Foster Ditch Consolidated Modelling

If you require further translations on the attached .pdf, please contact Mark McMillan (613) 580-2424 ext 16008

One of the design objectives of the proposed facility is to ensure that it does not raise water levels in the upstream storm water conveyance system.  Consequently the design work requires a hydrologic and hydraulic model of the baseline condition for the system, so that the impact of the facility on water levels can be assessed.  The intent of the work documented in this report was to consolidate the previous models, fill data gaps as necessary, and use this information to prepare and evaluate a baseline hydrologic/hydraulic model for the entire system, which can then be used in the design of the proposed Foster SMF.

Foster Ditch Consolidated Modelling - Report [ PDF - 910 KB ]

Foster Stormwater Management Facility Environmental Study Report

If you require further translations on the attached .pdfs, please contact Mark McMillan (613) 580-2424 ext 16008

The Environmental Study Report is an element of the Municipal Class Environmental Assessment - Schedule C projects. A Public Open House for the project was held on June 19, 2013. The ESR will be placed on public record for a period of at least 30 calendar days after review and approval by the City of Ottawa Environment Committee and Council. 

Foster Stormwater Management Facility Environmental Study Report [ PDF - 3.3 MB ]