Confederation Line West Light Rail Transit (LRT) Extension

City of Ottawa’s Transportation Master Plan mandates that after the Confederation Line, the next section of the City’s light-rail system to be built is a western corridor link. To determine the right route, an Environmental Assessment was conducted during which more than a dozen options were exhaustively examined and re-examined and a preferred route rose to the top of the list.

Notice of Commencement

Transit Project Assessment Process

During the Notice of Commencement phase of the environmental assessment, copies of the draft Environmental Project Report (EPR) will be available to provide interested parties time to review and provide feedback prior to the formal 30-day public review period following the posting of the Notice of Completion.

 

Stage 2

Stage 2 logo – Stage 2 is part of Ottawa’s proposed 2013 Transportation Master Plan

You may be interested in

The July 8, 2015 City Council report on the Stage 2 Light Rail Transit (LRT) Environmental Assessment and Functional Design Report includes the western extension to Baseline and Bayshore and the Woodroffe Maintenance and Storage Facility.