucks at the new Kanata station and Barrhaven Fire Station until 2011 for a cost deferral of $ 3.0M. 

 

The final growth area identified by the Fire Station Location Study is the area of Orleans bordered by Innis Road, Trim Road, Navan Road and Renaud Road with a new station proposed to open in 2015.

 

With respect to all identified growth areas, as well as all existing response areas throughout the City, the Ottawa Fire Services is investigating the benefits of implementing technologies such as traffic pre-emption, in-vehicle mapping, GPS/AVL, and out-of-station vehicle dispatching – to mitigate against future growth and to improve response times throughout the City. 

 

Details of the Ottawa Fire Services efficiency strategies are provided in the attached report.

 

RÉSUMÉ

 

Dans le cadre du processus budgétaire de 2008, le personnel municipal a été chargé de trouver des moyens de réaliser des gains d’efficience en améliorant la productivité pour économiser 100 millions de dollars en trois ans; la part d’économies assignée au Service des incendies d'Ottawa s’élève à 3,15 millions de dollars.

 

En novembre 2008, une note de service a été envoyée aux membres du Conseil pour les aviser qu’une étude sur l’emplacement des casernes était entreprise et que des moyens de réaliser des économies seraient cernés dans le cadre de cet exercice.

 

À sa réunion du 22 octobre 2008, le Conseil municipal a approuvé le rapport intitulé Étude sur l’emplacement des casernes de pompiers – phase 1, dans lequel était présentée une méthodologie visant à faciliter le choix de l’emplacement des casernes de pompiers dans l’avenir et l’attribution de ressources à celles‑ci. Ce rapport cernait trois secteurs en croissance nécessitant des ressources supplémentaires Kanata, Barrhaven et Orléans , auxquels le Service des incendies d’Ottawa accorderait désormais la priorité.


 

Au départ, le Service des incendies d’Ottawa comptait sur les crédits d’immobilisation qu’il recevrait en 2010 pour construire une caserne à Barrhaven; il aurait obtenu les fonds de fonctionnement nécessaires à temps pour l’inauguration, prévue pour l’année 2012. Compte tenu des résultats de la phase 1 de l’étude sur l’emplacement des casernes, le SIO a modifié cet échéancier : la construction du bâtiment se fera en 2009 et son inauguration devrait avoir lieu en 2010. Le Service des incendies d’Ottawa se propose d’atténuer les pressions liées au fonctionnement de la caserne en dotant tout d’abord celle‑ci à même les effectifs existants de la caserne actuelle de Barrhaven, ce qui permettra à la Ville d’économiser environ 1,9 million de dollars.

 

Le Service des incendies d’Ottawa a aussi reconnu la nécessité de commencer à construire en 2009 une caserne à Kanata, dont l’inauguration aurait lieu en 2010. Il propose de reporter la mise en service des voitures d’échelles portatives des nouvelles casernes de Kanata et de Barrhaven et en 2011, ce qui entraînera un report de coûts de 3.0 millions de dollars.

 

Le dernier noyau de croissance cerné par l’étude sur l’emplacement des casernes de pompiers est le secteur d’Orléans bordé par les chemins Innes, Trim, Navan et Renaud, où une caserne devrait être inaugurée en 2015.

 

Le Service des incendies d’Ottawa tient compte de tous les secteurs de croissance cernés ainsi que des zones d'intervention indiquées aux quatre coins de la ville pour étudier les avantages de la mise en œuvre de technologies comme un système de modification du cycle des feux de circulation, la cartographie à bord du véhicule, les systèmes GPS ou LAV et la répartition des véhicules hors caserne pour pallier la croissance future et accélérer le temps de réponse dans toute la ville.

 

Le compte rendu ci-joint fournit des détails sur les stratégies d’efficience adoptées par le Service des incendies d’Ottawa.

 

BACKGROUND

 

At its meeting of October 22, 2008, Council approved report ACS2008-CPS-OFS-0001, which outlined a methodology for identifying both growth areas and associated fire risk throughout the City of Ottawa for the purposes of planning for the location and resourcing of fire stations in the future.  Through that report, Ottawa Fire Services in conjunction with staff from the Ontario Fire Marshal’s (OFM) office, identified three growth areas in the city; namely Kanata, Barrhaven and Orleans, which would form the next priority areas for the Ottawa Fire Services requiring additional resources.

 

Efficiencies to date

 

Overall staffing levels for Ottawa Fire Service suppression has remained virtually unchanged since 1992 while the population of Ottawa has increased from approximately 720,000 to 890,000 - an increase of 24%. 


 

In 2001, when additional resources were required to address deficiencies in Kanata, resources were reassigned from other areas of the City.  Similarly, in 2002 existing resources were reallocated to meet additional requirements at the Charlemagne fire station in Orleans.  In 2005, Ottawa Fire Services managed to reallocate existing resources to staff a brand new station in Riverside South.  Finally in 2006, Fire Services reallocated more existing resources to staff a second vehicle in Riverside South to meet demands. These efficiency practices have saved the city approximately $9M since amalgamation as the Ottawa Fire Services has absorbed growth pressures within existing resources while providing effective service to the Ottawa community.

 

As part of the 2008 budget process, City staff were directed to find productivity savings to achieve total savings of $100M over 3 years.  Ottawa Fire Services was tasked with finding $3.15M of the $100M.  Given the growth pressures that exist for the Ottawa Fire Services as identified in the first Station Location Study report presented to Council, the OFS has been tasked to offset those growth costs using existing resources to realize its productivity savings.  Given the number of resources that have already been rationalized and realigned since amalgamation, it will be difficult for Fire Services to continue to reallocate resources in a static environment much less in a growing City.  However, Ottawa Fire Services has managed to identify some “cost avoidance” savings that can contribute to its productivity target while managing to meet the demands in the identified growth areas.  

 

DISCUSSION

 

Growth Areas

 

Ottawa West (Kanata)

 

As identified in the first station location report, Ottawa West, particularly the areas bordered by March Road, Eagleson Road, Huntmar Road and Huntley Road has seen significant growth since 2006 and will continue to see significant growth over then next 2 years.  In fact, the growth is projected to be approximately 27,000 residents between 2006 and 2011 – a significant proportion of which has already occurred.  Ottawa Fire Services currently faces challenges meeting the need in the growth area with initial response times reaching between 8 minutes and 4 seconds and 9 minutes and 9 seconds at the 90th percentile depending on the location of the fire.  This exceeds the 7 minute initial response time target for suburban areas highlighted in the first station location report and illustrates the immediate need for resources.  In the Long Range Financial Plan (LRFP) Ottawa Fire Services has identified the need to begin building a station in Kanata in 2009 with an anticipated open date in 2010.  A pumper truck and a ladder truck are planned for this new station requiring a total of 7 firefighters per shift – 4 on the pumper truck and 3 on the ladder truck per the collective agreement. Based on existing resources at neighbouring stations and the financial pressures facing the city, Ottawa Fire Services proposes delaying the implementation of the ladder truck until 2011 for a cost deferral of $ 1.5M. 


Ladder truck capability currently exists at the Teron Road station, which is centrally located in Kanata and able to respond to the growth area in the interim.  In addition, that area of Kanata will receive ladder capability from the neighbouring Stittsville Fire station. With this capacity in existence, the real pressure facing Ottawa Fire Services in Kanata is in delivering the initial response in the time standard of 7 minutes as approved by Council at its meeting of October 22, 2008.  A new station with one pumper truck will address this need allowing the Fire Services to delay the implementation of ladder capability for a minimum of at least one year yielding the savings noted. 

 

Ottawa South Fire Station (Barrhaven)

 
A second growth area identified through the station location study was an area of Barrhaven bordered by Strandherd Road, Bowseville Road, Highway 416 and Barnsdale Road.  This area has also seen significant growth recently and is projected to continue growing with an estimated growth of upwards of 21,000 residents by 2011.  As is the case in Kanata, Ottawa Fire Services struggles to meet its initial response time target with response times reaching 8 minutes and 45 seconds at the 90th percentile.  While Ottawa Fire Services has up-staffed the current station in Barrhaven within existing resources to ensure that they can meet their 10 in 10 (10 firefighter’s in 10 minutes) response guideline, it is clear that a new station is required without delay in the area of Greenbank and Cambrian Road to ensure the initial response time target in the growth area can be met.  Ottawa Fire Services had originally identified capital funding in 2010 to begin building a station with anticipated operating funds required in time for an opening in 2012.  Given the results of the Phase 1 Fire Station Location Study, this time frame has been moved up to build the station in 2009 with an anticipated opening in 2010.  The Ottawa Fire Services proposes to offset the operating pressures by staffing the station primarily within existing resources from the current Barrhaven station (which was up-staffed to ensure a 10 firefighter in 10 minute response).  This will result in a cost avoidance to the City of approximately $ 1.9M.  The Barrhaven station will also be able to delay the implementation of a ladder truck until 2011 for a cost deferral of $ 1.5M due to the close proximity of the ladder truck in the existing Barrhaven Station. 

 

Ottawa East Fire Station (Orleans)

 

The final growth area identified by the Fire Station Location Study was the area of Orleans that is bordered by Innis Road, Trim Road, Navan Road and Renaud Road.  While the growth in this area is approximately half of that expected in the other two areas identified, the growth will begin to present significant challenges to the Ottawa Fire Services soon given that the Ottawa Fire Services is presently struggling to meet its initial response time targets with an initial response of 7 minutes and 7 seconds at the 90th percentile in this area.  Ottawa Fire Services has identified the need for a new station in this area to open in 2015.  In the interim, Ottawa Fire Services is looking at technology as a potential solution to address response time targets until a station is built.


 

Technology

 

While development is in the early stages, Ottawa Fire Services has hired a consultant to complete a comprehensive technology strategy that will investigate the benefits of implementing technologies such as traffic pre-emption, in-vehicle mapping, GPS/AVL, and out-of-station vehicle dispatching and its corresponding impact on service delivery.  Preliminary research, of other municipalities in Canada, indicates that these technologies can improve response times by as much as 60 seconds on a 6 minute response time.

 

Although these savings would not be sufficient to defer the construction of new stations in Barrhaven, Kanata or Orleans, they would be sufficient to ensure that the Orleans station meets its first vehicle response standard of 7 minutes in anticipation of the new station being built 2015 while improving response times, and resulting in improved safety for firefighters and the community they serve, as outlined in the following sections.

 

Traffic Pre-emption

 

Traffic pre-emption uses GPS technology and wireless connectivity to send data from responding fire apparatus to the City of Ottawa’s traffic signal control system.  The traffic control system then determines the direction and speed of the responding apparatus and controls the traffic system to provide the best possible traffic flow for the response.  This technology will turn the lights red in all directions to allow fire vehicles to manoeuvre through the intersections without having to stop.  Again, a preliminary benchmark exercise indicates that the implementation of this technology could reduce response times by up to 5%.  Not only would response times improve, but also this technology will assist in reducing accidents involving fire vehicles thus improving safety for firefighters as well as the population at large.  A pilot project using this technology is planned for 2009 in the three identified growth areas in an effort to improve service pending new fire stations.

 

In-Vehicle Mapping

 

In-vehicle mapping is “enroute direction assistance” that makes use of the Global Positioning System (GPS) to determine where a vehicle is with respect to where it needs to go using the Geographic Information System (GIS).  This would be a great advantage to the fire responders as they would have the most accurate and accessible routing information for an incident thus facilitating the best route and as a result the best time for response and improve service. 

 

GPS/AVL (Automated Vehicle Location) and out of vehicle Dispatching

 

GPS/AVL technology allows Fire’s CAD (Computer Aided Dispatch) system to track a vehicle’s location at all times.  As a result, Ottawa Fire Services could move to a best vehicle response versus a best station response.  Often vehicles are out of the station enroute for maintenance or on the way back from a call and could be in close proximity to an incident.  Currently, dispatchers cannot send that vehicle, as they are not aware of its location. 

With this new technology they could send that vehicle to the call, which would significantly improve service and reduce response times to those calls. 

 

While Fire Services is still completing the financial implications and the potential return on investment of such technologies, it is anticipated that the implementation of some or all of these technologies can improve service in existing areas while potentially delaying the need for additional resources in future growth areas.

 

Direction to Real Estate to Research, Secure and Purchase Land

 

Real Estate to research, secure and report back to Committee on the purchase of land with respect to the three growth areas (Barrhaven, Kanata and Orleans) approved pursuant to the Fire Station Location Study – Phase 1 report approved by Council at its meeting of October 22, 2008.

 
CONCLUSION

 

Ottawa Fire Services has done its best to be efficient since amalgamation.  To date, the service has managed to address pressures using existing resources despite a growing city.  Through a comprehensive Station Location Study, Ottawa Fire Services has identified growth areas requiring additional resources immediately as well as in the near future.  Again, Ottawa Fire Services is proposing a solution to avoid some of the costs associated with growth by utilizing existing staff in Barrhaven to off set an operating pressure associate with a new station.  Likewise, Fire services propose the delay of implementing a ladder truck in the new Barrhaven and new Kanata stations allowing the associated staff to be deferred for one year.  Implementation of a traffic pre-emption pilot project is planned for 2009 and is anticipated to improve response times in Orleans so that it can continue to meet response times in anticipation of the new station to be built in 2015.

 

Additional technologies are being investigated for implementation which will improve service and could contribute to further efficiencies by improving response times by as much as 10%.

 

While Fire Services has managed to provide effective and efficient fire response since amalgamation through the realignment of existing resources, it has become clear that there are no additional opportunities to reallocate existing resources to address growth and avoid costs beyond the strategies that have been identified in this report.  While there may be some efficiencies to be realized out of technology, future growth will require additional resources.  

 

CONSULTATION

 

There was no public consultation associated with the development of this efficiency report.


 

FINANCIAL IMPLICATIONS

 

The 2009 Draft Capital Budget includes the associated expenditure increases identified by this report for the Ottawa South and Ottawa West fire stations.  The forecasted year 2010 included in the Draft 2009 Operating Budget reflects the additional 20 FTEs and the related vehicles (pumper) and equipment for the Ottawa South fire station, as well as the additional 20 FTEs and related vehicle (pumper) and equipment for the Ottawa West Fire Station. 

 

The forecasted year 2011 included in the Draft 2009 Operating Budget reflects the additional 15 FTEs and the related vehicle (aerial) and equipment for the Ottawa South fire station and the additional 15 FTEs and the related vehicle (aerial) and equipment for the Ottawa West fire station.

 

DISPOSITION

 

The Ottawa Fire Services will action any direction received as part of consideration of this report.


FIRE STATION LOCATION – PHASE 2 - EFFICIENCY REPORT

EMPLACEMENT DES CASERNES DE POMPIERS – PHASE 2 – RAPPORT SUR L'EFFICIENCETRANSLATION

ACS2008-COS-OFS-0002                         CITY WIDE / À L'ÉCHELLE DE LA VILLE

 

Chief Larabie thanked staff for all their hard work in the preparation of this report and was joined at the delegations table by Deputy Chief, Bruce Montone, Education and Prevention Services Division, Captain John Burke, Education and Prevention Services Division and Chief Rural Sector, Gerry Pingitore.  They provided a summary of the presentation about to be given and stated that on October 22, 2008, City Council approved Phase 1 of the study.  He said three growth areas were identified, those being Kanata, Barrhaven and Orleans.  He stated that staffing levels since 1992 has been virtually unchanged yet the City has grown approximately 24%.  Other efficiencies have attained since amalgamation.  He and Deputy Chief Montone gave a PowerPoint presentation and a copy is held on file with the City Clerk.

 

Chair Deans stated the Committee had directed Fire Services to come back with a report on residential sprinkler systems in new housing starts and asked when the Committee might expect to get this report and would this system have an on response times if it were approved by Council.

 

Deputy Chief Montone responded by saying the report is scheduled to be brought back to the Committee during the first quarter of 2009. In terms of the impact, this would depend on the way Council was to go but it would have zero impact on response times but would provide an opportunity to review the service standards and a possibility of cost deferral.

 

Councillor Feltmate thanked staff for the report.  Her question dealt with the new station for the Stittsville area since it has become quite urbanized and what tax rate would these residents have since some of the services are still on volunteer fire services and the rate is different.  How would it be implemented?

 

Chief Larabie sited the example of former Cumberland when the boundaries were redrawn there for response and deployment, and how the career part of the service was used for a larger area and the new redrawn area was provided to the taxation department and they determined which areas received a new rate

 

Councillor Feltmate wanted to know the procedure for notifying the residents of the new coverage area near Stittsville so that they can realize that their tax rate would be changing.

 

She wants to ensure that those residents are paying the fair rate and not being subsidized by urban residents and still paying rural rates.

 

Chief Larabie is unsure of the mechanism used but will check with the taxation department.

 

Councillor Feltmate feels that this is a critical question and needs to be resolved.

 

Chair Deans followed up further on the question of who resolves this issue.

 

Mr. Steve Kanellakos, Deputy City Manager, City Operations stated that the last time it was the Fire Service working with Mr. Hughes in Revenue to determine the area right down to the street and then there was a tax rate adjustment based on what side of the street the residence was located.  Therefore in this instance, before the deployment model is implemented, discussions will take place with Mr. Hughes regarding new rates.

 

Councillor Feltmate does not want to see a situation where the information is provided at the last minute to residents and this creates a problem with regards to their taxation level.  She believes that Councillors need to be aware of the communications strategy and what kind of dollars this will mean to the residents before voted on at Council. The new area gets a new station, which must be paid for, as well as a different level of service.

 

Chief Larabie believes that the cost difference for the residents in the new deployment area would be an increase of about $100.

 

Councillor Qadri wanted further clarification on Station 81 and the services it would provide especially for back up to Station 41.

 

Chief Larabie stated that the Councillor’s assumptions were correct that the surrounding stations provide backup service for the primary response station. 

 

Councillor Qadri asked if Station 41 was a composite station made up of volunteer and career fire fighters.

 

Chief Larabie stated that yes it was a composite station and the tax rate is based on the urban tax rate. 

 

In response to Councillor Qadri’s question on new Station 110 and the area it would serve, Chief Larabie responded by stating that it would service the growth area but also service some of the existing areas as well and the rate would be based on the urban tax rate.

 

That the Community and Protective Services Committee recommend that Council approve that:

 

1.         The operating pressures for the new Barrhaven Fire Station be offset within existing resources as outlined in this report resulting in $1.9M in savings in 2010.

 

2.         The ladder trucks to be implemented at the new Kanata station and Barrhaven Fire Station be deferred until 2011 as outlined in this report resulting in cost deferral of 3.0M in 2010.

 

3.         The Ottawa Fire Services (OFS) pursue investment in technology (traffic pre-emption, AVL, GPS) to ensure that the OFS can meet target response time in Orleans until the new station is constructed in 2015 while enhancing emergency response throughout the City.

 

4.         Direct Real Estate Services staff to research, negotiate and report back to Committee on the purchase of land for the three growth areas approved pursuant to the Fire Station Location Study – Phase 1 report (ACS2008-CPS-OFS-0001).

 

                                                                                                            CARRIED