Council / Conseil
28 April 2010 / le 28 avril 2010
Submitted by/Soumis par : Kent Kirkpatrick
City Manager/Directeur municipal
Contact Person/Personne
ressource : Donna Gray , Director/Directrice
Organizational Development and
Performance/Développement organisationnel et rendement
(613) 580-2424 ext. 25684, donna.gray@ottawa.ca
Ref N°: ASC2010-COS-ODP-0007 |
ASC2010-COS-ODP-0007
SUBJECT:
|
POST-BUDGET CITY STRATEGIC
PLAN (Term of Council 2007-2010 – ENDING DECEMBER 31, 2010) |
|
|
OBJET :
|
Plan stratégique de
la ville – versioN post-budgétaire (Mandat du Conseil 2007-2010 – SE TERMINANT
LE 31 DÉCEMBRE 2010) |
That Council receive the
updated version of the City Strategic Plan (Term of Council 2007-2010) attached
as Document 3.
Que le Conseil prenne connaissance
de la mise à jour du Plan stratégique de la Ville (mandat du Conseil
2007-2010), telle qu’elle figure dans le Document 3.
The
2007-2010 City Strategic Plan was developed through an in-depth strategic
planning process that took place in 2007, and sets out City Council's
priorities for its four-year term of Council.
The Plan was renewed in 2008 to reflect post-budget priorities, adding a
series of more definitive objectives beneath each priority area.
As part of the 2010 budget deliberation process, each Standing Committee of Council was presented with a customized report outlining progress to date on the City Strategic Plan in relation to each Committee’s mandate (ACS2009-COS-ODP-0007; 0008; 0009; 0010; 0011). Through the budget process, these City Strategic Plan Supplementary reports were received and reviewed by each Standing Committee and were approved during the budget deliberations on January 23rd, 2010. The accepted changes and revisions in those supplemental reports have been consolidated into the attached document to form the current and updated 2007-2010 Strategic Plan for the City of Ottawa (Document 3).
The pre-budget reports to
Standing Committees allowed each Standing Committee to re-situate itself in the
City Strategic Plan prior to considering budget decisions for the next year.
Taken together, the City Strategic Plan provided the priority directions and
the budget document provided the financial framework.
The revised document is the up-to-date City Strategic Plan including identification of funds approved through the 2010 budget process. While, in some instances, funds are also identified for subsequent years, they are not pre-commitments for future Councils but rather they are provided for information.
In
the fall of 2009, as part of the budget process, a report was prepared for each Standing Committee of Council,
providing a customized update of the progress towards achieving the priorities
related to the individual Committee’s mandate. As part of this
pre-budget process, the previous two years of work of each Standing Committee
was reviewed to identify reports and motions that specifically responded to
priorities in the City Strategic Plan. Each pre-budget report provided a general update on
progress on the pre-existing actions found in the plan, and also presented a
roll-up of new actions directed by each Standing Committee. Internal consultation was undertaken with
Members of Council and senior City staff to capture all new key strategic activities and projects directed by Council and approved
over the past two years.
From this background research and
consultation, changes were made to the City Strategic Plan and are now
reflected in the attached updated City Strategic Plan document which is a
compilation of all the reports that went to Standing Committees during the
budget process. For convenience, Document 1
summarizes all of the revisions to the City Strategic Plan.
An
important concept that this updated City Strategic Plan aims to integrate and
support, is that of Community Sustainability.
Community Sustainability
is a concept that promotes the wise use of resources environmentally,
economically and socially to ensure efficient and responsible use of all
community resources over time so that
the needs of the community are met now and in the future.
A
second important element incorporated in this updated City Strategic Plan
pertains to the City's “Service Delivery” priority. When Council initially
developed their Strategic Plan, service delivery was identified as a priority.
At that time Council made a commitment to the citizens of Ottawa to improve the
delivery of City services. In the fall
of 2008, the City began its transformation to service excellence by reviewing
and re-aligning all City services to better meet the needs of citizens and
improve the overall customer experience. Citizen-centric service means
designing services to be delivered and accessed from the point of view of the
citizen / client, providing a greater level of choice, convenience and
flexibility, and ensuring services are harmonized and coordinated to provide
seamless access.
The updated 2007-2010 City Strategic Plan (attached as document 3), includes:
Achievements
The City Strategic Plan is not intended to be an exhaustive list of
everything the City does. More detailed information is addressed in budget documents,
City Master Plans (Transportation Plan, Infrastructure Plan, Human Services
Plan, etc.), Standing Committee’s Plans and the City of Ottawa Annual Report.
Instead, the priorities and objectives in the City Strategic Plan provide focus
to the City’s efforts for the term of Council, and provide a yardstick to
measure the City’s performance.
In
the two years since the previous update of the City Strategic Plan much has
been accomplished at the City of Ottawa in relation to each of the strategic
priority areas. A few of the successes
achieved in the past two years which directly address priorities set out in the
2007-2010 Strategic Plan include:
A
more comprehensive listing of achievements that are in direct support of the
strategic priorities can be found in Document 2.
In
2008, City Council identified the growing gap between what the City was
spending on infrastructure and what the requirements of maintaining our assets are
for meeting the demands of a growing population and for building strong,
sustainable and liveable communities. On June 5, 2009 the Government of Canada,
Province of Ontario and City of Ottawa announced $375 million in economic
stimulus funding for infrastructure projects across the City of Ottawa.
Cost-shared equally by all three levels of Government, Infrastructure Stimulus
Fund (ISF) projects will be completed by March 2011.
With
an estimated $600 million in City funded capital projects in the 2010 Budget,
in addition to the $375 million in economic stimulus funding, the City is
working to close its infrastructure gap with the unprecedented delivery of
construction and renewal projects
that will enhance our City through targeted investments in Ottawa’s roads,
transit, pedestrian and cycling facilities, and cultural initiatives which will
continue to support the priorities identified in the City Strategic Plan.
CONCLUSION
The evolution of the City's Strategic Plan has shifted the process from a staff developed and driven document to a Council directed priority setting and planning process. This evolution will continue and, with each passing year, the City Strategic Plan will become increasingly integrated with other planning and reporting processes at the City.
The updated 2007 – 2010 City Strategic Plan will be completed at the end of this calendar year with action tracking on the items in this current plan continuing throughout 2010. However, early in 2011, a new City Strategic Plan will be developed with the newly elected Council. Staff are currently undertaking a review of the strategic planning process previously employed at the City of Ottawa, reviewing best practices and developing a process for the next Strategic Planning cycle using a methodology that will move the corporation further in the direction of fully integrated planning practices and processes.
There are no specific rural implications associated with this report. However, within each of the CPS priorities there are recommended actions/activities supporting the Ottawa rural communities.
In addition to the public
consultation related to the development of Council’s approved 2007-2010
Strategic Plan, there has been substantial internal consultation with all
departments and standing committee chairs and vice-chairs, during the
preparation of the pre-budget Standing Committee reports on the City Strategic
Plan.
Not applicable as this is a City-Wide report.
There are no legal/risk management impediments to the implementation of
this report’s recommendation.
Within the City Strategic Plan are
recommended actions/activities supporting the objectives of each of the
Council’s priorities, identifying any financial implications. Many of the actions/activities require no
additional funding. All costs for the
actions and activities fall within Council’s financial framework and are listed
in the approved 2010 City capital and operating budget.
Approval of the City Strategic Plan is a key step in the advancement of Council’s strategic directions as set out in the 2007-2010 City Strategic Plan.
Not applicable
Document 1 – Summary of all revisions found in this updated City Strategic Plan
Document 2 – List of Achievements (Term of Council 2007-2010)
Document
3 –City Strategic Plan (Updated 2007-2010)
(issued separately to all members of
Council and held on file with the City Clerk.)
The Organizational Development and
Performance Department will make the final version of the City Strategic Plan available
on-line and at City facilities.
document 1
Summary of All Additions and
Revisions to City Strategic Plan
2010 Post-Budget Refresh
Transportation Priority
New Actions
|
Committee |
Department |
Start / End |
Provide support and financial
assistance through the Snow Go and Snow Go Assistance programs to help
seniors and people with disabilities secure reliable and affordable services
for clearing snow and ice from private driveways and walkways |
Transportation |
Public Works |
2007 / 2010 |
Implement the Integrated Street
Furniture Program |
Transportation |
Community Sustainability |
2008 / 2010 |
Implement the design of the William Street Pedestrian Area Feasibility Study |
Transportation |
Community Sustainability |
2009
/ 2010 |
Review the Transportation Impact Assessment Guidelines |
Transportation |
Planning and Growth Management |
2010 / 2010 |
Assess transportation issues of the Downtown Ottawa Urban Design Strategy (DOUDS) related to pedestrian and cycling linkages affected by the Downtown Ottawa Transit Tunnel (DOTT) project |
Transportation |
Planning and Growth Management |
2010 / 2012 |
Implement the ecoMobility
Service Pilot Project |
Transportation |
Community Sustainability |
Ongoing |
Transit Priority
New Actions
|
Committee |
Department |
Start / End |
Implement the Interprovincial Transit study |
Transit |
Planning and Growth Management |
2009 / 2012 |
Implement the Rapid Transit Network - Phase I |
Transit |
Transit |
Ongoing |
Plan and implement increases in transit service levels to respond and to lead increases in ridership |
Transit |
Transit |
Ongoing |
Plan and implement extensions of the transit network into new urban areas of the City as they are developed allowing residents of new areas to have mobility across the urban parts of the City without using a car |
Transit |
Transit |
Ongoing |
Plan and implement improvements to the design of the transit network to carry customers to their destinations more quickly and more efficiently |
Transit |
Transit |
Ongoing |
Implement new SmartBus features to improve service delivery, realize efficiencies and increase ridership |
Transit |
Transit |
Ongoing |
Plan the specifications for future transit facilities as defined in the Transportation Master Plan and approved in capital budgets |
Transit |
Transit |
Ongoing |
Complete
an accessibility audit of the Transit built environment as well as customer
service components |
Transit |
Transit |
2009 / 2010 |
Implement bilingual Automated Next Stop Announcements |
Transit |
Transit |
2009 / 2016 |
Produce a roadmap outlining how OC Transpo will deploy its accessible transit services in the future |
Transit |
Transit |
2009 / 2010 |
Increase additional trips on Para Transit service |
Transit |
Transit |
2010 |
Implement
a completely accessible rail system |
Transit |
Transit |
Ongoing |
Assess conversion to bio- or #2 Low-Sulphur diesel based on price attractiveness |
Transit |
Transit |
2010 /2010 |
Solid Waste and
Environment Priority
The following paragraph has been added to the Solid Waste and Environment Priority description: Environment sustainability involves objectives and actions to implement the City Environmental Strategy; including reductions in corporate and community greenhouse gas emissions, green building, protection of the water environment, and reduced resource use.
New Objective 1: Enhance environmental sustainability and reduce greenhouse gas emissions by 30 per cent (corporate) and 20 per cent (community) from 1990 levels by 2012.
New Actions
|
Committee |
Department |
Start / End |
Develop and implement the Community Sustainability Strategy |
PEC |
Community Sustainability |
Ongoing |
Implement the Green Fleet Plan |
Transportation & PEC |
Public Works |
2009 / 2010 |
Create incentives to reward sustainable innovation |
PEC |
Community Sustainability |
Ongoing |
New Objective 2: Increase waste diversion
New Actions
|
Committee |
Department |
Start / End |
Seek out private sector partners to pilot Industrial, Commercial and Institutional (IC&I) waste recycling programs (IC&I 2015 Strategy) |
PEC |
Environmental
Services |
2010 |
E-Waste |
PEC |
Environmental
Services |
2008 / 2010 |
Household Hazardous Waste Depots |
PEC |
Environmental
Services |
2009 / 2010 |
Waste Diversion Pilot Projects |
PEC |
Environmental
Services |
2008 / 2009 |
Implement Phase 1 of the Diversion 2015 strategy for the management of Industrial, Commercial and Institutional (IC&I) waste |
PEC |
Environmental
Services |
2009 / 2011 |
Program for Organics Green Bins |
PEC |
Environmental
Services |
2010 |
New
Objective 3: Protect the water environment and source water supply
New Actions
|
Committee |
Department |
Start / End |
Develop capacity to undertake leading-edge research |
PEC |
Community Sustainability |
Ongoing |
Support the Ottawa River Fund and Ottawa River Integrated Protection Plan |
PEC |
Environmental Services |
Ongoing |
Foster Pond and Kennedy Burnette Storm Water Facility Environmental Assessments (EA) |
PEC |
Planning and Growth Management |
2010 / 2010 |
Sustainable, Healthy and Active City Priority
New Actions
|
Committee |
Department |
Start / End |
Complete and implement the Recreation Master Plan |
CPSC |
Parks, Recreation and Cultural Services |
2008 / 2012 |
Construct a new licensed childcare centre with “LEED Silver” designation |
CPSC |
Community and Social Services |
2009 / 2010 |
Implement a Fee Stabilization Plan to manage the fee subsidy purchase of the service budget process |
CPSC |
Community and Social Services |
2009 / 2011 |
Undertake
community-based pedestrian plans |
PEC |
Planning and Growth Management |
2010 / 2012 |
Implement the recommendations of the Cycling Plan, including: implementing a permanent Bikeshare Program and school travel planning pilot projects |
Transportation |
Planning and Growth Management |
2010 / 2012 |
Implement
the recommendations of the Pedestrian Plan |
Transportation |
Planning and Growth Management |
2010 / 2012 |
Undertake a pedestrian safety evaluation pilot program |
Transportation |
Public Works |
2010 / 2012 |
Focus on creating a healthier, liveable downtown as an outcome of the Downtown Ottawa Transit Tunnel (DOTT) project |
Transportation |
Planning and Growth Management |
Ongoing |
Increase compliance to meet provincial targets for frequency of food safety inspections |
CPSC |
Ottawa Public Health |
Ongoing |
Develop
seniors strategy and implementation plan |
CPSC |
Organizational Development and Performance |
Ongoing |
Advocate for regional food safety training programs that are fully bilingual |
CPSC |
Ottawa Public Health |
Ongoing |
Implement the Poverty Reduction Framework |
CPSC |
Community and Social Services |
Ongoing |
Refresh and implement Ottawa 20/20 Arts & Heritage Plans |
CPSC |
Parks, Recreation and Cultural Services |
2009 / 2016 |
Implement the Rural Arts and Diversity Funding strategies as recommended in the Art Investment Strategy and Festival Sustainability Plan |
CPSC |
Parks, Recreation and Cultural
Services |
2007 / 2012 |
Planning and Growth Management Priority
New Objective 1: Manage growth and
create liveable communities by:
-
Becoming
leading edge in community and urban design
-
Ensuring
that new growth is integrated seamlessly with established communities
-
Ensuring
that community facilities are built in tandem with new development
- Evaluating the impact of policy and development decisions on communities
New Actions
|
Committee |
Department |
Start / End |
PEC |
Planning
and Growth Management |
2010 / 2010 |
|
PEC |
Planning
and Growth Management |
Ongoing |
|
Conduct Peer Reviews for priority areas |
PEC |
Planning
and Growth Management |
2010 / 2010 |
Host
the 2010 Sustainable Cities PLUS Network Biennial Conference |
PEC |
Community Sustainability |
2010 / 2010 |
Develop the “Choosing Our Future” Initiative, a long-term vision and plan for Ottawa and Canada’s Capital region based on the principles of sustainability |
PEC |
Community Sustainability |
2008 / 2011 |
New Objective 2: Invest in programs and initiatives that
improve Ottawa’s business climate, support job creation and enhance the city’s
social and economic prosperity
New Actions
|
Committee |
Department |
Start / End |
Refresh and implement the new Economic Development Strategy |
CSEDC |
Community
Sustainability |
Ongoing |
Governance Priority
New Actions
|
Committee |
Department |
Start / End |
Enhance the ability of Council to set strategic Public Health direction through the creation of a independent Board of Health |
CSEDC CPSC |
Ottawa
Public Health |
2008 / 2010 |
Develop a Petition Policy |
CSEDC |
City
Clerk & Solicitor |
2009 / 2010 |
Increase communication and outreach activities for Environmental Services |
PEC |
Environmental Services |
Ongoing |
Increase transparency
by reporting annually on applications that have been amended and/or refused |
PEC |
Planning and Growth Management |
2010 / 2010 |
Strengthen Councillor engagement by providing regular Councillor briefings on key development applications |
PEC |
Planning
and Growth Management |
Ongoing |
Service Delivery Priority
New
Objective 1: Improve citizen/client satisfaction: improve the experience and
interaction citizens and staff have with City services.
Client Satisfaction is defined as the extent to which
government service clients are satisfied with the services that they
receive. Client Satisfaction is measured
by surveying clients on five key satisfaction dimensions: timeliness, outcome, courtesy, fairness, and
knowledgeable service providers. The
City of Ottawa aims to improve the experience and interaction citizens have
with City services. This includes
ensuring that City Services are:
o
Easy
to find and access
o
Timely
and coordinated
o Delivered in a manner that respects the needs of the citizens/clients
o Delivered by knowledgeable staff who have shared ownership of the service experience
New Actions
|
Committee |
Department |
Start / End |
Expand and implement the
Community Development Framework |
CPSC |
Organizational Development and
Performance |
Ongoing |
Enable citizen centred service delivery through optimized 3-1-1 and expanding eService |
CSEDC CPSC |
Corporate |
2008 / 2011 |
Creating a community-based mobile workforce |
CPSC |
Corporate |
Ongoing |
Operational Performance consists of those
operational processes and service delivery mechanisms that allow for the
delivery of government services.
Operational performance is measured on the degree to which processes and
services meet or exceed key efficiency and effectiveness indicators. The City of Ottawa aims to improve the
effectiveness and efficiency of service delivery processes to achieve service
levels that are endorsed by Council and clearly communicated to citizens and
staff.
New Actions
|
Committee |
Department |
Start / End |
Optimize utilization of recreational facilities |
CPSC |
Parks, Recreation and Cultural Services |
Ongoing |
Integrate Community and Social Services Delivery |
CPSC |
Community & Social Services |
2009
/ 2014 |
Improve the availability of the fleet towards a target of 90 per cent |
Transit |
Transit |
2010 |
Implement a Continuous Business Improvement Program in Transit Maintenance |
Transit |
Transit |
Ongoing |
Implement a Technology Roadmap |
CSEDC |
Information Technology |
2010 |
Sponsorship and Advertising |
CSEDC |
Organizational Development and Performance |
2010 |
Integrate
a roadway modification process with the development review process |
Transportation |
Planning and Growth Management |
2010 / 2010 |
Transform Fleet Management |
Transportation |
Public Works |
2010
/ 2012 |
Implement innovative business, management and operational practices |
Transportation |
Public Works |
Ongoing |
Implement a Casual Labour pool |
Transportation |
Public Works |
2010
/ 2010 |
New Objective
3: Improve employee engagement –
improve the overall satisfaction and commitment of staff who deliver and
support City services
Employee Engagement is defined as the extent to which employees are
satisfied with their jobs and are committed to their work and their
organization. Employee Engagement is
measured by surveying employees about job satisfaction and commitment. The City of Ottawa aims to improve the
overall satisfaction and commitment of staff who deliver and support City
services.
New Actions
|
Committee |
Department |
Start / End |
Continued employee engagement through an annual survey, focus groups and internal communications |
Transit |
Transit |
Ongoing |
Re-initiate “Pro in Motion” training, where operators receive continuous training on new ways of doing business and also where operators can share their work experience |
Transit |
Transit |
Ongoing |
Weekly cooperation meetings with the union and management team to strengthen union and management relationship |
Transit |
Transit |
Ongoing |
Develop a People Plan |
CSEDC |
Human Resources |
2010 |
Sustainable Finances Priority
New Actions
|
Committee |
Department |
Start / End |
Advance tangible capital asset reporting to implement State-of-the-Asset Reporting (SOAR) |
CSEDC |
Finances |
Ongoing |
Refresh the Long Range Financial Plan (LRFP) |
CSEDC |
Finances |
Ongoing |
Transportation
Priority
|
·
Developed and approved the Transportation Master
Plan ·
Invested in transportation network growth. ·
Participated in Phase 1 of the Interprovincial
Crossings Study with the NCC. ·
Initiated an Environmental Assessment for the Prince
of Wales Road Widening. ·
Initiated an Environmental Assessment for the Hunt
Club community pedestrian/cycling connection to the Southeast Transitway. ·
Approved the Municipal Parking Management
Strategy. ·
Installed four new cameras at seriously congested
intersections. ·
Expanded the red light camera program to an
additional 15 locations. ·
Completed in-service road safety studies for the
Airport Parkway, Bronson Avenue, Hunt Club, Regional Road 174 and Blackburn
By-Pass. ·
Designed an interactive traffic map that provides
residents with up-to-date information on traffic cameras, construction
locations, road incidents, variable message signs locations and parking
information. ·
Conducted a Speeding Costs You campaign in
spring/summer; initiated the Back Off! tailgating campaign in the fall; and,
reprofiled the Speeding Costs You Deerly campaign. ·
Created the Pedestrian Countdown Signal program
and introduced countdown signals at a number of locations. These initiatives
will improve understanding and safety at signalized intersections. ·
Initiated the Downtown Ottawa Transit Tunnel
(DOTT) Planning and Environment Assessment. ·
Extended the Colonel By Underpass pilot project,
including installation of close-circuit cameras. |
Transit
Priority
|
|
· Developed the Transportation
Master Plan. · Identified the
new rapid transit network. · Developed a
10-year Transit Tactical Plan to support long-term policy and financial
recommendations. · Implemented a
strategic marketing plan to improve transit market penetration. · Developed the
Fleet Management Plan, resulting in a double-decker bus trial, and the
addition of 177 buses with hybrid technology to the fleet and more accessible
buses (now 75% of the fleet). · Refreshed the
Transit Vehicle Emission Reduction Strategy. · Initiated a
review of the Bus Fleet Maintenance Standards and Processes to achieve 90 per
cent fleet availability. · Integrated
Fleet Maintenance, Stores and Facility Maintenance into Transit Services. · Completed a
Strategic Branch Review, which identified 11 key policy standards. |
Infrastructure
Renewal Priority
|
·
Invested funds in roadway renewal (roads,
sidewalks, bridges, etc.): o
Incremental investment from the 2008-2010 two per
cent Capital Tax Levy: $14 million in 2008, $15 million in 2009 and $15 million
in 2010 o
$25 million in 2009/2010 funded under the Federal
Infrastructure Stimulus Fund program. ·
Invested funds in cycling and pedestrian
facilities: o
$5 million for multi-purpose pathway projects in
2010/2011, funded under the Federal Infrastructure Stimulus Fund program. o
Facilities constructed in conjunction with other
capital roadway projects. o
All new arterial road construction designed and
constructed with cycling facilities. ·
Advanced asset management strategies, including
initiation of State of Asset Reporting (SOAR) in coordination with Tangible
Capital Asset Reporting (TCAR). ·
Contributed $40 million towards the $180 million
redevelopment of the Ottawa Convention Centre, which is scheduled to reopen
in mid-2011. ·
Approved the Life Cycle Renewal policy. ·
Developed a Council report on single pad arenas. ·
Retrofitted 25 arena ice pads in 2009. ·
Continued to implement the Energy Retrofit
Program, which replaces existing building components with energy-efficient
equipment, resulting in reduced costs for electricity, natural gas, water and
also a reduction in greenhouse gas emissions. ·
Invested additional funds in the renewal of
buildings, facilities and parks: o
Incremental investment from the 2008-2010 two per
cent Capital Tax Levy: $4 million in 2008, $2 million in 2009 and $4 million
in 2010. o
150,000 in 2009/2010 under the Federal
Infrastructure Stimulus Fund program. o
$7.4 million in 2009/2010 under the Recreational
Infrastructure Canada program. ·
Invested additional funds in renewal and upgrades
of sewer and watermain systems: o
$20 million under the Ottawa River Fund program in
2009 and $22 million in 2010. o
$45 million in 2009/2010 under the Federal
Infrastructure Stimulus Fund program. |
Solid
Waste and Environment Priority
|
·
Developed the Municipal Green Fleet Plan, which is
proposing to eliminate over 3,000 tonnes of GHG emissions and assist the City
in achieving its corporate emission reduction target. ·
Developed the Energy Management and Investment
Strategy to manage utility costs.
Programs/partnerships include: Utility Procurement Strategies and
Policy; Green Building Policy; Utility Management and Accounting Program;
Energy Investment Strategy; and, Partnership Development. ·
From 2002-2009 the City invested over $7 million in energy
reduction measures within existing buildings, including, but not limited to,
building automation systems, heat reclaim, and lighting upgrades. The
improvements have resulted in annual energy and water savings of over $1.5
million, an over 20 per cent return on investment. ·
Upgraded to fluorescent (T5HO) lighting, which is
anticipated to generate a 2 million kWh reduction (equivalent of 600,000 kg
of C02). ·
Established the Ottawa River Fund. ·
Established the Green Bin program. ·
Launched the Take It Back program. ·
Initiated the refresh of the City’s Environment
Strategy. ·
Completed the National Capital Region Air Quality
Mapping Pilot Project. ·
Initiated the Green Building Promotion Pilot
Program. ·
Implemented the new Anti-Idling By-law. ·
Surpassed Corporate Greenhouse Gas Reduction
Targets |
Sustainable,
Healthy and Active Priority
|
·
As approved by Council, two full-time Safety
Consultants have been hired to work with staff on projects/activities
directed at reducing injuries among City staff. ·
Implemented new funding for the Albion
Heatherington Community Centre. ·
Developed a new parkland dedication by-law and
strategy to harmonize policies across the city. ·
Increased funding to community partners to enhance
access to services. ·
Developed a Poverty Reduction Strategy in
consultation with the community and in concert with the provincial Poverty
Reduction Strategy. ·
Formed the Leadership Table on Homelessness. ·
Approved a framework for the Parks and Recreation
Master Plan. ·
Added eight new parks to the City’s inventory. ·
Designated four pilot neighbourhoods to
participate in the Community Development Framework. ·
Developed the Social Housing Administration
Management Information System. ·
Opened the Shenkman Arts Centre. ·
Purchased 55 units of supportive housing for the
vulnerable and homeless. ·
Implemented the Francophone Child Care catch-up
plan, creating approximately 200 subsidized spaces. ·
Provided rent bank funding in partnership with The
Salvation Army to help 264 families per year retain housing. ·
Produced the Faces of Ottawa report as well as
designed and developed an Immigration Ottawa Web portal. ·
Partnered with schools and other community
agencies to promote the health benefits of active living. ·
Promoted the health of the population through
programs aimed at specific populations to reduce risk factors for multiple
chronic diseases (e.g. alcohol misuse, tobacco use and healthy and active
living). ·
Completed the Official Plan, including Smart
Growth principles. ·
Approved the Urban Tree Conservation By-law. ·
Approved the Urban Natural Features Strategy. ·
Developed and approved the Cycling Plan. ·
Developed and approved the Pedestrian Plan. |
Planning
and Growth Management Priority
|
·
Reviewed and adopted new population projections as
part of the Official Plan Review. ·
Approved the transfer of lands to Algonquin
College and La Cité Collégiale for the construction of two new skills
training facilities to help address the city’s chronic shortage of skilled
trades people. ·
Partnered with community organizations to
accelerate job creation (e.g. Lead to Win), and increased tourism investment
and international visibility by hosting major events (e.g. the World
Juniors). ·
Approved the acquisition strategy for buy-back of
business park properties. ·
Approved the acquisition strategy for vacant land
on Petrie Island. ·
Approved 155 units of affordable housing through
Action Ottawa and the Canada-Ontario Affordable Housing Program. ·
Approved an additional $4.6 million for the
Affordable Housing Program to support the development of 247 units of
affordable housing at 424 Metcalfe Street. ·
Developed six new units of affordable housing for
families who were homeless. ·
Secured through the Infrastructure Stimulus Fund
over $46 million for social housing repair and retrofit and $7.2 million for
new affordable housing programs. ·
Completed a five-year review of the Official Plan. ·
Approved a new Development Charges By-law. ·
Completed Ottawa’s first Rural Settlement
Strategy. ·
Completed the Comprehensive Zoning By-law. |
Governance
Priority
|
·
Developed a policy for delegation of powers. ·
Completed the mid-Council term review and
established a new governance structure and mechanisms to streamline Council’s
decision-making process. ·
Explored Bill 130 opportunities to delegate
municipal services or activities through municipal services boards and/or
municipal corporations. ·
Established a process and guidebook to conduct
Strategic Branch Reviews to establish service standards and outcomes and
associated performance measures for branches. ·
Adopted a white paper approach to policy-making
following an analysis of the two-year pilot project. ·
Extended the capability for residents to
participate in public consultations through the new Ottawa Talks online consultation
process. For example, Ottawa Talks was used as a key component in the City’s
Transportation Master Plan consultation phase and resulted in 1,300 unique
online submissions. ·
Established processes to involve Councillors in
the development of public and stakeholder consultation strategies for ward
issues. ·
Developed and implemented an accountability and
transparency policy. ·
Investigated Bill 130 options for increased
accountability and transparency. ·
Identified a process for moving forward on Code of
Conduct policies for elected representatives. ·
Ensured that the Delegation of Authority policy to
declare real property surplus is aligned with the Mid-term Governance report
to streamline the process for declaring property surplus. ·
Completed public consultations and developed
recommendations for a new governance model for the Board of Health. |
Service
Delivery Priority
|
·
Realigned the management structures of Planning
and Growth Management, Infrastructure Services and Public Works to improve the
overall client experience. ·
Improved service integration through central
accountability for all modes of transportation planning. ·
Completed the realignment of the City management
structure to become more client-focussed and support the service excellence
vision. ·
Established a new model for the delivery of shared
services and realigned the management structures for the shared services
organizations to support this model. ·
Launched an enhanced service that allows the
hard-of-hearing to connect directly to the City’s 3-1-1 agents when they call
the Teletype phone number. ·
Improved the capacity of more residents with
accessibility needs to interact with the City by extending the BrowseAloud
accessibility service on ottawa.ca. ·
Launched the Development Application Search tool
on ottawa.ca. This tool provides the community with convenient access to
identify, research and make comments on applications submitted through the
development process. ·
Launched an Online Volunteer Management tool where
residents can view more than 70,000 volunteer positions available annually.
Volunteers contribute more than 405,000 hours to City programs and services
each year. ·
Developed and implemented an annual survey of
residents to establish a regular feedback approach and provide Council with
better public input. ·
Developed a Talent Management Strategy for the
City. ·
Completed the Designation of Bilingual Positions
project by recording relevant data in the City’s System Application Process
(SAP) program and developing related material for managers and employees. ·
Increased the number of francophone recreation
activities by 31 per cent. ·
Improved the Transitway “Wayfinding” and mobile
Web services to simplify travel, and introduced a newly designed OC Transpo
website. ·
Conducted an employee survey and focus groups to
understand key employee concerns. ·
Established one-stop service for the development
review process. ·
Worked with the communities of
Hintonburg/Mechanicsville and Vars to develop neighbourhood plans as part of
the pilot Neighbourhood Planning Initiative. |
Sustainable
Finances Priority
|
·
Developed the Fiscal Framework. ·
Identified a rate of inflation tax increase for
City services as a principle. ·
Introduced a dedicated two per cent Capital Tax
Levy to begin addressing the funding gap. ·
Introduced a new process, in conjunction with
Public Works and Government Services Canada, to negotiate and resolve
valuation of federal properties under dispute. This combined effort resulted
in the City receiving an additional $5.6 million in payment in lieu of
revenue. ·
Implemented a new budget development and reporting
process. ·
On track to eliminate unsustainable one-time
funding sources in the budget. ·
Developed a Commodity Price Hedging Policy to
ensure budget stability. ·
Made progress to attain a 50 per cent revenue-cost
ratio between transit users and taxpayers for transit operations. ·
Introduced market research and mystery shopping to
assess customer satisfaction. |