Skip to main content

Montreal Road Transportation Planning and Functional Design Study

Open House - March 9, 2017

(North River Road to St. Laurent Boulevard)

Open House
Thursday, March 9, 2017
Wabano Centre for Aboriginal Health
299 Montreal Road
5:30 to 8 p.m.
OC Transpo route 12

The City of Ottawa is undertaking a transportation planning and functional design study of the Montreal Road corridor between North River Road and St. Laurent Boulevard. This project is being coordinated with the Montreal Road Infrastructure Renewal Project within the same study limits with construction scheduled to commence in 2019.

The functional design resulting from this study will serve as the basis for the Montreal Road Infrastructure Renewal project and the detailed design process will begin after this study is finalized. The functional design has been prepared in accordance with the 2013 Official Plan (OP) and Transportation Master Plan (TMP) policies.

At the Open House you will have the opportunity to review:

  • The functional design of the road corridor for the full study limits
  • General road cross-section details in specific areas
  • The addition of cycling facilities
  • Modifications to transit priority lanes
  • Protected intersection designs at the North River Road and Vanier Parkway intersections

Open House Display Boards [ PDF 2.314 MB ]

Conceptual Design [ PDF 10.727 MB ]

Accessibility is an important consideration for the City of Ottawa. If you require special accommodation, please call or email the project lead identified below before the event.

Should you require additional information regarding this study please contact:

Angela Taylor, P. Eng.
Senior Project Engineer 
Transportation Services Department
110 Laurier Avenue West, 4th Floor, Ottawa, Ontario K1P 1J1
613-580-2424 ext. 15210
Email: Angela.Taylor@Ottawa.ca