3.             Ottawa Road 174 - In-Service Road Safety Review

 

Route 174 - Examens De La Sécurité Des Routes En Service

 

 

 

Committee Recommendations As Amended

 

That Council approve:

 

1.         That staff implement all short-term strategies identified in the report along the two-lane arterial road segment of Ottawa Road 174 east of Trim Road and that this work be completed within current budgeted programs.

 

2.         That staff undertakes a preliminary design of geometric improvements at the intersection of Ottawa Road 174 and Quigley Hill Road and that funds for the construction of these geometric improvements be requested in future capital budgets.

 

3.         That Infrastructure Services staff be directed to design and construct the extension of the transition zone from the freeway section to the two-lane rural arterial road segment including the installation of street lighting, as shown in Document 4 and to increase the base budget of the Trim Road Widening (Ottawa Road 174 to Frank Kenny) project from $ 29.3 million to $ 35 million to fund in the 2011 capital budget.

 

4.         That funding required to implement all medium-term strategies identified in the report be included for consideration in future capital budgets, and

 

5.         That the City request funds from the province and the federal government to implement the road safety strategies included in the report.

 

6.         That the City once again request the Government of Ontario to conduct an Environmental Assessment on widening the road.

 

 

Recommandations modifiées du comité

 

Que le Conseil approuve ce qui suit :

 

1.         Que le personnel mette en œuvre toutes les stratégies à court terme désignées dans le rapport et s’appliquant au tronçon d’artère à deux voies de la route 174 à l’est du chemin Trim, et qu’elles soient mises en œuvre dans le cadre des programmes budgétisés actuels.

 

2.         Que le personnel entreprenne la conception préliminaire des améliorations géométriques à l’angle de la route 174 et du chemin Quigley Hill, et que les fonds nécessaires à ces travaux d’amélioration géométrique soient requis sous la forme dans les prochains budgets d’investissement.

 

3.         Que le personnel des Services d’infrastructure soit chargé de concevoir et de réaliser le prolongement de la zone de transition entre le tronçon d’autoroute et celui d’artère rurale à deux voies, y compris l’installation de lampadaires, tel qu’illustré dans le Document 4, et que la demande d’accroissement du budget de base du projet d’élargissement du chemin Trim (de la route 174 à Frank Kenny), de 29,3 millions de dollars à 35 millions de dollars, soit faite dans le cadre du budget d’investissement de 2011.

 

4.         Que le financement nécessaire à la mise en œuvre de toutes les stratégies à moyen terme désignées dans le rapport soit pris en compte dans les prochains budgets d’investissement.

 

5.         Que la Ville demande aux gouvernements provincial et fédéral les fonds nécessaires à la mise en œuvre des stratégies de sécurité routière décrites dans le rapport.

 

6.         Que la Ville redemande au gouvernement de l’Ontario de mener une évaluation environnementale concernant l’élargissement du chemin.

 

Documentation

 

1.         Deputy City Manager’s report, City Operations, dated 29 October 2009 (ACS2009-COS-PWS-0024).

 

2.         Extract of Draft Minute, 2 December 2009

 


Report to/Rapport au:

 

Transportation Committee

Comité des transports

 

and Council/et Conseil

 

29 October 2009 / 29 octobre 2009

 

Submitted by/Soumis par:

Steve Kanellakos, Deputy City Manager/Directeur municipal adjoint

City Operations/Opérations municipales

 

Contact Person/Personne ressource:

 John Manconi, General Manager/directeur général, Public Works/TravauxPublics

613-580-2424, extension 21110, John.Manconi@ottawa.ca

 

Ward/Quartier: Orléans (1) and Cumberland (19)

                Ref N°: ACS2009-COS-PWS-0024

 

 

SUBJECT:

OTTAWA ROAD 174 - In-Service Road Safety Review

 

OBJET:

ROUTE 174 - Examens de la sécurité des Routes en Service

 

REPORT RECOMMENDATIONS

 

That Transportation Committee recommend that Council approve:

 

1.                  That staff implement all short-term strategies identified in the report along the two-lane arterial road segment of Ottawa Road 174 east of Trim Road and that this work be completed within current budgeted programs.

 

2.                  That staff undertakes a preliminary design of geometric improvements at the intersection of Ottawa Road 174 and Quigley Hill Road and that funds for the construction of these geometric improvements be requested in future capital budgets.

 

3.                  That Infrastructure Services staff be directed to design and construct the extension of the transition zone from the freeway section to the two-lane rural arterial road segment including the installation of street lighting, as shown in Document 4 and to increase the base budget of the Trim Road Widening (Ottawa Road 174 to Frank Kenny) project from $ 29.3 million to $ 35 million to fund in the 2011 capital budget.

 

4.                  That funding required to implement all medium-term strategies identified in the report be included for consideration in future capital budgets, and

 

5.                  That the City request funds from the province and the federal government to implement the road safety strategies included in the report.

 

RECOMMANDATIONS DU RAPPORT

 

Que le Comité des transports recommande au Conseil d’approuver ce qui suit :

 

1.                  Que le personnel mette en œuvre toutes les stratégies à court terme désignées dans le rapport et s’appliquant au tronçon d’artère à deux voies de la route 174 à l’est du chemin Trim, et qu’elles soient mises en œuvre dans le cadre des programmes budgétisés actuels.

 

2.                  Que le personnel entreprenne la conception préliminaire des améliorations géométriques à l’angle de la route 174 et du chemin Quigley Hill, et que les fonds nécessaires à ces travaux d’amélioration géométrique soient requis sous la forme dans les prochains budgets d’investissement.

 

3.                  Que le personnel des Services d’infrastructure soit chargé de concevoir et de réaliser le prolongement de la zone de transition entre le tronçon d’autoroute et celui d’artère rurale à deux voies, y compris l’installation de lampadaires, tel qu’illustré dans le Document 4, et que la demande d’accroissement du budget de base du projet d’élargissement du chemin Trim (de la route 174 à Frank Kenny), de 29,3 millions de dollars à 35 millions de dollars, soit faite dans le cadre du budget d’investissement de 2011.

 

4.                  Que le financement nécessaire à la mise en œuvre de toutes les stratégies à moyen terme désignées dans le rapport soit pris en compte dans les prochains budgets d’investissement.

 

5.                  Que la Ville demande aux gouvernements provincial et fédéral les fonds nécessaires à la mise en œuvre des stratégies de sécurité routière décrites dans le rapport.

 

 

EXECUTIVE SUMMARY

 

In 1997, Ottawa Road 174 (OR 174), formerly provincial Highway 17, became the responsibility of the City of Ottawa (formally RMOC).  The OR 174 In-Service Road Safety Review (ISRSR) study area comprises the two-lane rural arterial road section of OR 174 from Trim Road intersection up to the City limits east of the Canaan Road intersection, as shown in Document 1.

 

The objective of the OR 174 safety study was to analyze the existing road safety performance of this 12.7 kilometre section, and identify a set of cost-effective strategies that would improve both the road safety and operational performance of this roadway segment.

 

The study followed the principles and tasks outlined in "The Canadian Guide to In-Service Road Safety Reviews" (2004 Edition) produced by the Transportation Association of Canada (TAC). This engineering study is an independent and formal process conducted by a team of road safety experts who, based upon experience and expertise, can provide opinions on road safety matters from the perspective of the road users and identify cost-effective road safety recommendations that would improve the traffic safety conditions of a roadway facility.

 

A total of 270 collisions reported between January 1, 2003 and December 31st, 2007 were reviewed at intersections and road segments in between intersections (mainline segments), as shown in Document 2.  Over the study period, 5 fatal collisions occurred on the corridor, collisions resulting in injuries (52) represented 19% of all collisions and 80% (213) of all collisions resulted in Property Damage Only (PDO).  The total societal economic impact due to collisions was estimated close to $84.4 million in 2008 figures. A total of 1,294 offence notices were issued during the five-year period (2003-2007).  Significant Highway Traffic Act (HTA) offences included speeding (475), careless driving (51), and following too close (34).

 

Staff reviewed the study findings to prepare a road safety implementation plan, which is expected to be cost effective in reducing the risk of collisions resulting in injury and/or fatal collisions along the corridor.

 

The plan presents both the short-term and medium-term strategies.  Strategies are also broken into groups that address corridor-wide concerns and localized concerns impacting the vicinity of the Cameron Street intersection, as well as the intersection with Trim Road.

 

The short-term strategies include:  upgrade signs and pavement markings, improve roadway surface along the corridor, install centreline rumble strips, develop a roadside design study, conduct a speed zone review, upgrade traffic operations and roadway geometry, and provide illumination at unsignalized and signalized intersections within the corridor, continue education and enforcement campaigns, and continue to monitor the collisions along the corridor.

 

The medium-term strategies include: improve the roadside environment, upgrade traffic operations and roadway geometry at unsignalized intersections, develop and implement an access management strategy and improve roadway surface along the corridor.

 

The implementation of the short-term strategies already started this past summer with the installation of the traffic control signal at Canaan and OR 174 and the microsurfacing of the easterly portion of OR 174.  It is expected that all short-term strategies, except for the work near the Trim Road intersection (to be coordinated with Trim Road Widening project), will be implemented by 2011.  The medium-term strategies would require a further engineering study before deciding the implementation period and they would likely require a staged implementation due to funding pressures.

 

RÉSUMÉ

 

En 1997, la route 174, anciennement l’autoroute provinciale 17, tombait sous la responsabilité de la Ville d’Ottawa (anciennement la MROC).  Le secteur d’étude de l’Examen de sécurité visant la route 174 comprend le tronçon d’artère rurale à deux voies de la route 174 situé entre le chemin Trim et les limites de la Ville à l’est du chemin Canaan, tel qu’illustré dans le Document 1.

 

L’examen de sécurité visant la route 174 avait pour objet d’analyser le rendement en matière de sécurité routière sur ce tronçon de 12,7 kilomètres, et de désigner une série de stratégies rentables susceptibles d’améliorer la sécurité routière et le rendement opérationnel de ce tronçon.

 

L’examen a été mené conformément aux principes et à la mission énoncés dans le Guide canadien des examens de la sécurité des routes en service (édition de 2004), publié par l’Association des transports du Canada (ATC).  Cette étude technique a été réalisée de manière indépendante et officielle par une équipe d’experts en sécurité routière qui, grâce à son expérience et à son expertise, peut donner son opinion sur des questions de sécurité routière du point de vue de l’usager de la route, et faire des recommandations rentables de sécurité routière susceptibles d’améliorer les conditions de sécurité sur une route en particulier.

 

Au total, 270 collisions signalées entre le 1er janvier 2003 et le 31 décembre 2007 ont été examinées à des intersections et sur des tronçons situés entre des intersections (tronçons principaux), tel qu’illustré dans le Document 2.  Au cours de la période d’examen, 5 accidents mortels se sont produits dans ce couloir; les collisions avec blessés (52) ont représenté 19 pour cent de toutes les collisions et 80 pour cent (213) des collisions n’ont entraîné que des dommages matériels.  L’incidence sociétale et économique globale attribuable aux collisions a été estimée à près de 84,4 millions de dollars en 2008.  Au total, 1 294 contraventions ont été données au cours de la période 2003-2007.  Les excès de vitesse (475), la conduite imprudente (51) et le talonnage (34) figuraient parmi les infractions les plus fréquentes au Code de la route.

 

Le personnel a examiné les conclusions de l’examen afin de préparer un plan de mise en œuvre de sécurité routière, qui devrait s’avérer rentable en réduisant dans ce couloir le risque de collisions mortelles ou avec blessés.

 

Ce plan propose des stratégies à court et à moyen terme.  Les stratégies ont été partagées en groupes portant sur les problèmes de largeur du couloir et les problèmes localisés ayant des répercussions autour de l’intersection de la rue Cameron et celle du chemin Trim.

 

Mentionnons parmi les stratégies à court terme l’amélioration des panneaux indicateurs et des marques sur la chaussée, l’amélioration de la chaussée dans le couloir, l’installation de ralentisseurs sonores sur la ligne médiane, l’élaboration d’une étude de conception des accotements, l’examen d’une zone de limitation de vitesse, l’amélioration de la circulation et de la géométrie de la chaussée, l’installation de lampadaires aux carrefours équipés ou non de feux de circulation du couloir, la poursuite des campagnes de sensibilisation et d’application des règlements, et la poursuite de la surveillance des collisions dans le couloir.

 

Les stratégies à moyen terme comprennent l’amélioration des accotements, l’amélioration de la circulation et de la géométrie de la chaussée aux carrefours sans feux de circulation, l’élaboration et la mise en œuvre d’une stratégie de gestion des accès, et l’amélioration de la surface de la chaussée dans le couloir.

 

La mise en œuvre des stratégies à court terme a déjà été lancée avec l’installation du feu de circulation à l’angle de Canaan et de la route 174, et le microsurfaçage du tronçon est de la route 174, effectués l’été dernier.  Toutes les stratégies à court terme, sauf les travaux à proximité de l’intersection du chemin Trim (qui doivent être coordonnés avec le projet d’élargissement du chemin Trim) devraient être mises en œuvre d’ici à 2011.  Les stratégies à moyen terme doivent faire l’objet d’une autre étude technique avant que ne soit décidée la période de mise en œuvre.  Ces stratégies devraient en outre faire l’objet d’une mise en œuvre par étapes en raison des contraintes de financement.

 

BACKGROUND

 

In 1997, Ottawa Road 174 (OR 174), formerly provincial Highway 17, became the responsibility of the RMOC and now the City of Ottawa.  The study area comprises the two-lane rural arterial road section of OR 174 from Trim Road intersection up to the City boundary east of the Canaan Road intersection. The Transportation Master Plan (TMP), adopted by Council in November 2008, included OR 174 east of the Trim Road intersection as an arterial road within the Rural Road Network, as shown in Document 1.

 

The physical characteristics and environment of OR 174 are unique within the City road network. In the past, this roadway was the main connection between Ottawa and Montreal. Since the opening of Highway 417, the road is mainly used by commuters and local residents, with some through traffic coming from the City of Clarence-Rockland and the Masson (Quebec) ferry’s users. Also, it crosses Cumberland Village and the growing suburban areas connected to OR 174.  

 

The objective of this study was to analyze the existing road safety performance of this 12.7 kilometre section, and identify a set of cost-effective strategies that would improve both the road safety and operational performance of this roadway segment.

 

As mentioned above, OR 174 is a legacy facility from the province. As such, the road safety study (ISRSR) was conducted using engineering methodologies applicable to the existing conditions of a two-lane rural highway road cross-section.  The study followed the principles and tasks outlined in "The Canadian Guide to In-service Road Safety Reviews" (2004 Edition) produced by the Transportation Association of Canada (TAC).

 

This engineering study is an independent and formal process conducted by a team of road safety experts who, based upon experience and expertise, provide opinions on road safety matters from the perspective of the road users and identify cost-effective road safety recommendations that would improve the traffic safety conditions of a roadway facility.

 

Following the TAC guidelines, the City retained a consultant to undertake the OR 174 In-Service Road Safety Review (ISRSR).  The study has allowed the City to develop a comprehensive understanding of the safety challenges and opportunities that exist, or are perceived to exist, within the OR 174 two-lane road segment.  The outcome of the field observations and analysis of the data used for the capacity operational and safety review are summarized in the following section.  Also, a road safety implementation plan that would improve the traffic safety performance on the corridor is outlined.

 

 

DISCUSSION

 

The OR 174 two-lane rural highway segment largely operates under congested conditions during the morning and afternoon peak period times on any given weekday.  The traffic record indicates that the Average Daily Volume (AADT) is close to 19,000 vehicles.  In theory, a highway facility such as this segment of OR 174 has a capacity to carry 20,000 vehicles. Within the current geometric configuration, this road has limited capacity to absorb any additional traffic. Furthermore, in recent years the number of collisions reported on this facility has increased.

 

In addition to the entire two-lane corridor of OR 174 between Trim Road and Canaan Road (the City limit), the safety study considered a short distance of the connecting roads to OR 174 within the study area, as shown in Document 1.

 

The study process included data analysis and field observations in order to determine the existing road safety and operational performance of OR 174 two-lane rural highway segment.  A systematic approach “lines of evidence” was followed for both the road safety engineering and the capacity operational analyses.  The “lines of evidence” approach examines a range of factors that may be related to collision overall safety performance.  These are assessed first individually, and then as a whole.

 

Where lines of evidence “overlap” and point to a common conclusion regarding a particular feature or element of the roadway, that conclusion is strengthened by the independence of the indicators and the multiplicity of their occurrence as well as the independence of the individual investigators pursuing the different approaches to the analysis”.

 

This approach included the application of five different examination methods:

 

·         MTO’s “Science of Highway Safety”- Operational Performance Functions (OPF);

·         Collision pattern analysis;

·         Field investigation;

·         Traffic operational review; and,

·         Interactive Highway Safety Design Model (IHSDM).

 

ROAD SAFETY FINDINGS

 

The road safety analysis identified collision patterns, locations, the degree to which existing traffic conditions would impact the risk of collision frequency and the potential for traffic operational improvements.

 

A total of 270 collisions reported between January 1, 2003 and December 31st, 2007 were reviewed at intersections and road segments between intersections (mainline segments), as shown in Document 2.  Over the study period, 5 fatal collisions occurred on the corridor, collisions resulting in injuries (52) represented 19% of all collisions and 80% (213) of all collisions resulted in Property Damage Only (PDO).  Of the 270 collisions, 100 collisions (37%) occurred during periods of reduced lighting.

 

The following information highlights the results of the five-years collision analysis along OR 174 road segments between intersections (mainline segments) and at intersections.

 

Mainline Segments

 

A total of 174 collisions were reported on the mainline segments and the typical patterns are:

 

·         56 Rear-end collisions (32% of total);

·         48 Run-off-road collisions (27% of total);

·         41 Animal related collisions (23% of total).

 

The road safety analysis indicated that the highest collision numbers in the study area occurred in two consecutive road segments:

 

Trim Rd - Quigley Hill Rd (63 collisions)

 

The typical patterns are:

Quigley Hill Rd - Cameron St (31 collisions)

 

The typical patterns are:

·         12 Rear-end collisions (19% of total)

·         20 Run-off-road collisions (32% of total)

·         14 Animal related collisions (22% of total)

·         Of the 63 collisions, 38% occurred during periods of reduced lighting

·         Of the 63 collisions, 2 fatal collisions and12 resulted in injury (19% of total)

·         14 Rear-end collisions (45% of total)

·         7 Run-off-road collisions (23% of total)

·         5 Animal related collisions (16% of total)

·         Of the 31 collisions, 48% occurred between 4:00 pm and 7:00 pm

·         Of the 31 collisions, 1 fatal collision and 7 resulted in injury (23% of total)

 

The collision analysis at intersections indicated the following results:

 

Signalized Intersections

 

A total of 57 collisions occurred at the Trim Road intersection and the typical patterns are:

 

·         33 Rear-end collisions (58%);

·         9 Run-off-road and single vehicle collisions (16%);

·         6 Left turn movement collisions (11%).

 

Property damage only (PDO) collisions are over-represented at this intersection (45 collisions).

Of the 57 collisions, 40% occurred during periods of reduced lighting.

 

A total of 21 collisions was reported at the Cameron Street intersection and the majority (57% of total) were rear-end collisions.  This could be associated to the congested conditions during the peak morning and afternoon time.

 

Unsignalized Intersections

 

A total of 17 collisions were reported at the non-signalized intersections and the typical patterns are:

 

·         8 Rear-end collisions (47%);

·         5 Run-off-road and single vehicle collisions (29%);

·         2 Left turn movements (12%).

 

One fatal collision was reported at Old Montreal Road West (Kinsella Drive). Of the 17 collisions, 24% occurred during periods of reduced lighting.

 

Societal Economic Impact

 

During the study period (2003-2007), the total societal economic impact due to collisions was estimated close to $84.4 million in 2008 figures.  The cost estimation amount was based on the “Willingness-to-Pay” figures provided by the 2007 MTO-Transport Canada document “Analysis and Estimation of the Social Cost of Motor Vehicle Collisions in Ontario –2004” and the 2004 values provided in the document have been inflated with a CPI of 2.4%.

 

Offence Notices

 

In addition to the collision data, the Ottawa Police Service made available a list of all offence notices issued to motorists within the study corridor.  A total of 1,294 offence notices were issued during the five-year period (2003-2007).  Significant Highway Traffic Act (HTA) offences included speeding (475), careless driving (51), and following too close (34).

 

Traffic Engineering Review

 

In summary, the following key factors may have impacted the five-year collision history on OR 174 from Trim Road to the City boundary:

 

Speed: Based on the 85th percentile, operating speeds on this facility range from 95 - 104 km/h on roadway segments posted at 90 km/h to 95 – 99 km/h on roadway segments posted at 80 km/h.

 

Roadside environment: The roadside environment on a roadway and its design has an important role to play in improving road safety.  For instance, roadside fixtures, such as culverts or rock outcroppings, can present a serious safety problem for vehicles if left unprotected.

 

Accesses: Within the study area, the frequency of residential driveways and minor intersection accesses on both sides of OR 174 create a significant impact on the roadway operation.  This does not only result in reduced traffic capacity but also tends to increase vehicle conflicts and delays along the facility.  In particular, these concerns were noted in the vicinity of the Cameron Street intersection.  The existence of substantive speed differentials and the willingness of drivers to accept smaller gaps in the through traffic stream when entering the roadway may have an impact on traffic safety.

 

Illumination: Large sections of the mainline are not illuminated.  This may contribute to increased collisions during reduced light levels with vehicles accessing or egressing driveways and accesses and the increase in animal related collisions.

 

Positive guidance: A number of concerns associated with the condition of the signage on this facility were identified.  For example: the retro-reflective properties for each sign needs to be assessed and non-standard and\or faded signs should be removed or replaced.

 

Passing opportunities: Although there are passing opportunities along OR 174, the consistent long vehicle platoon lengths observed on the road suggest that they are not making a positive impact in the traffic flow during morning and afternoon peak hour periods. 

 

Level of service (LOS): The outcome of the capacity operational analysis suggests that the corridor operates at LOS E – at capacity – in both directions during both morning and afternoon peak periods.  In some cases, the capacity of a roadway can be improved by adding passing lanes.  Typically, the criterion for the need for passing lanes is based on maintaining an acceptable level of traffic operation (LOS C).  Nonetheless, a passing lanes analysis was conducted along OR 174 and the results confirmed that they are not suitable for this roadway within the current geometric configuration and traffic operation conditions.

 

The intersection geometry and operations: There were several concerns regarding the existing intersection geometry and operations.  In particular, Cameron Street intersection capacity analysis indicates that the intersection operates at congested conditions (LOS D).  Also, other intersection geometry issues were identified including the length of transition tapers for left–turn bypass lanes, short and narrow auxiliary lanes, the absence of auxiliary lanes at some intersections and excessive queue lengths during peak hour periods.

 

Trim Road and OR 174 - intersection operations: This intersection consists of an isolated traffic signal located at the end of a higher-speed four-lane divided freeway that transitions to a two-way two-lane rural highway cross section.  The queue of eastbound vehicles turning right at Trim Road extends into the high-speed through lanes of OR 174 during the PM peak hour period.  The risk of high-speed end of queue collisions is of particular concern at this location.  Also, the risk of collisions extends to the transition zone on the eastbound direction, which ends on a sharp curve.

 

Potential Opportunities for Improvement

 

Given the complexity of the corridor, the study included the development of Operational Performance Functions (OPF) using the parameters of the Province of Ontario.  The purpose of the OPF is to evaluate the current safety performance by developing estimates of the “expected” safety performance of typical types of roads and intersections in the Province of Ontario.  The result of this analysis is expressed by using the Potential for Operational Improvement (POI) index.

 

The POI ranking provided the City with guidance on the priority that should be assigned to a location of interest or to address the safety deficiencies on the roadway element.  The ranking of the mainline segments and signalized intersections are shown on Table 1. 

 

 

Table 1: Road Segments and Signalized Intersections POI raking

Locations

 

Rank

Mainline Segments

Length

 

Quigley Hill Rd to Cameron St

(1.4km)

1

McTeer Rd to Canaan Rd

(0.9km)

2

Trim Rd to Quigley Hill Rd

(5.0km)

3

Morin Rd to Old Montreal Rd West (Kinsella Drive)

(0.4km)

4

Old Montreal Rd East to McTeer Rd

(0.2km)

5

Faubert St to East St\Peter Harkness Lane

(0.1km)

6

West St to Faubert St

(0.1km)

7

Cameron St to West St

(0.1km)

8

East Shore Lane to Morin Rd

(0.2km)

9

East St\Peter Harkness Lane to East Shore Lane

(1.2km)

10*

Old Montreal Rd West (Kinsella Drive) to Old Montreal Rd East

(2.0km)

10*

Signalized Intersections

 

 

Trim Road Signalized Intersection

 

1

Cameron Street Signalized Intersection

 

2

* POI indicated equal value

 

 

 

Road Safety Strategies

 

Based on the analysis above, a series of candidate countermeasures were selected on the basis of the likelihood of reducing the frequency of collisions, the severity of collisions, or both.  The evaluation process continued by quantifying the potential road safety and operational benefits associated with each of the selected countermeasures.  Given the diverse nature of these countermeasures, a toolset of safety analysis techniques were applied.   Also, a construction cost estimate for the implementation of each countermeasure was prepared to advance the opportunities to implement them.

 

After this analysis was completed, it was evident that there are opportunities for safety and traffic operational improvements in the OR 174 corridor for the short and mid term periods.  The strategies were analyzed into four distinct categories:

 

·         Corridor-wide strategies: these strategies included countermeasures that are applicable to the corridor level or the great majority of the study area;

·         Unsignalized intersection strategies: these strategies are expected to improve the safety and operation of selected locations along the corridor;

·       Trim Road and OR 174 intersection and transition zone strategies: these strategies are expected to address the traffic operational concerns of the intersection in conjunction with reducing the risk of collision in the transition zone (from the freeway section to the two-lane rural arterial road segment) of OR 174; and,

·      Cameron Street intersection and Cumberland community strategy: these strategies are expected to improve the safety and operation of this road segment.

 

These strategies have been evaluated individually; opportunities for combining the various countermeasures for implementation are recommended.  A benefit/cost ratio (B/C) value was calculated based on the expected safety performance of each strategy (including collision history and expected collision reduction).  For example at the corridor level, installing centerline rumble strips has a B/C of 365, geometric improvements shows a B/C of 18 and a capacity upgrade strategy shows a B/C of 1 or less than 1.  The higher the number, the greater is the potential benefit contrary to a B/C of 1 or less than 1, which is very marginal.

 

For the safety study and the existing condition of the OR 174 corridor, this approach is appropriate in order to assess the potential road safety benefit as a direct result of implementing a specific strategy.  Also, it allows prioritization guidance on candidate safety strategies for implementation based on their safety effectiveness.  The following sections discuss further the proposed road safety strategies and the implementation plan.

 

ROAD SAFETY IMPLEMENTATION PLAN

 

Following the three E’s of road safety, engineering, enforcement and education, staff prepared a road safety implementation plan, which is expected to be cost effective in reducing the risk of collisions resulting in injury and/or fatal collisions.  An innovative safety analysis procedure was applied to prioritize the candidate strategies and those with the highest potential of reducing the risk or severity of collisions were selected for implementation in the short-term period.

 

The plan is summarized in Table 2 and presents both the short-term and medium-term strategies. Also, strategies are broken into groups that address corridor-wide concerns and localized concerns impacting the vicinity of the Cameron Street intersection, as well as the intersection with Trim Road.

 

 

Table 2: Road Safety Implementation Plan

COUNTERMEASURES

IMPLEMEN-TATION YEAR

Est.  Cost

($000)

Funded

Y/N

SHORT -TERM STRATEGIES

 

 

 

Corridor-Wide

 

 

 

Upgrade traffic operations at unsignalized intersection: Installing a new traffic signal at the Canaan Road intersection

Completed - 2009

N/A

N/A

Improve roadway surface – microsurfacing from 300 m east of Cameron Street to the City boundary

Completed - 2009

N/A

N/A

Upgrade signage and pavement markings

2010/2011

100

2010 budget

Install centreline rumble strips

2010

20

Y

Increase the pavement width on horizontal curves west of the intersection with Quigley Hill Road

2010

230

Y

Conduct a roadside safety design study

2010

75

2010 budget

Upgrade the intersection geometry at unsignalized intersection: Conducting a preliminary design to provide left turn lanes at the Quigley Hill Road intersection

2010

30

Y

Provide illumination at unsignalized intersections

2010/2011

125

Y

Conduct a corridor wide speed zone review

2011

Internal

Y

Continue education and enforcement campaigns

Annual

Internal

Y

Continue to monitor the collision frequency on the study corridor

Annual

Internal

Y

Cameron Street Intersection and Cumberland Village

 

 

 

Conduct a speed zone review

2010

Internal

Y

Install a traffic camera at the Cameron Street intersection

2010

20

Y

Trim Road Intersection Strategy

 

 

 

Improve the intersection geometry and capacity at the Trim Road intersection

2010/2011

To be coordinated with Trim Road Widening

Y

Relocate the existing transition zone from the freeway section to the two-lane rural arterial road segment

2010/2011

4.2M

N

Introduce speed management strategies in the approaches to the Trim Road intersection and the new transition zone

2010/2011

Unknown

(Minor)

N

Introduce street lighting on the approaches to the Trim Road intersection and in the new transition zone

Beyond 2011

1.5M

N

MEDIUM -TERM STRATEGIES

 

 

 

Corridor-Wide

 

 

 

Implement recommendations of the roadside safety design study

2011/2013

Unknown

N

Improve the intersection geometry at unsignalized intersections

Beyond 2011

6.5M

N

Develop and implement an access management strategy

Beyond 2011

4.5M

N

Upgrade the pavement width on the corridor

Beyond 2013

Unknown

N

Cameron Street Intersection and Cumberland Village

 

 

 

Improve the intersection geometry and capacity at Cameron Street intersection

Beyond 2011

7M

N

Total of known/estimated costs

 

24.3M

 

Note: where funding has not been identified it will be included in budget estimates beyond 2010

 

Short-Term Strategies

 

The implementation of the short-term strategies has already started with the installation of the traffic control signal at Canaan and OR 174 and the microsurfacing of the easterly portion of OR 174 this past summer.  It is expected that all short-term strategies, except for the work near the Trim Road intersection (to be coordinated with Trim Road Widening project), will be implemented by 2011

 

Corridor-Wide

 

·         Improve roadway surface: A microsurfacing treatment was applied on the pavement surface from Cameron Street to Canaan Road in 2009 as part of the annual Resurfacing Program.  This treatment is applied to roadway surfaces that are still in good condition.  It is intended to improve skid resistance and protect the roadway pavement structure.  The treatment is cost effective in the long term by delaying more costly resurfacing and reconstruction of the roadway pavement.  It is approximately 20-30% of the cost of a new asphalt overlay and can be expected to last approximately 5-7 years. 

 

·         Upgrade signage and pavement markings: A sign inventory will be developed in 2010 to determine the condition of each sign along the rural arterial road segment of OR 174 and signs will be replaced as required.  Also, pavement markings will be repainted as required. The implementation is planned from 2010 to 2011 and the estimated cost is $100,000.  It has been identified as a project within the Draft 2010 Safety Improvement Program for Council consideration.

 

·         Install centreline rumble strips: This countermeasure will improve the positive guidance on the road and alert drivers of the presence of no passing zones, as shown in Document 3. The estimated cost of this project is $ 20,000 and funds are available in the Safety Improvement Program account and will be implemented in 2010.

 

·         Increase the pavement width on horizontal curves: The pavement width will be marginally widened on selected horizontal curves west of Quigley Hill Road intersection, as shown in Document 4.  It would prevent vehicles off-tracking at horizontal curve locations. The estimated cost of this project is $230,000 and funds are available in Safety Improvement Program account and will be implemented in 2010.

 

·         Conduct a roadside safety design study: The study will identify roadside barriers for replacement as well as potential locations for new installations.  It will also determine which ditches along the corridor need improvements.  The estimated cost of this study is $75,000 and it has been identified as a project within the Draft 2010 Safety Improvement Program for Council consideration.

 

·         Improve unsignalized intersections: The work to upgrade unsignalized intersections within the corridor has already started at the following locations:

 

§  Canaan Road intersection: A new traffic signal was installed at this location in November 2009, as shown in Document 3.

 

§  Quigley Hill Road intersection: A traffic signal analysis conducted at this intersection concluded that a traffic signal is not warranted at this time.  A preliminary design of geometric improvements to provide left turn lanes for this intersection will be done in 2010 and the estimated cost of the design study is $30,000, as shown in Document 4 and funds are available in the Safety Improvement Program account.  The funds for the construction of this project will be requested in future capital budgets as a strategic initiative.

 

·         Intersection illumination: Under the City Lighting Policy, this section of roadway warrants only marker lighting at any intersection.  Marker lighting consists of only 1 light at a "T" intersection and 2 lights at a four-way intersection.  All unsignalized intersections on the corridor only warrant the addition of 1 light.  The estimated cost of installing them is approximately $125,000 and it will be implemented between 2010-2011. Funds are available in Safety Improvement Program account.

 

·      Conduct a corridor wide speed zone review: Once all short-term strategies have been implemented, undertake a corridor wide speed zone review to ensure that the appropriate speed limit is in place for this corridor. This will be completed internally by staff and is on the Department’s workplan for 2011.

 

·      Continue the work in education and enforcement: The corridor is identified as a target location through the annual Integrated Road Safety Program campaigns.

 

Cameron Street Intersection and Cumberland Community Strategy

 

·      Conduct a speed zone review: In 2010, a speed zone review using the newly approved City of Ottawa Speed Zoning Policy will be conducted within the Cumberland Village.

 

·      Install a traffic camera: A new traffic camera will be installed at Cameron Street to monitor traffic operations and adjust traffic signal timing in real time.  The estimated cost of this project is $20,000 and it will be implemented in 2010, as shown in Document 5. Funds are available in Safety Improvement Program account.

 

Trim Road Intersection Strategy

 

·         Improve the intersection geometry and capacity:  The Trim Road intersection will be improved as part of the Trim Road Widening (Ottawa Road 174 to Frank Kenny).  The design study will be conducted in 2010 and the construction is expected in 2011. Funding is available for the design study in the 2010 draft capital budget for council consideration and funds required for the construction will be requested in the 2011 capital budget as part of the Trim Road Widening (Ottawa Road 174 to Frank Kenny) project in 2011.

 

·         Relocate the existing transition zone: The existing transition zone from the freeway section to the two-lane rural arterial road segment located within a horizontal curve will be relocated further east of its existing location, as shown in Document 4.  The design and construction of this geometric improvement will be coordinated with improvements planned at the Trim Road intersection, which is part of the Trim Road Widening (Ottawa Road 174 to Frank Kenny). The design study will be conducted in 2010 and the funds to construct the upgraded transition zone from the freeway section to the two-lane rural arterial road segment in the estimated amount of $4.2 million will be requested as a part of the Trim Road Widening (Ottawa Road 174 to Frank Kenny) project in 2011.

 

·      Introduce street lighting: The street lighting on the approaches to the Trim Road intersection and the upgraded transition zone will enhance driver awareness of the road changes and reduce the risk of nighttime collisions.  The implementation of this project will be coordinated with the construction of the geometric improvements at the Trim Road intersection and the upgrade of the transition zone in 2011. The funds required in the estimated amount of $1.5 million will be requested in the 2011 capital budget as part of the Trim Road widening project.

 

·      Introduce speed management strategies: The location of the existing flashing beacon and signage on the approaches to the Trim Road intersection will be assessed.  As well, new traffic safety strategies will be identified as a part of the design study of the geometric improvement at the Trim Road intersection and the upgraded transition zone.  Generally, these strategies are expected to be low cost and the necessary funds for implementing the strategies will be requested within the 2011 Safety Improvement Program.

 

Medium-Term Strategies

 

Funding Pressures: Currently, there is no available funding to implement the recommendations listed below.  Staff is recommending that the City request funds from the provincial and federal governments to assist with implementing these strategies.  Staff have had very preliminary discussions and upon approval of the report, will formalize discussions to identify which funding programs may be applicable.  A preliminary assessment was conducted to provide an estimated cost for each recommendation.  A further detailed engineering study would be required to determine the appropriate combination and simultaneous implementation of these recommendations.

 

Corridor-Wide

 

·         Improve roadside safety: The roadside safety design study will provide the estimated cost of improving the roadside along the corridor.  This will include installing or upgrading roadside barriers and improving side ditches.  The required funds to implement the work will be requested in future capital budgets (between 2011 and 2013) as a strategic initiative.

 

·         Improve the intersection geometry at unsignalized intersections: The intersection geometry of unsignalized intersections can be improved by lengthening existing auxiliary lanes and transition tapers, and providing left turn lanes.  The design and construction cost, and property acquisition is estimated at $6.5 million.  Further, any future geometric improvement of unsignalized intersections and roadway accesses should be staged in two areas, east and west of the Cameron Street intersection.

 

·         Develop an access management strategy: With regards to the accesses, the safety study suggests “in order to preserve the functionality of this roadway, careful consideration of access management within this corridor is required”.  The estimated cost of implementing this recommendation is approximately $4.5 million.  The Planning and Growth Management Branch is reviewing the access management issues and the recommendations provided in the safety study.  Further, TMP (6.4) Road Design section recommends against permitting “new accesses to Highway 174 east of Trim Road, despite that road’s arterial road classification, to preserve a safe travel environment in view of its high traffic speeds and volumes”.

 

·         Upgrade pavement width: Existing roadway surface (pavement) on the corridor is in good condition.  A new assessment will be conducted in future years and the width of the pavement will be slightly widened to prevent vehicles off-tracking on the road.

 

Cameron Street Intersection and Cumberland Community Strategy

 

·         Improve the intersection geometry and capacity at Cameron Street intersection: A traffic capacity study would be required to carry forward a full assessment of the delay benefit and/or compromises derived from improving the intersection capacity at the Cameron Street intersection.  As well, the design of the intersection geometry improvement should be extended to consider speed management strategies on the approaches to the intersection and through the Cumberland Village and include pedestrian and cycling traffic.  The design and construction cost, and property acquisition of this project is estimated at $7 million.  The recommendation was forwarded to the Planning and Growth Management Branch for review and will be seeking funding for this project in future years.

 

Corridor Operation Improvements

 

In addition, preliminary analysis was conducted for each of two candidate corridor-wide operational strategies; four-laning OR 174 from east of Trim Road to Canaan Road (City limits) and introducing passing lanes.  The results of the preliminary analysis suggest that neither of these strategies can be justified based solely on safety factors.   Although the analysis shows that these measures would reduce vehicular delays, from a traffic safety perspective, the benefit to the corridor is not as clear.

 

A traffic capacity study would be required to carry forward a full assessment of the delay benefit and/or compromises derived from the four-laning or introduction of passing lanes and alternative scenarios to achieve corridor-wide operational improvements.  This task was not within the scope of the safety study.  It should be noted that the Transportation Master Plan (TMP), which was approved by City Council in 2008, does not include the four-laning of OR 174 east of Trim Road.

 

Based on the results of the preliminary traffic safety analysis of the Corridor Operation Improvements noted above, only those strategies included in the road safety implementation plan (Table 2) should be considered at this time.

 

CITY STRATEGIC DIRECTIONS

 

The safety recommendations included in this report are consistent with the Service Priorities for the City Strategic Plan 2007 – 2010, specifically the following:

 

§  Transportation Priority, Objective 1 - Continue to undertake Road Safety Audits along major corridors in order to address traffic safety issues.

 

The principles of the Ottawa 20/20 Transportation Master Plan (TMP), Section 6.5 Road Safety, approved by Council at its meeting November 28, 2008, are reflected in the safety strategies recommended in this report.

 

RURAL IMPLICATIONS

 

Ottawa Road 174 east of Trim Road intersection up to the City limits east of the Canaan Road intersection is an arterial rural road.  By implementing the recommendations provided in the report, the traffic safety conditions along this corridor are expected to improve.

  

CONSULTATION

 

The Ward Councillors have been briefed and concur on the findings of the road safety study and the implementation plan set out in this report.

 

Infrastructure Services and Community Sustainability Department staff was consulted regarding this report.

 

LEGAL/RISK MANAGEMENT IMPLICATIONS

 

There are no legal/risk management impediments to implementing the report recommendations.

  

FINANCIAL IMPLICATIONS

 

Funds are available in the 2009 and prior year approved capital budgets to fund the following short-term strategies;

 

·         Construction of centre line rumble strips - $20K;

·         The pavement width improvement on selected horizontal curves west of Quigley Hill Road - $230K;

·         The preliminary design of geometric improvements at Quigley Hill Road - $30K;

·         The installation of a new camera at Cameron Street intersection - $20K;

·         The installation of marker lighting at unsignalized intersections within the corridor – $125K.

 

Funding requests have been made in the Draft 2010 capital budget for the following short-term strategies;

·         Signage and pavement marking upgrades - $100K;

·         Roadside safety design study - $75K.

 

Future capital requests will be made as per the recommendations contained in this report.

  

SUPPORTING DOCUMENTATION

 

Document 1 -  Key Plan - Ottawa Road 174 from Trim Road to Canaan Road (City limits) Study Area (Immediately following the report)

Document 2 -  Collision Summary - Ottawa Road 174 from Trim Road to Canaan Road (City limits) (Immediately following the report)

Document 3 -  Key Plan of Locations of the Centreline Rumble Strips - Ottawa Road 174 from Trim Road to Canaan Road (City limits) (Immediately following the report)

Document 4 -  Key Plan of Improvement on Horizontal Curves and Intersection Improvement  - Ottawa Road 174 from Trim Road to Quigley Hill Road (Immediately following the report)

Document 5 -  Key Plan of Cumberland Village and Cameron Street intersection (Immediately following the report)

 

DISPOSITION

 

Following Council approval, the Department of Public Works will implement the recommendations identified in this report. 

 

 

DOCUMENT 1

OR 174 (Trim Road – Canaan Road)


DOCUMENT 2

Ottawa's Collision Summary

Location:

 

OR 174 From Trim Road to Canaan Road (City Boundary)

 

 

Time Period Covered:

01/01/2003 - 31/12/2007

 

 

 

 

Total of Collisions:

270 collisions

 

 

 

 

 

Remarks:

 

All Collisions (Two-Lane, Two-Way Road)

 

 

 

 

 

 

 

 

 

 

 

Location

At/From

To

Total

Non-fatal injury

Fatal Collisions

PDO

Signalized intersection

OR 174

TRIM RD

 

57

10

 

47

 

OR 174 EB

510 E OF TRIM RD

TRIM RD

14

4

 

10

Mainline Segment

OR 174 WB

510 E OF TRIM RD

TRIM RD

5

1

 

4

 

OR 174

510 E OF TRIM RD

QUIGLEY HILL RD

44

7

2

35

Unsignalized intersection

OR 174

QUIGLEY HILL RD

 

3

1

 

2

Mainline Segment

OR 174

CAMERON ST

QUIGLEY HILL RD

31

7

1

23

Signalized intersection

OR 174

CAMERON ST

 

21

4

 

17

Mainline Segment

OR 174

CAMERON ST

WEST ST

3

0

 

3

Unsignalized intersection

OR 174

WEST ST

 

1

0

 

1

Mainline Segment

OR 174

FAUBERT ST

WEST ST

8

1

 

7

Unsignalized intersection

OR 174

FAUBERT ST

 

4

2

 

2

Mainline Segment

OR 174

EAST ST

FAUBERT ST

5

2

 

3

Unsignalized intersection

OR 174

EAST ST / PETER HARKNESS LANE

 

2

0

 

2

Mainline Segment

OR 174

EAST SHORE RD

EAST ST

14

3

 

11

Unsignalized intersection

OR 174

EAST SHORE RD

 

2

1

 

1

Mainline Segment

OR 174

EAST SHORE RD

MORIN RD

3

0

 

3

Unsignalized intersection

OR 174

MORIN RD

 

0

0

 

0

Mainline Segment

OR 174

MORIN RD

OLD MONTREAL RD

11

1

 

10

Unsignalized intersection

OR 174

OLD MONTREAL RD W  (Kinsella Dr)

 

1

0

1

0

Mainline Segment

OR 174

OLD MONTREAL RD W

OLD MONTREAL RD E

22

4

 

18

Unsignalized intersection

OR 174

OLD MONTREAL RD E

 

4

2

 

2

Mainline Segment

OR 174

OLD MONTREAL RD

MCTEER RD

5

1

 

4

Unsignalized intersection

OR 174

CANAAN RD

 

1

0

 

1

Mainline Segment

OR 174

CANAAN RD

MCTEER RD

8

1

1

6

 

OR 174

CANAAN RD

CITY BOUNDARY

1

0

 

1

 

TOTALS

270

52

5

213

 


DOCUMENT 3

 

 


DOCUMENT 4

 

 

 


DOCUMENT 5

 


Ottawa Road 174 – In-Service Road Safety Review

            ROUTE 174 - Examens de la sécurité des Routes en Service

ACS2009-COS-PWS-0024                                          Orléans (1) and /et Cumberland (19)

 

Klaus Beltzner recognized that improvements are greatly needed on Ottawa Road 174 and he commended staff for bringing forward such an excellent report that addresses that particular issue.  However, by comparison, Prince of Wales Drive was also downloaded from the province and has been approved by the City for a road widening, as opposed to specifically addressing safety issues and he wondered what determines whether the City is going to go ahead and look at an EA (environmental assessment) project for widening a road, as opposed to doing a safety assessment.  A copy of his e-mail dated 30 November 2009 was previously distributed and a copy is held on file.

 

Councillor Bloess recognized these were valid points and wanted assurances that what is going to occur was not a form of piece-mealing.  John Manconi, the General Manager of Public Works confirmed it is not a piece-mealing of the EA, but is a Safety Review Program and the two are not to be mistaken as an interplay of one against the other.  Vivi Chi, Manager of Transportation Planning added further clarification to the delegation’s concerns about why one project is an EA while the other is not.  She indicated that EAs are for widenings and widenings are always determined by the forecasted need.  Because of growth in the east (affecting Ottawa Road 174) and in the south urban community (affecting Prince of Wales Drive), the TMP reflects very different growth rates and growth forecast numbers.  Therefore, Prince of Wales Drive was identified for widening because of need and the other was not.

 

Councillor Jellett made note of the fact that this report clearly indicates the safety problems on this road and the fact that it needs a lot of work.  He was therefore quite pleased to see some short, medium and long-term strategies recommended to improve safety.  At the same time, however, he believed that what was really required was a road widening.  He recognized that the road does not meet that need in the TMP because the growth is not occurring within the City of Ottawa, but outside, from neighbouring communities.  He cautioned that this is only going to get worse and offered that the province needs to take control of this road.  He indicated the MPP for the area supports that as well and he had a Motion that Councillor Bloess would introduce on his behalf to address this particular need.

 

Councillor Desroches noted that there are probably some projects that have been examined for improvement, but which are not scheduled for many years and he wondered about the criteria that goes into determining where these traffic management studies should be conducted and if there are some projects that are scheduled a long way off where short term initiatives can be undertaken.  Mr. Manconi explained that this is the first year for the safety reviews and staff initially selected those in greatest need of attention.  He advised that they are developing screening criteria to filter through the list of roads, which he offered to share with the councillor.  The councillor referred to the EA for Prince of Wales Drive and how the design work is going to take several years, and he hoped that road would not be excluded from other improvements because the solutions to the problems on such roads are a long way away and there may be a need for interim safety improvements.

 

Moved by R. Bloess

 

Whereas on April 25, 2008, the City informed the Government of Ontario by letter that it is prepared to provide the necessary authorization to the Province of Ontario or to the United Counties of Prescott and Russell to conduct an Environmental Assessment for the widening of the Highway 174 (Trim Road easterly to Rockland) as agent for the City of Ottawa; and

 

Whereas the City has not received a response from the Government of Ontario; and

 

Whereas a safety audit of the Highway identifies areas where widening and other measures could improve the safety of citizens using the road;

 

Therefore be it resolved that the City once again request the Government of Ontario to conduct an Environmental Assessment on widening the road.

 

                                                                                                CARRIED

 

That Transportation Committee recommend that Council approve:

 

1.         That staff implement all short-term strategies identified in the report along the two-lane arterial road segment of Ottawa Road 174 east of Trim Road and that this work be completed within current budgeted programs.

 

2.         That staff undertakes a preliminary design of geometric improvements at the intersection of Ottawa Road 174 and Quigley Hill Road and that funds for the construction of these geometric improvements be requested in future capital budgets.

 

3.         That Infrastructure Services staff be directed to design and construct the extension of the transition zone from the freeway section to the two-lane rural arterial road segment including the installation of street lighting, as shown in Document 4 and to increase the base budget of the Trim Road Widening (Ottawa Road 174 to Frank Kenny) project from $ 29.3 million to $ 35 million to fund in the 2011 capital budget.

 

4.         That funding required to implement all medium-term strategies identified in the report be included for consideration in future capital budgets, and

 

5.         That the City request funds from the province and the federal government to implement the road safety strategies included in the report.

 

6.         That the City once again request the Government of Ontario to conduct an Environmental Assessment on widening the road.

 

                                                                                                            CARRIED, as amended