3.         Waiver to the use and care OF ROADS by-law 2003-498 - 1357 baseline road

 

             EXEMPTION AU RÈGLEMENT 2003-498 SUR L’ENTRETIEN ET L’UTILISATION DES ROUTES – 1357, CHEMIN BASELINE

 

 

Committee Recommendation

 

That Council approve the waiver of Section 3(1)(q) of the Use and Care of Roads By-Law 2003-498 for 1357 Baseline Road.

 

 

Recommandation DU Comité

 

Que le Conseil approuve l’exemption de l’alinéa 3(1)(q) du Règlement 2003-498 sur l’entretien et l’utilisation des routes pour le 1357, chemin Baseline.

 

 

 

 

 

 

 

 

 

 

Documentation

 

1.         Deputy City Manager’s Report, Infrastructure Services and Community Sustainability dated 4 November 2010 (ACS2010-ICS-PGM-0212).


Report to/Rapport au :

 

Transportation Committee

Comité des transports

 

and Council / et au Conseil

 

04 November 2010/ le 04 novembre 2010

 

Submitted by/Soumis par : Nancy Schepers, Deputy City Manager, Directrice municipale adjointe, Infrastructure Services and Community Sustainability, Services d'infrastructure et Viabilité des collectivités

 

Contact Person/Personne-ressource : Derrick Moodie, Acting Manager/Gestionnaire intérimaire, Development Review-Suburban Services/Examen des projets d'aménagement-Services suburbains, Planning and Growth Management/Urbanisme et Gestion de la croissance

(613) 580-2424, 15134  Derrick.Moodie@ottawa.ca

 

River/Rivière (16)

Ref N°: ACS2010-ICS-PGM-0212

 

 

SUBJECT:

Waiver to the use and care OF ROADS by-law 2003-498 - 1357 baseline road

 

 

OBJET :

EXEMPTION AU RÈGLEMENT 2003-498 SUR L’ENTRETIEN ET L’UTILISATION DES ROUTES – 1357, CHEMIN BASELINE

 

 

REPORT RECOMMENDATION

 

That the Transportation Committee recommend Council approve the waiver of Section 3(1)(q) of the Use and Care of Roads By-Law 2003-498 for 1357 Baseline Road.

 

RECOMMANDATION DU RAPPORT

 

Que le Comité des transports recommande au Conseil d’approuver l’exemption de l’alinéa 3(1)(q) du Règlement 2003-498 sur l’entretien et l’utilisation des routes pour le 1357, chemin Baseline.

 

 

BACKGROUND

 

The subject property is located at the northeast intersection of Baseline Road and Clyde Avenue.  The subject property is a corner lot with 271 metres of frontage along Baseline Road and 199 metres of frontage along Clyde Avenue.  The site is approximately 6.22 hectares in size and was most recently used for institutional purposes (Laurentian High School).  The subject property is designated Arterial Mainstreet in the Official Plan.

 

The applicant is proposing to develop the site as a mixed-use commercial and retail center focused on a stand-alone single large format retail store located in the northeast quadrant of the site with the remainder of the site framed with buildings fronting along Baseline Road and Clyde Avenue as shown on Document 3. 

 

The first phase of construction includes a 9200 square metre stand-alone single-use retail store in the northeast quadrant of the site along with two buildings fronting Baseline Road as shown on Document 2.  The proposed buildings fronting along Baseline Road will be a minimum of seven metres in height, consisting of a gross floor area of 945 square metres and 915 square metres respectively. 

 

With respect to the placement of buildings on the site, the Arterial Mainstreet “AM[1711] S248, 249” zoning requires that any building located within 20 metres of Baseline Road and Clyde Avenue must provide a setback of six metres between the curb of any widened right-of-way along Baseline Road and Clyde Avenue and may not be setback more than a maximum of seven metres from the street edge lot line.  This performance standard is crucial in allowing for the creation of a pedestrian friendly environment with ample room for landscaping, queuing space for transit users and everyday pedestrian circulation.  The site-specific performance standard also takes into consideration the ultimate right-of-way requirements for Baseline Road and Clyde Avenue to ensure the implementation of this design element.

 

DISCUSSION

 

The proposed buildings fronting along Baseline Road and Clyde Avenue as shown on Document 3 require a waiver to Section 3(1)(q) of the Use and Care of Roads By-law 2003-498.  Section 3(1)(q) of the By-law does not permit the placement of any gate or door so that the gate or door that would open or swing outward over any part of a sidewalk or highway.  The intent of the by-law provision is to discourage any potential conflicts within either the current or future right-of-way.  This provision is also intended to ensure that pedestrians entering and exiting a building would have sufficient room to manoeuver without blocking or impeding through traffic along the sidewalk.  Such a requirement is considered appropriate in a context where the built fabric is close to the street edge and the width of the sidewalk is narrow and is not likely to be widened significantly.  However, as the entire parcel at 1357 Baseline Road is being redeveloped, which takes into account the ultimate right-of-way and requires a significant minimum building setback from the street edge, a waiver to By-law 2003-498 would not impact the pedestrian environment envisioned for the property and is considered appropriate in this circumstance. 

 

In summary, staff support the waiver of Section 3(1)(q) of the Use and Care of Roads By-law 2003-498 as it pertains to any building fronting along Baseline Road and Clyde Avenue that is located on the subject property.

 


CONSULTATION

 

By way of the related application for Site Plan Control, file D07-12-09-0193, the customary stakeholders have been notified and consulted.  Excluding any external stakeholders consulted in the planning process, no public consultation has taken place.  The Planning and Growth Management Department supports the proposed waiver for this development.  The Ward Councillor is aware of the application.

 

 

LEGAL/RISK MANAGEMENT IMPLICATIONS

 

There are no legal/risk management impediments to implementing the recommendation in this report.

 

 

FINANCIAL IMPLICATIONS

 

There are no financial implications as a result of the waiver.

 

 

SUPPORTING DOCUMENTATION

 

Document 1 – Key Plan

Document 2 – Phase One Site Plan

Document 3 – Development Concept Plan

 

 

DISPOSITION

 

Upon approval of the recommendation contained in this report, staff will inform the applicant of Council’s decision.

 

 

 


 

KEY PLAN                                                                                                             DOCUMENT 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


PHASE ONE SITE PLAN                                                                                    DOCUMENT 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



DEVELOPMENT CONCEPT PLAN                                                                 DOCUMENT 3