Foster Stormwater Management Facility

Overview

Project Description

 The present Foster Pond Stormwater Management Pond does not meet criteria established by the regulatory agencies.  As such, the Foster Storm Water Management Pond will be reconstructed in a new location. An Environmental Assessment process established that the most suitable location is on the Casey (4235 McKenna Casey Drive) and Hill property near Strandherd Drive and McKenna Casey Drive.

An Environmental Assessment was completed and approved by council in October 2013 and budget approved for the construction of a new Foster Stormwater Management Facility.

Foster Stormwater Management Facility Environmental Assessment Study Report ( PDF - 3.3 MB ) 

Timelines

July 2015 – start of construction

Spring 2016 – substantial completion

Budget

 $ 4,000,000.00

For more information

Mark McMillan, C.E.T.,
Project Manager
Design and Construction – Municipal (West)
City of Ottawa, 100 Constellation Crescent
Ottawa, ON K2G 6J8 

Brian Graham, P. Eng.
Project Manager
CH2M Hill Canada Limited
330-1101 Prince of Wales Drive
Ottawa, ON K2C 3W7
Tel:  613-723-8700 ext 73113

Notice of Completion

The City of Ottawa has completed a Class Environmental Assessment (Class EA) study for the Foster Stormwater Management Facility. This study serves to address significant development and urbanization in the South Nepean Urban Area area by constructing a replacement for the existing Foster Stormwater Management Facility. The study follows recommendations from previously completed studies that addressed both Master Servicing and Subwatershed Planning for the area.

Consultation, in the form of technical advisory committee meetings and two public open houses were incorporated as part of the Class EA process and are documented in the Environmental Study Report.

The Foster Stormwater Management Facility Environmental Study Report details the study process, findings and recommendations. The public is invited to review the report, available at the following locations:

Nepean Centrepointe Library
101 Centrepointe Drive
Ottawa, ON K2G 5K7
Tel.: 613-580-2710

Ruth E. Dickinson Library (Barrhaven)
100 Malvern Drive
Ottawa, ON K2J 2G5
Tel.: 613-580-2796

For further information, or to provide written comments, please contact:

Mark McMillan, C.E.T.
Project Manager
Infrastructure Services Department
Design and Construction – Municipal (West) Branch
City of Ottawa
100 Constellation Crescent
Ottawa, Ontario K2G 6J8
Tel: 613-580-2424 Ext. 16008
E-mail:mark.mcmillan@ottawa.ca

Written comments must be provided within thirty calendar days from the date of the first issuance of this Notice. If concerns regarding the project cannot be resolved through discussion with the City, a person/party may request that the Minister of the Environment make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order). Requests must be received by the Minister at the address below by December 16, 2013. A copy of this request must also be sent to the City of Ottawa Project Manager, Mark McMillan at the above address. With the exception of personal information, all comments will become part of the public record. If there are no requests received by December 16, 2013, the project will proceed to design and construction as presented in the Class EA study.

The Honourable Jim Bradley
Minister of the Environment
135 St. Clair Avenue West, 12th Floor
Toronto, Ontario M4V 1P5
Tel.: 416-314-6790 Fax: 416-314-7337 Toll Free: 1-800-565-4923

This notice first issued November 14, 2013

Environmental Assessment, Preliminary and Detailed Design

The South Nepean Urban Area has been undergoing significant development and urbanization since the mid 1990’s. To plan for this, the former City of Nepean and the new City of Ottawa have undertaken planning studies to address how the subwatershed will be managed. Two studies completed that addressed both Master Servicing and Subwatershed Planning were the South Nepean Urban Area – Master Servicing Study ESR and the Jock River Reach One Subwatershed Study. Both of these studies recommended a stormwater management plan to address both the existing and future lands in the South Nepean Urban Area.

The Subwatershed Study set out stormwater management design criteria for lands north of the Jock River that include:

  • Quantity control storage as required to meet constraints within existing channels and/or at existing crossings.
  • Erosion control storage as required to maintain stability and geomorphic function of the existing tributaries, as determined through further detailed study.
  • Quality control storage as per the Ministry of Environment Enhanced Treatment (80% TSS removal).
  • All stormwater management facility outlets will be designed to augment low flows to the extent possible.

The subwatershed study recommended a preferred stormwater management plan for the Foster Ditch Catchment Area. The Stormwater Management Plan for these lands recommended the following:

  • North of Maravista, to service the undeveloped lands north of Maravista and existing developments east of Cedarview Road – provide a centralized SWM facility consisting of a wet pond and an additional area of fish habitat to compensate for loss of habitat due to proposed partial enclosure/alignment of the Foster Ditch.
  • North of McKenna Casey and South of Maravista, to service the area north of McKenna Casey Drive between Cedarview and Strandherd not serviced by the Maravista SWM Pond and the area not serviced by the O’Keefe Pond – provide a centralized off-line stormwater facility located south of McKenna Casey Drive. Existing Foster Pond located at mouth of Foster Ditch to be decommissioned and temporary SWM pond (north of railway on parkland) to be removed.

This project will deal specifically with the Environmental Assessment, Preliminary and Detail Design of the Foster Ditch Catchment (South of Maravista only).

For further information about this project please contact:

Mark McMillan, C.E.T.
Project Manager
Design and Construction - Municipal (West)
100 Constellation Crescent
Ottawa, ON K2G 6J8
Tel:  613-580-2424 ext 16008

Brian Graham, P.Eng.
Senior Project Manager
CH2M Hill Canada Limited
330-1101 Prince of Wales Drive
Ottawa, ON K2C 3W7
Tel:  613-723-8700 ext 73113