Current Roadwork and Street Closures


 
Transit service and fare discounts    Transit service and fare discounts »
Interactive Traffic Map  Interactive Traffic Map »
Seasonal Load Restrictions    Seasonal Load Restrictions »

Through this search tool you can access information on current road closures and detours due to construction and/or special events. Dates and times provided below may change due to weather conditions and other factors affecting construction. Although this list is intended to be comprehensive, unavoidable emergency closures and minor closures are not listed.

To begin, simply choose the appropriate search field or enter a keyword and "search". The option is also available to view all activities.

by Keyword:
by Date: between

and
by Traffic Impact:
by Activity Type:
by Ward:

All current projects:


All Activities

Found 120 Results.


Activity Location  Date Time  Project Impact and Description Ward
Special Event
NOKIA Sunday Bikedays  
Sir John A. MacDonald Parkway – Westbound lanes on the south side of the Ottawa River and west of downtown from Vimy Place (War Museum) to Carling Avenue Colonel By Drive – Both lanes located on the east side of the Rideau Canal from Laurier Bridge to Hogs Back Bridge Rockcliffe Parkway – Both lanes running along the south side of the Ottawa River just east of downtown from the Aviation Parkway to St. Joseph Boulevard (Orleans)   Sunday, May 15 to Monday, September 5, 2016
9 a.m. to 1 p.m. 
High
Lane closures. Parkways closed to motor vehicles every Sunday morning from Victoria Day weekend to Labour Day (May 21 to September 2) 
1, 2, 12, 14, 15, 17 
Special Event
Lebanese Fun Festival of Ottawa 
Dupont Street at Ridgewood Avenue  Wednesday, July 20 to Sunday, July 24, 2016
4 p.m. to 11 p.m. Wednesday, July 20, Thursday, July 21 and Friday, July 22; and, 11 a.m. to to 11 p.m., Saturday, July 23 and Sunday, July 24 
Low
Street closure in effect 
16 
Special Event
Ottawa National Capital Triathlon Championships  
Preston Street between Carling Avenue and Prince of Wales Drive, Prince of Wales Drive between Preston Street and to a point 900 metres north of Baseline Road/Heron Road, and Pretoria Bridge  Friday, July 22 to Sunday, July 24, 2016
Preston Street closed from 7 p.m., Friday, July 22 to 4 p.m. Sunday, July 24 2016; Prince of Wales Drive closed from 6 a.m. to 6:30 p.m., Saturday, July 23 and from 6 a.m. to 3 p.m., Sunday, July 24; and, Pretoria Bridge closed from 6 a.m. to 10 a.m., Saturday, July 23 and Sunday, July 24  
Medium
Road and bridge closures in effect. Pretoria Bridge – access for pedestrians/cyclists maintained at all times 
16 
Special Event
Clarence Street Festival 
Clarence Street between Dalhousie Street and William Street; and Clarence Street (northerly lane) between Parent Street and William Street  Saturday, July 23 to Sunday, July 24, 2016
7 a.m. to 11 p.m. 
Low
Street closures in effect 
12 
Special Event
GranFondo Ottawa Cycling Events 
Go to link for complete information on all routes   Saturday, July 23, 2016
7 a.m. to 4 p.m. 
Medium
Event restricted to named streets in routes listed 
4, 5 
Special Event
Ottawa Chinese Alliance Church – Annual Community Day  
Eccles Street between Bell Street North and Lebreton Street North  Saturday, July 23, 2016
8 a.m. to 5 p.m. 
Low
Street closure in effect 
14 
Special Event
International Busker Festival 
Metcalfe Street between Queen Street and Wellington Street, and O’Connor Street between Queen Street and Wellington Street   Thursday, July 28 to Monday, August 1, 2016
Thursday, July 28 and Friday, July 29 from 6 p.m. to midnight; Saturday, July 30 and Sunday, July 31 from 10 a.m. to midnight; and, Monday, August 1 from 10 a.m. to 8 p.m. 
Medium
Street closures in effect 
12, 14 
Special Event
National Capital Triathlon 
Hog's Back Road between Prince of Wales Drive and Riverside Drive  Saturday, July 30, 2016
6:30 a.m. to 4 p.m. 
Medium
Road closure in effect 
16 
Construction
Bridge culvert replacement 
Anderson Road between Leitrim Road and Piperville Road  Monday, July 25 to Friday, August 12, 2016
 
Low
Road closed. Signed detour to direct motorists around the closure 
20 
Construction
Road resurfacing 
Apolydor Avenue at Clementine Avenue intersection  Thursday, July 21 to Friday, August 12, 2016
 
Low
Lane reductions  
17 
Construction
Connection of new services 
Atlantis Avenue between Lanark Avenue and Workman Avenue  Monday, July 18 to Friday, July 22, 2016
 
Low
Street closure in effect 
15 
Construction
Road resurfacing 
Balmoral Place between Dead End west of Norwood Avenue and Dead End at Alta Vista Drive  Friday, July 22 to Monday, August 22, 2016
 
Low
Lane reductions  
18 
Construction
Queen Street Renewal project 
Bank Street southbound between Wellington Street and Albert Street   Saturday, June 4 to Monday, September 5, 2016
 
High
Bank Street southbound closed. Northbound reduced to one lane. Signed detour for vehicles and cyclists in place. Pedestrians directed to use an alternate crosswalk at Bank and Queen Street depending on the location of the current work. OC Transpo routes 1, 2, 7, 9 and 12 are detoured  
12, 14 
Construction
Culvert replacement, road rehabilitation and landscaping 
Bank Street and 200 metres south of Leitrim Road  Monday, June 13 to Friday, July 22, 2016
9 a.m. to 3:30 p.m. weekdays 
Medium
Off-peak lane reductions from four lanes to two weekdays. Signed detour in place 
20 
Construction
Staging of formwork for Richcraft Homes construction 
Bay Street between Nepean Street and Gloucester Street  Friday, October 16, 2015 to Friday, September 2, 2016
 
Low
Bike lane closed: single file signs posted, and east sidewalk closed: pedestrians directed to west sidewalk 
14 
Construction
Main Street reconstruction project 
Beckwith Road between Main Street and Marlowe Crescent  Monday, June 13 to Wednesday, August 31, 2016
 
Low
Road closed 
17 
Construction
Confederation Line Light Rail Project 
Booth Street between Albert Street and Sir John A. Macdonald Parkway  Sunday, December 21, 2014 to Monday, December 19, 2016
 
Medium
Road closed. Signed detour to direct motorists around the closure 
14 
Construction
Road rehabilitation 
Bridge Street between Manotick Main Street and River Road  Monday, July 4 to Friday, August 26, 2016
 
High
Intermittent lane reductions 
21 
Construction
Road rehabilitation 
Chamberlain Avenue between Kent Street and 8 metres west of Bank Street  Thursday, July 7 to Friday, July 22, 2016
 
High
Intermittent lane reductions 
17 
Construction
Rockcliffe Park Northwest Project (Phase 2) - road, sewer and watermain construction. 
Coltrin Road between Minto Place and Springfield Road   Thursday, May 12 to Friday, August 5, 2016
 
Low
Road closed 
13 
Construction
Rockcliffe Park Northwest Project (Phase 2) - road, sewer and watermain construction. 
Coltrin Place between Coltrin Road and Dead End  Thursday, June 23 to Friday, July 29, 2016
 
Low
Road closed 
13 
Construction
Road, sewer and watermain reconstruction 
Columbus Avenue between Sharp Street and Lola Street  Monday, May 16 to Friday, December 16, 2016
 
Low
Road closed 
13 
Construction
Installation of new watermain and sewer services  
Crichton Street between Keefer Street and Dufferin Road  Monday, July 11 to Friday, October 21, 2016
 
Low
Road closed. Signed detour to direct motorists around the closure 
13 
Construction
Expansion of the Ottawa Art Gallery and redevelopment of Arts Court project 
Daly Avenue between Nicholas Street and Waller Street  Saturday, July 4, 2015 to Tuesday, October 31, 2017
 
Low
Access to Ottawa Art Gallery and Arts Court remains open. Daly Avenue eastbound reduced to one lane. Sidewalk on the south side of roadway closed. Pedestrian detours posted  
12 
Construction
Bridge culvert replacement 
Downey Road between Mitch Owens Road and Rideau Road  Monday, July 11 to Friday, July 29, 2016
 
Low
Road closed. Signed detour to direct motorists around the closure 
20 
Construction
Road resurfacing 
Dunning Road between Wilhaven Road and Old Montreal Road  Monday, June 13 to Friday, July 29, 2016
 
Low
Lane reductions  
19 
Construction
NAC Renovation project 
Elgin Street between Albert Street and Queen Street  Saturday, May 7 to Friday, September 30, 2016
 
High
Elgin northbound reduced from three to two lanes (through and left) between Albert and Queen. Sidewalk on east side of Elgin closed between Albert and Queen. Crosswalk between south side of Queen to Elgin closed.  
14 
Construction
The Lebreton Flats Diversion Chamber and Albert Street Reconstruction 
Empress Avenue between Albert Street and Dead End  Monday, May 9 to Monday, September 19, 2016
 
Low
Road closed 
14 
Construction
Completion of concrete sidewalk reconstruction 
Evelyn Avenue between Main Street and Rosemere Avenue  Thursday, July 14 to Friday, July 22, 2016
 
Low
Road closed 
17 
Construction
Road, sewer and watermain construction 
Florence Street between Bay Street and Kent Street; and, Lyon Street North between James Street and Gladstone Avenue  Tuesday, August 16 to Friday, October 7, 2016
 
Low
Road closed 
14 
Construction
Structural Rehabilitation project 
George McIllraith Bridge between Riverside Drive and Rideau River  Wednesday, July 8, 2015 to Saturday, December 31, 2016
 
High
Reduced to one lane in each direction  
17 
Construction
Gilmour Street Trunk Sewer Reconstruction 
Gilmour Street between Elgin Street and the Driveway  Tuesday, May 10 to Saturday, November 19, 2016
 
Low
Road closed 
14 
Construction
Road, sewer and watermain construction 
Gladstone Avenue between Bay Street and Kent Street  Tuesday, August 2 to Monday, August 15, 2016
 
Low
Road closed 
14 
Construction
Complete concrete sidewalk reconstruction 
Graham Avenue between Main Street and Echo Drive  Monday, July 25 to Friday, August 5, 2016
6 a.m., Monday, July 25 to 9 p.m., Friday, August 5  
Low
Road closed 
17 
Construction
Greenbank Road widening - sewer and watermain reconstruction including railway underpass  
Greenbank Road between Malvern/Foxfield Drive and Marketplace Avenue   Wednesday, April 1, 2015 to Friday, July 28, 2017
 
Medium
Lane reductions. Two lanes of Greenbank Road that run beneath the Via Rail overpass are now open to traffic from Malvern Drive to Wessex/Berrigan as of Friday, July 22. 
3 
Construction
Complete concrete sidewalk reconstruction 
Hawthorne Avenue between Main Street and Concord Avenue  Monday, July 25 to Friday, August 5, 2016
6 a.m., Monday, July 25 to 9 p.m., Friday, August 5  
Low
Road closed 
17 
Construction
Complete concrete sidewalk reconstruction 
Hazel Street between Main Street and Glenora Avenue  Monday, July 18 to Tuesday, July 26, 2016
 
Low
Road closed 
17 
Construction
Confederation Line Light Rail Project 
Highway 417 westbound east of the Split to Highway 174 eastbound   Sunday, June 28, 2015 to Thursday, May 31, 2018
 
High
Ramp closed. Motorists are encouraged to use Innes Road as a detour 
11 
Construction
2014 CIPP Sewer Lining Program 
Hinton Avenue between Wellington Street and Tyndall Street  Friday, July 15 to Saturday, July 30, 2016
 
Low
Road closed 
15 
Construction
Confederation Line Light Rail Project 
Hurdman Station Multi-use pathways  Friday, October 23, 2015 to Monday, January 8, 2018
 
Low
Closures in effect 
17 
Construction
Watermain replacement 
Industrial Avenue between St. Laurent Boulevard and just west of Russell Road; and, Russell Road between Industrial Avenue and Coronation Avenue  Monday, July 25 to Monday, September 5, 2016
 
High
Lane closures. Reduced to one lane at all times. One sidewalk will be maintained for pedestrians at all times. OC Transpo routes 94, 95, 114 and 121 will continue to run on Industrial Avenue but will sometimes operate from a temporary stop when the permanent stop is within the active work area. For more information, please go to octranspo.com. 
18 
Construction
Anderson Bridge Rehabilitation Project 
John Shaw Road between Grants Side Road and Kinburn Side Road  Monday, July 4 to Tuesday, September 27, 2016
 
Low
Road closed 
5 
Construction
Kanata West Pump Station and Force Main Construction 
Katimavik Road between Terry Fox Drive and Davis Avenue/Curran Street  Monday, July 4 to Friday, July 22, 2016
 
High
Road closed 
23 
Construction
Building of 3-metre wide multi-use pathway, repaving and culvert extension 
Klondike Road between March Road and Sandhill Road  Monday, June 20 to Thursday, September 29, 2016
9 a.m. to 3:30 p.m. weekdays 
Low
Off-peak lane reductions on Klondike Road 
4 
Construction
Road resurfacing 
Lancaster Road between St. Laurent Boulevard and Walkley Road  Wednesday, August 3 to Friday, September 16, 2016
 
Low
Off-peak lane reductions   
18 
Construction
Left turn from eastbound Laurier Avenue to King Avenue northbound  
Laurier Avenue at King Edward Avenue  Sunday, April 24, 2016 to Thursday, May 31, 2018
 
High
Left turn from eastbound Laurier Avenue to King Avenue northbound no longer permitted 
12 
Construction
Road resurfacing 
Leeds Avenue between Sheffield Road East and Dead End  Monday, July 18 to Friday, August 12, 2016
 
Low
Lane reductions  
18 
Construction
Confederation Line Light Rail Project 
Lees Avenue on-ramp (Eastbound)  Thursday, June 13, 2013 to Thursday, May 31, 2018
 
High
On-ramp closed – signage in place 
11 
Construction
Bridge Rehabilitation 
Leitrim Road between Farmers Way and Foubert Court  Monday, May 2 to Tuesday, October 25, 2016
 
Low
Bridge closed - signed detours in place 
19 
Construction
Road resurfacing 
Lester Road between 100 metres west of Alert Road and Bank Street  Tuesday, July 26 to Thursday, August 11, 2016
 
Low
Off-peak lane reductions   
10 
Construction
Road rehabilitation 
Loggers Way between Galetta Side Road and Mississippi Road  Tuesday, July 5 to Monday, July 18, 2016
 
Low
Intermittent lane reductions 
5 
Construction
The Lebreton Flats Diversion Chamber and Albert Street Reconstruction 
Lorne Avenue between Albert Street and Primrose Avenue  Tuesday, May 3 to Friday, September 16, 2016
 
Low
Street closed. However, during the closure Lorne Avenue is converted to permit two-way traffic 
14 
Construction
Installation of new watermain/sewer services and road reconstruction  
Lyman Street between Kirkwood Avenue and Hilson Avenue  Monday, July 4 to Friday, October 28, 2016
 
Low
Road closed 
15 
Construction
Confederation Line Light Rail Project 
Lyon Street North between Sparks Street and Albert Street; and Queen Street between Bay Street and Kent Street  Monday, July 13, 2015 to Monday, July 31, 2017
 
Medium
Lyon Street reduced to two southbound lanes. Lane reductions on Queen Street in effect  
14 
Construction
General maintenance inspections on the Memorial Arch. 
Lyon Street between Wellington Street Queen Street  Friday, July 31, 2015 to Thursday, August 3, 2017
7 a.m. to 5:30 p.m. and 8:30 p.m. to 12:30 a.m. 
Medium
Intermittent lane reductions 
14 
Construction
Sewer and road rehabilitation  
Intersection of Lyon Street and McLeod Street   Monday, June 13 to Wednesday, August 17, 2016
 
Medium
Intersection closed. Signed detour in place 
14 
Construction
Road, sewer and watermain construction 
Lyon Street between Flora Street and Gladstone Avenue  Monday, June 13 to Friday, September 16, 2016
 
Low
Road closed 
14 
Construction
Installation of scaffolding at West Memorial Building 
Lyon Street between Wellington Street and Sparks Street  Monday, July 18 to Wednesday, September 14, 2016
 
Low
Road closure in effect in northbound direction only 
14 
Construction
Integrated Municipal Road Reconstruction 
MacFarlane Avenue between Sherwood Drive and Kenilworth Street  Monday, April 18 to Friday, August 12, 2016
 
Low
Road closure in effect 
15 
Construction
Bridge rehabilitation 
Mackenzie King Bridge between Elgin Street and Waller Street   Monday, May 9 to Monday, August 1, 2016
 
Medium
Periodic lane reductions in each direction 
12 
Construction
Road rehabilitation 
MacKenzie Avenue between Murray Street and Wellington Street   Saturday, May 30, 2015 to Wednesday, November 30, 2016
 
Medium
MacKenzie Avenue reduced to two lane between 7 a.m. to 9 a.m., and 3:30 p.m. to 5:30 p.m. Reduced to one lane at all other times. Medium impact for cyclists and pedestrians  
12 
Construction
Main Street reconstruction project 
Main Street northbound between Clegg Street and Lees Avenue  Monday, May 25, 2015 to Monday, August 29, 2016
 
High
Northbound lanes closed  
17 
Construction
Main Street reconstruction project 
Main Street northbound between Clegg Street and Hazel Street  Monday, April 4 to Thursday, December 1, 2016
 
High
Northbound lanes closed. Signage in place 
17 
Construction
Main Street reconstruction project 
Main Street northbound between Hawthorne Avenue and Harvey Street  Thursday, April 7 to Monday, August 15, 2016
 
High
Northbound lanes closed. Signage in place 
17 
Construction
Main Street reconstruction project 
Main Street northbound between Hawthorne Avenue and Hazel Street  Monday, April 18 to Monday, August 15, 2016
 
High
Northbound lanes closed. Signage in place 
17 
Construction
Main Street reconstruction project 
Main Street northbound between Clegg Street and Riverdale Avenue  Monday, May 2 to Wednesday, November 2, 2016
 
High
Northbound lanes closed. Signage in place 
17 
Construction
Main Street reconstruction project 
Main Street northbound between Riverdale Avenue and Lees Avenue  Monday, May 2 to Wednesday, November 2, 2016
 
High
Northbound lanes closed. Signage in place 
17 
Construction
Complete concrete sidewalk reconstruction 
Main Street between Hawthorne Street and Lees Avenue  Monday, July 25 to Friday, August 5, 2016
6 a.m., Monday, July 25 to 9 p.m., Friday, August 5  
Medium
Road closed. Signed detour in place  
17 
Construction
Kanata West Pump Station and Force Main Construction 
Maple Grove Road between Terry Fox Drive and Silver Seven Road  Wednesday, July 20 to Friday, September 2, 2016
9 a.m., Wednesday, July 20 to 1 p.m., Friday, September 2 
Medium
Road closed 
23 
Construction
Kanata West Pump Station and Force Main Construction 
McGibbon Drive between Katimavik Road and Robarts Crescent  Monday, June 20 to Friday, July 29, 2016
 
Low
Road closed 
23 
Construction
Rehabilitation of McIlraith Bridge - jacking of bridge structure  
Mcllraith Bridge (Main Street/Smyth Road) between Riverdale Drive and Riverside Drive  Wednesday, July 20 to Friday, July 22, 2016
8 p.m. to 6 a. m. 
Low
Road closures of short durations for up to 10 minutes per occurrence. Traffic control persons on site to control traffic. 
16 
Construction
Road, sewer and watermain construction 
McLeod Street between Kent Street and Bay Street  Monday, June 13 to Friday, September 16, 2016
 
Low
Road closed 
14 
Construction
Sewer and watermain reconstruction 
Meath Street between Carling Avenue and Thames Street  Monday, June 13 to Tuesday, September 6, 2016
 
Low
Road closed 
16 
Construction
Road resurfacing 
Mer Bleue Road between 120 metres north of Renaud Road and 470 metres south of Renaud Road  Monday, July 4 to Friday, July 29, 2016
 
Low
Off-peak lane reductions  
2 
Construction
Façade rehabilitation 
Metcalfe Street at Sparks Street  Monday, March 14, 2016 to Tuesday, October 31, 2017
 
Medium
Metcalfe reduced to one lane 
14 
Construction
Phase 3 of emergency culvert replacement  
Monterey Drive between Guthrie Street and Abingdon Drive  Monday, July 11 to Friday, August 5, 2016
 
Low
Road closed. Signed detour in place 
8 
Construction
Road resurfacing 
Montreal Road between 100 metres east of Beckenham Lane and Ogilvie Road  Monday, July 4 to Friday, August 5, 2016
 
Medium
Alternating off-peak lane reductions  
11 
Construction
Installation of new watermain/sewer services and road reconstruction  
Mulvihill Avenue between Kirkwood Avenue and Hilson Avenue  Monday, July 4 to Friday, October 28, 2016
 
Low
Road closed 
15 
Construction
Rideau Centre Expansion and Rideau Street renewal; undertaking road modifications to construct a pedestrian plaza which will then permanently close this section of road 
Nicholas Street between Rideau Street and Besserer Street   Monday, April 4 to Sunday, July 31, 2016
 
Low
Road closed. This block of Nicholas will be permanently closed to vehicular traffic  
12 
Construction
Final phase East Transit Detour 
Nicholas Street between Laurier Avenue and Hwy. 417  Sunday, April 24, 2016 to Thursday, May 31, 2018
 
High
Nicholas Street will be reduced to one general traffic lane northbound and will be marked with a northbound reserved bus lane between Highway 417 and Laurier Avenue. Buses will also use Nicholas Street in the southbound direction in either of the two traffic lanes, with a reserved bus lane beginning at the 417 Eastbound on-Ramp. Motorists should plan out alternate routes in advance and encouraged to avoid the area if possible.  
12 
Construction
Completion of concrete sidewalk reconstruction 
Oblate Avenue just east of Main Street  Thursday, July 14 to Friday, July 22, 2016
 
Low
Road closed 
17 
Construction
Confederation Line Light Rail Project 
O’Connor Street between Wellington Street and Queen Street, and intersection of O’Connor Street and Queen Street   Monday, November 9, 2015 to Tuesday, February 28, 2017
 
High
Lane and intersection reductions in effect. One lane on O’Connor Street will remain open to motorists and cyclists at all times. One sidewalk will remain open to pedestrians at all times, but there may be intermittent closures on the east side. Please follow signed detours 
12, 14 
Construction
O’Connor Street Bikeway construction 
O'Connor Street between Laurier Avenue and Fifth Avenue  Monday, June 6 to Wednesday, November 30, 2016
 
Medium
Off-peak lane reductions  
14, 17 
Construction
Culvert replacements  
Old Almonte Road between Corkery Road and Upper Dwyer Hill Road  Monday, July 11 to Friday, July 22, 2016
 
Low
Road closed 
5 
Construction
Road resurfacing 
Old Innes Road/Sheffield Road between West Dead End and 320 metres south of Leeds Avenue  Monday, August 8 to Friday, September 30, 2016
 
Low
Lane reductions 
18 
Construction
Road surface treatment 
Old Stagecoach Road between Stagecoach Road and Dalmeny Road   Monday, June 6 to Wednesday, August 31, 2016
 
Low
Lane reductions 
20 
Construction
Road resurfacing 
Old St. Laurent Boulevard between Joliffe Street and Foley Avenue  Wednesday, August 3 to Friday, September 30, 2016
 
Low
Off-peak lane reductions 
18 
Construction
Integrated Municipal Road Reconstruction 
Orrin Avenue between MacFarlane Avenue and Reid Avenue  Monday, April 18 to Friday, August 12, 2016
 
Low
Road closure in effect 
15 
Construction
Brian Coburn Boulevard Extension 
Pagé Road between Montpelier Place and Trailsedge Way  Thursday, July 7 to Monday, July 18, 2016
 
High
Pagé Road between Montpelier Place and Trailsedge Way to be permanently closed as of Monday, July 18. Signed detour to direct motorists around the closure 
1, 2, 19 
Construction
Bridge Culvert Replacement 
Parkway Road Eastbound between Meadow Drive and Bank Street  Tuesday, August 2 to Friday, August 19, 2016
 
Low
Eastbound lane closed only. Signed detour to direct motorists around the closure 
20 
Construction
Lebreton Flats Diversion Chamber and Albert Street Reconstruction 
Perkins Street between Albert Street and Dead End  Tuesday, May 31 to Friday, September 30, 2016
 
Low
Road closure in effect 
14 
Construction
Facilitating maintenance of adjacent building  
Queen Street between Metcalfe Street and O'Connor Street  Monday, July 6, 2015 to Friday, June 2, 2017
 
Low
Lane reductions in effect  
14 
Construction
O-Train Confederation Line Light Rail (LRT) Transit project - construction for future Lyon Station 
Queen Street at Lyon Street  Monday, July 6, 2015 to Saturday, July 29, 2017
 
High
Following lane reductions in effect: • Lane reductions along Lyon Street between Sparks Street and Albert Street • Lyon Street bike lane is removed from Sparks to Albert streets for the duration of Lyon Station west entrance construction  
14 
Construction
Queen Street rehabilitation project 
Queen Street between Bay Street and Metcalfe Street  Sunday, April 24, 2016 to Wednesday, January 31, 2018
 
Medium
Queen Street reduced to one eastbound lane (changed to one-way). Westbound traffic is no longer permitted. A signed detour is in place to direct westbound motorists to Albert Street 
14 
Construction
Road resurfacing 
Ramsayville Road between Leitrim Road and Mitch Owens Road  Monday, June 13 to Friday, July 22, 2016
 
Low
Lane reductions  
20 
Construction
Bridge Culvert Replacement 
Ramsayville Road between Leitrim Road and Whyte Side Road  Monday, July 4 to Friday, July 22, 2016
 
Low
Road closed. Signed detour to direct motorists around the closure 
10 
Construction
Integrated Municipal Road Reconstruction 
Reid Avenue between Sherwood Drive and Kenilworth Street   Monday, April 18 to Friday, August 12, 2016
 
Low
Road closure in effect 
15 
Construction
Installation services along Renaud Road 
Renaud Road between Mer Bleue Road and Navan Road  Monday, July 18 to Friday, July 29, 2016
 
Low
Road closed. Signage in place 
2 
Construction
Confederation Line Light Rail Project 
Rideau Street between Sussex Drive and Dalhousie Street  Friday, August 28, 2015 to Thursday, May 31, 2018
 
High
Traffic restrictions in effect. One lane in each direction open for exempt vehicles: OC Transpo and STO buses, taxis, delivery vehicles and light rail transit construction vehicles. Motorists and cyclists detoured with detour signage in place.  
12 
Construction
Installation of new watermain and sewer services  
River Lane between Keefer Street and Dufferin Road  Monday, July 11 to Friday, October 21, 2016
 
Low
Road closed. Signed detour to direct motorists around the closure 
13 
Construction
Road resurfacing 
River Road between Mitch Owens Road and Leitrim Road  Tuesday, July 12 to Friday, September 2, 2016
 
Medium
Off-peak lane reductions north of Earl Armstrong Road /lane reductions south of Earl Armstrong Road 
20, 22 
Construction
Road resurfacing 
Riverside Drive on and off ramps between Riverside Drive and Bronson Avenue  Tuesday, August 2 to Monday, August 22, 2016
 
Low
Off-peak lane reductions 
17 
Construction
Installation of new watermain and services  
Rosebella Avenue between Mavis Street and Bank Street; and, Rosebella Avenue between Eighth Street and Conroy Road  Monday, July 4 to Thursday, September 1, 2016
 
Low
Road closed. Signed detour to direct motorists around the closure 
10 
Construction
2016 Preservation Program East 
Russell Road between Rockdale Road and Saumure Road   Friday, July 15 to Friday, July 29, 2016
 
Low
Lane reductions  
20 
Construction
Confederation Line Light Rail Project 
Scott Street/Albert Street between Smirle Avenue and Empress Avenue   Monday, July 6, 2015 to Wednesday, May 30, 2018
 
Medium
Long term lane reductions to accommodate new bus only lanes, Scott Street and Albert Street have been reduced to one eastbound lane and one westbound lane at all times  
15 
Construction
Integrated road, sewer and watermain reconstruction 
Sherry Lane Avenue between Brent Avenue and Majestic Drive  Monday, April 25 to Friday, August 19, 2016
 
Low
Road closed 
9 
Construction
Road resurfacing 
Snake Island Road between Stagecoach Road and Bank Street  Thursday, June 16 to Friday, July 29, 2016
 
Low
Lane reductions  
20 
Construction
Integrated Municipal road reconstruction 
Spencer Street between Holland Avenue and Western Avenue  Thursday, May 26 to Wednesday, November 30, 2016
 
Low
Road closed 
15 
Construction
Installation of new sanitary, storm and watermain 
Spratt Road between Poplin Street and Rideau Road  Monday, April 18 to Monday, August 8, 2016
 
Low
Road closed 
22 
Construction
Road resurfacing 
Springhill Road between 50 metres west of Bank Street and Yorks Corner Road  Monday, June 6 to Friday, July 29, 2016
 
Low
Lane reductions  
20 
Construction
Renewal of the Stagecoach Allan Municipal Drain Culvert Repair 
Stagecoach Road between Dalmeny Road and Belmeade Road  Monday, July 18 to Friday, August 12, 2016
 
Low
Road closed. Signage in place 
20 
Construction
Rain garden construction 
Stewart Street between Friel Street and King Edward Avenue  Wednesday, July 13 to Friday, August 5, 2016
 
Low
Road closed. Signed detour to direct motorists around closure 
12 
Construction
Road resurfacing 
Tenth Line Road northbound lanes between St. Joseph Boulevard and 110 metres south of St. Joseph Boulevard  Monday, July 25 to Friday, August 12, 2016
 
Low
Off-peak lane reductions  
1 
Construction
Innovation Station and Park and Ride Facility Construction Project 
Terry Fox Drive (west of Innovation Drive)/Terry Fox Intersection; Innovation Drive between Terry Fox Drive and Goulbourn Forced Road; Goulbourn Forced Road (west of Innovation Drive)  Monday, April 25 to Saturday, December 31, 2016
9 a.m. to 3:30 p.m. 
Low
Road closed 
4 
Construction
Installation of new services at Séraphin – Marion Private 
Transitway/Waller Street between Laurier Avenue and Nicholas Street  Friday, July 22 to Sunday, July 24, 2016
7 p.m., Friday, July 22 to 10 p.m., Sunday, July 24 
Low
Road closed 
12 
Construction
Rehabilitation of Minto Bridges East and Centre 
Union Street between Minto Bridge Centre and Stanley Avenue  Monday, December 16, 2013 to Saturday, December 31, 2016
 
Low
Bridge closed - signed detours in place 
12, 13 
Construction
Confederation Line Light Rail Project 
Waller Street between Laurier Avenue East and Nicholas Street  Friday, July 26, 2013 to Thursday, May 31, 2018
 
Low
Road closed 
12 
Construction
Expansion of the Ottawa Art Gallery and redevelopment of Arts Court project 
Waller Street between Daly Avenue and MacKenzie King Bridge  Saturday, July 4, 2015 to Tuesday, October 31, 2017
 
Low
Access to Ottawa Art Gallery and Arts Court remains open. Daly Avenue eastbound reduced to one lane. Sidewalk on the west side of roadway closed. Pedestrian detours posted  
12 
Construction
Facilitating building repair 
Wellington Street between Kent Street and Bank Street  Tuesday, April 19, 2016 to Thursday, May 10, 2018
 
Low
Sidewalk on south side closed 
14 
Construction
Watermain, sewers and road rehabilitation 
Woodcrest Road between Kilborn Avenue and Kilborn Avenue  Monday, April 11 to Friday, October 14, 2016
 
Low
Road closed 
18 

[ top ]

For more information

City of Ottawa

  • Construction projects and local traffic issues: 3-1-1 (TTY: 613-580-2401)
  • Public transit alternatives: 613-741-4390 (TTY: 613-741-5280)
  • For information on future construction projects, view a list of construction projects by ward.

Province of Ontario

National Capital Commission

[ top ]