Maintenance and Storage Facility

Monday, September 21, 2015
5:30 to 8 p.m., Presentation at 6:30 p.m.
Ben Franklin Place, Council Chambers and Atrium
101 Centrepointe Drive

This Community Information Session will:

  • Present the rationale for choosing the Woodroffe Avenue location (Woodroffe Avenue near Norice Street location; also known as the Nepean Corridor) for a future Stage 2 Maintenance & Storage Facility (MSF).
  • Provide background on initial site layout and access, potential construction phasing and timing, as well as measures to address environmental and community impacts and concerns.
  • Have City staff and consulting engineers to respond to residents' queries about the site.

Open House Display Boards

1.Welcome [ PDF 1.555 MB ]
2.Background [ PDF 642 KB ]
3.Need for Additional MSF Capacity [ PDF 736 KB ]
4.MSF Components [ PDF 1.036 MB ]
5.MSF Site Selection [ PDF 1.047 MB ]
5b.MSF Site Selection [ PDF 855 KB ]
6.Community Impacts and Mitigation [ PDF 926 KB ]
7.Conceptual Design Overview [ PDF 2.491 MB ]
7b.Conceptual Design Overview [ PDF 1.172 MB ]
8.MSF Connecting Track [ PDF 864 KB ]
9.Next Steps [ PDF 973 KB ]

The area of open land adjacent to an existing rail corridor has been selected as one of two recommended locations to meet future Light Rail Transit Maintenance and Storage requirements as the Confederation Line system expands.

Study area

Accessibility is an important consideration for the City of Ottawa. If you require special accommodation, please call or e-mail the project lead below before the event.

For further information please contact:

Nelson Edwards
Senior Project Manager
Transportation Planning
110 Laurier Avenue West
613-580-2424, ext. 21290
Fax: 613-580-2570
E-mail: Nelson.Edwards@ottawa.ca