The City of Ottawa invites you to attend a Public Information Session to discuss a watermain construction project planned in your neighbourhood.

Why: The City will be replacing sections of watermain on St. Joseph Boulevard as well as replacement of concrete curb and sidewalk on the south side St. Joseph Boulevard between St. Jean Street and Belcourt Blvd. and between Edgar Brault Street and 70m west of Place d’Orléans Drive.

What: The watermain construction work will require removal and replacement of underground pipes. There will be minimal disruption to existing water services to residents living north and south of St. Joseph Boulevard. The concrete curb and sidewalk replacement will be constructed along the south side of St. Joseph Boulevard with minor driveway closures to entrances.

Where: Watermain construction will occur on St. Joseph Boulevard from St. Pierre Street to Place d’Orléans Drive. The curb and sidewalk replacement will occur on the south side St. Joseph Boulevard between St. Jean Street and Belcourt Blvd. and between Edgar Brault Street and 70m west of Place d’Orléans Drive.

When: Construction is scheduled to begin in the summer of 2017 and end in the late fall of 2017.

At the Public Information Session, residents are able to drop in during the hours noted above and review the construction plans for the entire project. Representatives from the City and the design consultant will be available to discuss the project and to answer your questions.

Accessibility is an important consideration for the City of Ottawa. If you require special accommodation, please contact the undersigned.

For further information about this project and/or to submit comments, please contact:

Todd Penfound, C.E.T. (Consultant)
Project Manager
City of Ottawa
Infrastructure Services
100 Constellation Drive
Ottawa, Ontario  K2G 6J8
Tel: 613-580-2424, ext. 22021

Pat LeBlanc, P.Eng.
Consultant Project Manager
Robinson Consultants Inc.
350 Palladium Drive
Ottawa, Ontario  K2V 1A8
Tel: 613-592-6060, ext. 144

Project Overview

June 2016

Project description

The City of Ottawa engaged Robinson Consultants Inc. to prepare the design and construction documents for the renewal of the 610mm watermain in the north side of St. Joseph Boulevard from St. Jean Street to Champlain Street. The purpose of this work is to improve the reliability of the Water Distribution System. The renewal work will include the replacement of a section of watermain in St. Joseph Boulevard between St. Jean Street and Belcourt Boulevard. The replacement of all sections of watermain in St. Joseph Boulevard between St. Pierre Street and Maisonneuve Street. The replacement of a section of watermain in St. Joseph Boulevard between Place D’Orléans Drive and Champlain Street.

Robinson Consultants Inc. were also engaged to prepare the design and construction documents for the replacement of the existing concrete curb and sidewalk on the south side of St. Joseph Boulevard from St. Jean Street to Belcourt Boulevard and Edgar Brault Street to 70m west of Place D’Orléans Drive.

Estimated timelines

Design – June 2016 to November 2016
Construction start – June/September 2017
Construction substantial completion – September 2017

Budget - $2,228,000

Water - $2,048,000
Road (Sidewalk) - $180,000

For more information

Todd Penfound, Consultant
City of Ottawa
Planning, Infrastructure and Economic Development Department
Design & Construction – Branch 1
100 Constellation Drive, 6th Floor
Ottawa, ON K2G 6J8
Tel.: 613-580-2424, ext. 22021
Fax: 613-560-6064

Geotechnical investigation notice (July 2016)

St. Joseph Boulevard watermain repairs including sidewalk replacement (south side)

In late July 2016, the City of Ottawa will begin geotechnical and environmental investigation work related to the proposed St. Joseph Boulevard watermain repair construction project from St. Jean Street to Champlain Street (in the eastbound lane).

Who: The City of Ottawa engaged Robinson Consultants Inc. to prepare the design and construction documents for the renewal of the 610mm watermain in the north side of St. Joseph Boulevard from St. Jean Street to Champlain Street.

Robinson Consultants Inc. were also engaged to prepare the design and construction documents for the replacement of the existing concrete curb and sidewalk on the south side of St. Joseph Boulevard from St. Jean Street to Belcourt Boulevard and Edgar Brault Street to 70m west of Place D’Orléans Drive.

Why: The purpose of this work is to improve the reliability of the Water Distribution System. The renewal work will include the replacement of a section of watermain in St. Joseph Boulevard between St. Jean Street and Belcourt Boulevard.

What: Work will involve the replacement of all sections of watermain in St. Joseph Boulevard between St. Pierre Street and Maisonneuve Street, including the replacement of a section of watermain in St. Joseph Boulevard between Place D’Orléans Drive and Champlain Street.

When: As part of the geotechnical/environmental investigation work associated with this project, a geotechnical consultant (Houle Chevrier Engineering) will be completing field work on St. Joseph Boulevard eastbound lanes starting July 28th, 2016 with anticipated completion date July 29th, 2016.  Typical hours of work will be from 9:00 a.m. – 3:30 pm. The work entails advancing boreholes within the City’s road allowance to ascertain subsurface conditions. The proposed work plan includes drilling a total of three (3) boreholes (one borehole at St. Pierre Street, one at Edgar Brault Street and one just east of Maisonneuve Street).

Before commencing the work, the drilling contractor will need to obtain utility locates and apply for a road cut permit from the City. No detours are to be implemented since work for each borehole is of short duration and one travel lane will be maintained at all time at the drilling site.

The Contractor is obligated to provide 24 hour notification of temporary loss of access/egress from any entrance way.

Where: St. Joseph Boulevard from St. Jean Street to Champlain Street (in the eastbound lane).

Accessibility

Accessibility is an important consideration for the City of Ottawa. If you require special accommodations, please contact the undersigned.

We appreciate your cooperation during this work, and thank you for your patience.  For further information about this project, please contact the City’s Project Manager.

City of Ottawa, Project Manager
Todd Penfound, (Consultant)
Design and Construction Municipal East
100 Constellation Crescent
Ottawa, ON K2G 6J8
Tel: (613) 580-2424, x22021
Cell: (613) 277-3273

Robinson Consultants Inc., Project Manager
Pat LeBlanc, P.Eng.
Tel: (613) 592-6060, x144
Cell: (613) 410-2906