1.             ZONING – 316 TO 324 BRUYÈRE STREET AND 317 TO 321 ST. ANDREW STREET

 

ZONAGE – 316 À 324, RUE BRUYÈRE ET 317 À 321, RUE ST-ANDREW

 

 

 

Committee recommendationS as amended

 

Deferred from the Planning Committee meeting of 28 June 2011

 

(This matter is Subject to Bill 51)

 

1.                  That Council approve an amendment to the Zoning By law 2008 250 to change the zoning of 316 to 324 Bruyère Street and 317 to 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N (1856) S270 (Residential Fifth Density Zone, Subzone N, Exception 1856, Schedule 270) as shown on Document 1 and as detailed in Document 2.

 

2.                  That Document 2 be replaced with the following:

 

DETAILS OF RECOMMENDED ZONING                       DOCUMENT 2

 

Proposed Changes to the Comprehensive Zoning By-law

 

1.         The Zoning Map of City of Ottawa Zoning By-law 2008-250 is amended by changing the zoning of the lands known municipally as 316, 318, 324 Bruyère Street and 317, 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N [1856] S270 (Residential Fifth Density Zone, Subzone N, Exception 1856, Schedule 270);

 

2.         Add the attached Schedule as a new Schedule to Part 17 of the by-law.

 

3.         Add a new exception [1856] in Section 239 including the following provisions:

 

Column V: Provisions:

 

(1)The maximum permitted building height and number of storeys for an apartment dwelling, mid-high rise are set out on Schedule 270;

(2)Minimum width of a driveway providing access to a parking garage: 6.2 metres;

(3)Minimum aisle width providing access to parking spaces in a parking garage: 6.2 metres;

(4)               Minimum visitor parking rate for an apartment building, mid-high rise: none for the first 12 dwelling units and 0.083 spaces per unit thereafter.

(5)Minimum yard setbacks are set out on Schedule 270.

3.         That the contribution to cash-in-lieu of parkland in respect of the development be reduced by 40%;

4.         That the reduction be attributed to the amount that would have otherwise been deposited to the credit of the Ward 12 cash-in-lieu of parkland account;

5.         That an amount, as estimated by the General Manager, Planning and Growth Management, equivalent to the reduction in Recommendation 2 above be paid by Claridge to an account to provide for funding assistance for long term residents (more than 20 years) to find alternative accommodation.

6.         That the allocation of the funding pursuant to Recommendation 4 be subject to the direction of the General Manager, Community and Social Services Department, subject to the concurrence of the Chair of Planning Committee.

And that there be no further notice pursuant to Section 34 (17) of the Planning Act.

 

 

RecommandationS MODIFIÉES DU Comité

 

(Cette question est assujettie au Règlement 51)

 

1.                  Que le Conseil approuve une modification au Règlement de zonage de 2008-250 afin de changer la désignation de zonage du 316 au 324, rue Bruyère et du 317 au 321, rue St-Andrew de R4T (zone résidentielle de densité quatre, sous-zone T) à R5N (1856) A270 (zone résidentielle de densité cinq, sous-zone N, exception 1856, annexe 270) comme il est indiqué dans le Document 1 et expliqué en détail dans le Document 2.

 

2.         Que le Document 2 soit remplacé par ce qui suit :

 

DÉTAILS DU ZONAGE RECOMMANDÉ                        DOCUMENT 2

 

Modifications proposées au Règlement de zonage général de la Ville d’Ottawa

 

1.         La carte de zonage du Règlement de zonage no 2008-250 de la Ville d’Ottawa est modifiée en changeant le zonage des biens-fonds situés aux 316, 318, 324, rue Bruyère et aux 317, 321, rue St-Andrew de R4T (Zone résidentielle de densité 4, Sous-zone T) à R5N [1856] Annexe 270 (Zone résidentielle de densité 5, Sous-zone N, Exception 1856, Annexe 270);

 

2.         Ajouter l’Annexe jointe à titre d’une nouvelle Annexe à la Partie 17 du règlement.            

 

3.         Ajouter une nouvelle exception [1856] à l’Article 239 incluant les dispositions suivantes

 

Colonne V : Dispositions

 

(1)               La hauteur de bâtiment maximale permise et le nombre d’étages permis pour un immeuble d’appartements de moyenne à grande hauteur sont énoncés à l’Annexe 270;

(2)               Largeur minimale d’une entrée de cour menant à un garage de stationnement : 6,2 mètres;

(3)               Largeur minimale d’une allée menant à des places de stationnement dans une garage de stationnement : 6,2 mètres;

(4)               Taux minimal de stationnement pour visiteurs pour un immeuble d’appartements de moyenne à grande hauteur : aucun pour les 12 premières unités d’habitation et 0,083 place par unité pour le reste des unités d’habitation.

(5)               Les retraits minimaux de cour sont énoncés à l’Annexe 270.

 

3.         Que le règlement financier des frais relatifs aux terrains à vocation de parc s’appliquant aux aménagements soit réduit de 40 %;

 

4.         Que cette réduction soit appliquée au montant qui aurait autrement été déposé dans le compte du règlement financier des frais relatifs aux terrains à vocation de parc du quartier 12;

 

5.         Qu’un montant jugé équivalent à la réduction de la recommandation 2 ci‑dessus par le directeur général, Urbanisme et Gestion de la croissance, soit déposé par Claridge dans un compte visant à offrir une aide financière aux résidents de longue date (plus de 20 ans) pour se trouver un autre logement.

 

6.         Que l’affectation des fonds, conformément à la recommandation 5, soit décidée par le directeur général, Services sociaux et communautaires, sous réserve de l’accord du président du Comité de l’urbanisme.

 

Qu’aucun autre avis ne soit donné conformément au paragraphe 34(17) de la Loi sur l’aménagement du territoire.

 

 

Documentation

 

1.      Deputy City Manager's report, Infrastructure Services and Community Sustainability, dated 10 June 2011 (ACS2011-ICS-PGM-0085).

 

2.      Extract of Minutes 16, Planning Committee meeting of 28 June 2011

 

3.      Extract of Draft Minutes 18, Planning Committee meeting of 15 August 2011

 

4.      Revised Zoning Schedule, as amended by Planning Committee.


Report to/Rapport au :

 

Planning Committee

Comité de l'urbanisme

 

and Council / et au Conseil

 

10 June 2011 / le 10 juin 2011

 

Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/

Directrice municipale adjointe, Infrastructure Services and Community Sustainability/Services d’infrastructure et Viabilité des collectivités

 

Contact Person/Personne-ressource : Richard Kilstrom, Acting Manager/Gestionnaire intérimaire, Development Review-Urban Services, Inner Core/Examen des projets d'aménagement-Services urbains, Unité du Centre intérieur

Planning and Growth Management/Urbanisme et Gestion de la croissance

(613) 580-2424, 22379 Richard.Kilstrom@ottawa.ca

 

Rideau-Vanier (12)

Ref N°: ACS2011-ICS-PGM-0085

 

 

SUBJECT:

ZONING – 316 to 324 Bruyère street and 317 TO 321

st. andrew street (file D02-02-10-0100)

 

 

OBJET :

ZONAGE – 316 À 324, rue Bruyère et 317 À 321, rue st-andrew

 

REPORT RECOMMENDATION

 

That the Planning Committee recommend Council approve an amendment to the Zoning By‑law 2008‑250 to change the zoning of 316 to 324 Bruyère Street and 317 to 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N (xxxx) (Residential Fifth Density Zone, Subzone N, Exception xxxx) as shown on Document 1 and as detailed in Document 2.

 

RECOMMANDATION DU RAPPORT

 

Que le Comité de l’urbanisme recommande au Conseil d’approuver une modification au Règlement de zonage de 2008-250 afin de changer la désignation de zonage du 316 au 324, rue Bruyère et du 317 au 321, rue St-Andrew de R4T (Zone résidentielle de densité quatre, sous-zone T) à R5N (xxxx) (Zone résidentielle de densité cinq, sous-zone N, exception xxxx), comme il est indiqué dans le Document 1 et expliqué en détail dans le Document 2.

 

 

BACKGROUND

 

The subject lands are comprised of four separate parcels of land, known as 316 to 324 Bruyère Street and 371 to 321 St. Andrew Street. The subject lands form a T-shape with frontage on Bruyère Street as well as on St. Andrew Street.

The property at 316 Bruyère Street contains a single detached dwelling, the property at 318-320 Bruyère Street currently contains an existing 2.5‑storey apartment building, and the properties at 324 to 334 Bruyère Street consist of a two‑storey row house. The properties which front onto St. Andrew Street contain an existing two-storey single detached dwelling and an existing duplex. The properties at 324 (324‑334) Bruyère Street and 317 to 321 St. Andrew Street are on the Heritage Reference List.

 

The surrounding land uses are a mix of residential uses, primarily two-to-three-storey low-rise buildings, ranging from single detached dwellings, semi-detached dwellings and townhouses. The built form in the area is predominantly low-rise residential. To the east of the property are vacant lands. To the north is Bordeleau Park which extends to the Ottawa River and further northwest abutting King Edward Avenue. To the west is Rose Park, a small parkette at the corner of Rose Street and Bruyère Street. On the north side of St. Andrew Street are a mixture of townhouses and semi-detached dwellings. Further to the northwest and southwest are two-to-three-storey residential use buildings. St. Andrew Street and Bruyère Street are defined as local roads in the city’s Official Plan.

 

A Site Plan Control application is required to facilitate the construction of the proposed development and the applicant submitted a corresponding site plan control application which reflects the requested Zoning By-law Amendment.

 

The original Zoning By-law Amendment and Site Plan Control proposed an eight-storey building fronting onto Bruyère Street with a three-storey, three-unit townhouse fronting onto St. Andrew Street. The applicant has since modified the proposal as a result of community consultation and consultation with staff. The proposal has been reduced to a five-storey residential building, and has added one additional property (317 St. Andrew Street) to the application.

 

Proposed Development Concept

 

The proposed development consists of a 101-unit residential apartment building with a building height of five storeys (16.5 metres) fronting onto Bruyère Street and onto St. Andrew Street. The residential building is proposed to follow the configuration of the T-shaped subject lands with vehicular access to the underground parking garage at the east end of the site off Bruyère Street. Ground-oriented units are proposed along both the Bruyère Street and St. Andrew Street frontages as well as adjacent to Rose Park. The proposal would involve demolishing the existing built form from the intersection of Rose Street and Bruyère Street eastward to the vacant land at 346 Bruyère Street as well as demolishing the existing duplex and semi-detached dwelling which front onto St. Andrew Street.

 

A site plan and 3D elevation of these revisions can be found in Documents 3 and 4.

 

Existing Zoning

 

The properties are currently zoned Residential Fourth Density Zone (R4T) which permits a variety of low-rise residential uses, from single detached dwellings to low-rise apartment dwellings. A low-rise apartment building is defined as a building up to four storeys. There is a 14.5 metre height limit for low-rise apartment dwellings in the zone to accommodate the recent trends of higher floor-to-ceiling heights within a low-rise apartment building.  

Purpose of Zoning Amendment

 

With respect to the proposed five-storey residential building, the Zoning By-law Amendment proposes to rezone the lands to an R5N zone (Residential Fifth Density Zone) to permit a mid-rise apartment building. The proposal would require an exception to the R5N zone to permit site specific setbacks and a height limit which is discussed in detail in the following section.

 

The application consists of a 0.85-metre front yard setback along Bruyère Street and a 3.16‑metre front yard setback along St. Andrew Street. Along the St. Andrew Street frontage, the fifth storey is stepped back from the front by 2.0 metres. The interior side yards for the first 21 metres from Bruyère Street is proposed to be 1.5 metres. In addition, there is a proposed canopy projection along the Bruyère Street frontage which proposes to project up to the lot line abutting Bruyère Street.

 

Proposed Zoning

 

The Zoning By-law Amendment proposes to modify the zoning on the property as follows to accommodate the five-storey residential building:

 

  • amend the R4T zone to an R5N zone, with a height exception limited to five storeys (16.5 metres);
  • a site specific front yard setback along Bruyère Street of 0.85 metres;
  • a site specific side yard setback for the first 21 metres from Bruyère Street of 1.5 metres; and
  • a site specific provision to permit a canopy to project up to 0 metres to the lot line along Bruyère Street.

 

DISCUSSION

 

Planning Act and Provincial Policy Statement

 

Section 2 of the Planning Act outlines those land use matters that are of provincial interest, to which all City planning decisions shall have regard. The provincial interests that apply to this site include the appropriate location of growth and development and the promotion of development that is designed to be sustainable to support public transit and to be oriented to pedestrians.

 

In addition, the Planning Act requires that all City planning decisions be consistent with the Provincial Policy Statement (PPS), a document that provides further policies on matters of provincial interest related to land use development. The PPS contains policies which indicate that there should be an appropriate mix of uses to support strong, liveable and healthy communities.

 

The proposed zoning allows for an increase of residential units, which will efficiently use land and contribute to a balanced community. The site is located in proximity to two arterial roads (King Edward Avenue and St. Patrick Street), which provide access to the site. The site is conveniently located near residential and commercial areas to allow for access by pedestrians and transit. The Department is of the opinion that the proposal is consistent with the matters of provincial interest as outlined in the Planning Act and the PPS.

 

Official Plan

 

Strategic Directions and Land Use Designation

 

Section 2.3.1 of the Official Plan sets broad strategic directions to meet the challenge of managing growth and directing growth to the urban area where services exist, providing infrastructure, maintaining environmental integrity and creating livable communities within Ottawa. To meet these challenges, polices are set out to pursue compact forms of development which in turn will enable the City to support a high-quality transit system and make better use of existing infrastructure and roads. 

 

The site is designated General Urban Area on Schedule B of Volume 1 of the Official Plan. The General Urban designation is intended to facilitate the development of complete and sustainable communities with a full range and choice of housing, in combination with conveniently located employment, retail, service, cultural, leisure, entertainment and institutional uses. The Official Plan supports infill development and intensification within the General Urban Area, provided it is developed in a manner that enhances and complements the desirable characteristics of the existing community and ensures its long term vitality. The Official Plan further requires that uses that serve wider parts of the city be located at the edges of neighbourhoods on roads where the needs of these land uses, such as transit, access and parking can be more easily met and their impacts controlled. The consideration of infill and intensification in the General Urban Area, the City will consider the following:

 

·    recognize the importance of new development relating to existing community character so that it enhances and build upon desirable established patterns and built form;

·    apply the policies of Sections 2.5.1 and 4.11;

·    consider the contribution to the maintenance and achievement of a balance of housing types and tenures to provide a full range of housing for a variety of demographic profiles; and

·    assess ground oriented multiple housing as one means of intensifying within established low-rise residential communities.

 

Section 2.2.3 “Managing Growth within the Urban Area” provides direction for intensification in the General Urban area. Where a Zoning By-law Amendment is required to facilitate intensification, the appropriateness of the scale of development will be evaluated along with the design and its compatibility. Additional cases such as the site being within 600 metres of a rapid-transit station; lands that are no longer viable for their use; lands where the present use is maintained but additional uses can be accommodated on the site; lands currently or formerly used as parking lots; or lands where records indicate existing contamination, are also considered for intensification.

 

The Department is of the opinion that the proposal satisfies the criteria of the General Urban Area with respect to the consideration of intensification. The proposal enhances and builds upon the established built form in the area. The proposal also satisfies the compatibility and design criteria of the Official Plan with respect to intensification. While the proposal is not within 600 metres of a transit station nor does it fall within any of the remaining criteria listed above with respect to Section 2.2.3, it is a modest increase in height and massing in comparison to what can be accommodated within the existing R4T zone.

The proposed five-storey residential building provides an opportunity for additional residential units at a scale and massing that supports the overall goals and policies of the Official Plan’s Strategic Directions and General Urban designation.

 

Compatibility and Community Design

 

Section 2.5.1 of the Official Plan recognizes the importance of compatibility and community design when considering new development. The Official Plan recognizes in order for a development to be compatible, it does not necessarily have to be the same as, or similar to, the existing buildings in the vicinity. Rather, compatible development enhances an established community and coexists with existing development without causing undue adverse impact on surrounding properties. The Official Plan provides objective criteria to evaluate compatibility in Section 4.11.

 

Section 2.5.1 also addresses community design and acknowledges that good urban design and quality architecture can create lively places with distinctive character which provide tools to shape the environment. This section provides a set of design objectives and principles to be considered in evaluating development proposals. The design objectives include:

 

·         enhancing a sense of community by creating distinct places;

·         defining quality public and private spaces;

·         creating spaces that are safe and accessible;

·         ensuring that new development respects the character of existing areas;

·         considering adaptability and diversity when creating spaces; and

·         understanding and respecting natural processes and promoting environmental sustainability in development.

 

The Department is of the opinion that the proposed development satisfies Section 2.5.1. The Department is sensitive to the elimination of the existing building along Bruyère Street by this proposal and that the proposed building creates a new streetscape for the Bruyère Street frontage within the block between Rose Street and Forsey Street. The development, as proposed, is located with a front yard setback of 0.85 metres which is consistent with the existing front yard setbacks of the existing residential buildings along Bruyère Street. For those existing buildings located at 316 to 324 Bruyère Street, they encroach into the Bruyère right-of-way and in the case of 324 Bruyère Street the steps of all of the front porches of the buildings encroach onto the right-of-way. The design of the proposed building now responds to staff’s direction to the applicant to include ground-oriented units with direct access to the street for each unit, to be reflective of the multiple pedestrian accesses to the existing buildings along Bruyère Street. In addition, the multiple accesses provide an architectural relief along the Bruyère Street frontage.  

 

The area is characterized by a mix of low-rise residential built form, and while the proposal is an increase to the existing height of the buildings in the immediate area, it is a modest increase and one that can be mitigated by the design of the proposed building with the ground-oriented units, the architectural delineation of the first two floors and the stepping back of the fifth floor along the St. Andrew Street frontage. In addition, Rose Park adjacent to the west provides buffering to the low-rise residential uses to the west.

 

 

As previously mentioned, Section 4.11of the Official Plan provides objective criteria to evaluate compatibility. The proposal was also reviewed in light of the criteria in Section 4.11 and the Transit-Oriented Design Guidelines. The following is an analysis of the applicable criteria, which demonstrates that the proposed development does satisfy the compatibility tests of the Official Plan.  

 

Policy 1 of Section 4.11 recognizes that compatibility is not the only tool to evaluate development proposals, and that the City must have regard for the policies of Section 4.1 through 4.10, the objectives of Section 2.5.1, and the policies of any applicable Secondary Plans or site-specific policies. As previously discussed, the proposal meets the intent of the General Urban Area and satisfies the policies of the Strategic Directions as contained in the Official Plan. In addition, the Department is satisfied that the applicable policies contained in Sections 4.1 through to 4.10 are met.

 

Policy 2 of Section 4.11 acknowledges that not all of the objective criteria contained in the Official Plan are meant to be applicable to all circumstances; some may not apply, or may be evaluated and weighed on the basis of site circumstances.

 

Policy 2(a) requires that roads should be adequate to serve the development with sufficient capacity to accommodate the anticipated traffic generated by the development.

 

Vehicular access to the proposed building is from Bruyère Street via an underground parking garage entrance located at the easterly edge of the property which is proposed to provide parking for the residents and visitors of the five-storey residential building. A Community Transportation Study (CTS) was prepared in support of the application which has been reviewed by the Department. The Department had some comments and questions regarding the CTS and at the time of writing this report, the applicant was in the process of addressing the comments. The implementation of the CTS will occur through the Site Plan process.  

 

Policy 2(b) requires that the vehicle ingress and egress to a development should address impacts such as noise, headlight glare and loss of privacy on development adjacent, or immediately opposite, to the subject property. The proposed garage entrance on the most easterly side of the proposed five-storey building, and this location is considered to have the least amount of impact in terms of pedestrian movement and the surrounding land uses including the adjacent parkette to the west of the site. In addition, the development will reduce the number of driveways along the Bruyère Street frontage from three to one. This will provide uninterrupted pedestrian movement from the intersection of Rose Street and Bruyère Street for approximately 60 metres. The proposal also results in the elimination of two of the existing driveways along the St. Andrew Street frontage which will also help to improve the pedestrian movement in the area. There is no vehicular access to the parking garage along the St. Andrew Street frontage, reducing any possible negative impacts to the existing residents on St. Andrew Street.   

 

Policy 2(c) requires that a development should have adequate on-site parking to minimize the potential for spill-over on adjacent areas. Opportunities should be considered to reduce parking requirements and promote increased usage of walking, cycling and transit, particularly in the vicinity of transit stations or major transit stations in accordance with Section 4.3. The proposal supplies the required amount of both resident and visitor parking.

 

Policy 2(d) addresses building heights and massing recognizing that new buildings should have regard for the area context, which includes not only the massing and height of adjacent buildings but also the planned function of the area. The desire for a transition in building heights can be offset where natural buffers and setbacks exist or through the use of appropriate design measures to create a more pedestrian-friendly environment.

 

With respect to the building height and massing, the Department is of the opinion that the height and massing of the building meets the intent of the planned function of the area. The subject lands are located within the established low-rise residential area of Lowertown and the proposed zoning is a modest increase in height, from the permitted 14.5 metres within the R4T zone to 16.5 metres. A more pedestrian-friendly environment is achieved through the design of the building with the ground-oriented units along each street facade and a Bruyère Street front yard setback consistent with the existing neighbourhood fabric. In addition, the vertical architectural features break up the massing of the building to create a visual perspective that is reflective of the neighbourhood’s built environment. The existing zoning in the area includes R4T and R4F zoning which permits a variety of residential dwelling types. As previously mentioned, the intent of the R4 zoning with a height limit of 14.5 metres is to accommodate a low-rise apartment building while recognizing that building trends are moving towards a greater floor to ceiling height. Further to the northwest is an R5B H(16) zoning which also permits a variety of residential dwelling types and contemplates a slightly higher built form of 16 metres (five storeys).

 

The development proposes a 1.5 metre side yard setback for both the easterly and westerly side yards for the first 21 metres from Bruyère Street. Amenity spaces are proposed in the middle area of the building with setbacks of 7.5 metres. With respect to the setbacks from St. Andrew Street, a 3.05 metre front yard setback is proposed for the first four storeys with the fifth story stepped back another 2.0 metres from St. Andrew Street. The proposed 3.05 metre front yard setback is consistent with the existing front yard setbacks of townhouses to the west. The existing semi-detached dwelling and duplex dwelling which is to be demolished currently has setbacks ranging from 0.55 metres to approximately 2.5 metres. The existing townhouses adjacent to the east have a large front yard setback of 7.3 metres, which is significantly larger than what the current zoning permits and provides a buffer to the proposed building. The Department is of the opinion that these setbacks, in conjunction with the proposed height of five storeys, and the design of the building is compatible with the built form from the existing built form on Bruyère or St. Andrew Street to satisfy policy 2(d).

 

Policy 2(e) recognizes the pattern of the surrounding community and acknowledges that for development that proposes a different height, building mass, proportion, street setback or distance between buildings from the pattern of the area, the design of the proposed building may compensate for this variation. The height of the proposed building is taller than the surrounding buildings along St. Andrew Street; however the fifth storey is stepped back 2.0 metres from the St. Andrew Street frontage which reduces the impact of the height. It is staff’s opinion that the additional height is modest in comparison to the permitted height of the R4T zone and the existing three-storey townhouses which are adjacent to both the east and west sides of the building along the St. Andrew Street frontage. In addition, ground-oriented units and an additional entrance are proposed along the St. Andrew Street frontage with the same architectural features as the Bruyère Street facade.


The front yard setback of 3.05 metres proposed for the St. Andrew Street frontage and the interior side yard setbacks of 2.5 metres for the first 21 metres provide a consistent street edge along St. Andrew Street from Rose Street and sufficient side yards to neighbouring properties.    

 

Policy 2(j) requires that the development should minimize shadowing on adjacent properties, to the extent possible, through the siting and design of buildings. Based on the location of the site, the majority of the shadowing will occur on the north side of Bruyère Street in Bordeleau Park. According to the applicant’s sun-shadow study, the proposed five-storey building will have minimal effects on the shadowing of the park during the summer, however in the winter months (December), there appears to be shadowing of the park. The Department is of the opinion that the extent of the shadowing of the park does not result in undue impacts.

 

Policy 2(l) requires that the development provide supporting neighbourhood services, or alternatively, is able to be supported by existing neighbourhood services. There are a number of services in the immediate area that could support the proposed development.

 

Other design and compatibility criteria such as noise, lighting, fencing, microclimate and loading areas are addressed through the Site Plan Control process.

 

Official Plan Amendment 76

 

While Official Plan Amendment 76 is currently under appeal and is not in full force and effect, the amendment was adopted by City Council and thus is taken into consideration in the evaluation of planning applications. When evaluating the appropriateness of a development proposal, one of the main differences between the City of Ottawa’s approved Official Plan and Official Plan Amendment 76, are the compatibility criteria found in Section 4.11.

 

One new policy is the consideration of whether the design of a proposal takes advantage of opportunities to improve the character and quality of an area and the way it functions. Other new policies appropriate for consideration in a rezoning application are policies related to Building Profile and Compatibility. Development proposals will also address issues of compatibility and integration with surrounding land uses by ensuring an effective transition in built form. This will serve to link the proposed development with existing development.

 

In terms of height, Official Plan Amendment 76 defines a Mid-Rise as a building of five to nine storeys. The policies recognize that integrating taller buildings within an area characterized by a lower built form is an important design consideration, especially in relation to intensification. The policies further provide criteria to achieve a built form transition by:

 

a.         Incremental changes in building height (e.g. angular planes or stepping the building profile up or down);

b.        Massing (e.g. inserting ground-oriented housing adjacent to the street as part of a high-profile development or incorporating podiums along a Mainstreet);

c.         Character (e.g. scale and rhythm, exterior treatment, use of colour and complementary building finishes);

d.        Architectural design (e.g. the use of angular planes, cornice lines); and

e.    Building setbacks.

 

The Department satisfied that the proposal meets the intent of policies of Official Plan Amendment 76. The building proposes an incremental change in building height along the St. Andrew Street frontage and also provides for ground-oriented units along both the St. Andrew Street and Bruyère Street frontages.

 

Details of Proposed Zoning 

 

The Zoning By-law Amendment application requests to change the existing R4T zoning to an R5N zone with site specific provisions to permit a mid-rise apartment building (five storeys), with a height limit of 16.5 metres, a setback to Bruyère Street of 0.85 metres, a canopy projection of 0 metres and 1.5 metre side yard setbacks for the first 21 metres from Bruyère Street. 

 

Servicing Issues 

 

A servicing study was provided in conjunction with the development application. The Department has reviewed the study and has no issues with the findings with respect to capacity.  Further detailed review will be undertaken as part of the Site Plan Control process.

 

Concurrent Application 

 

As previously mentioned, a Site Plan Control application has been submitted which reflects the building elevations and site plan submitted with the Zoning By-law amendment application. If approved, the Site Plan Control application would implement the development.

 

Summary

 

In summary, the proposed Zoning By-law Amendment supports the direction of the Planning Act, Provincial Policy Statement and Strategic Directions of the Official Plan. The mid-rise residential development is a modest increase to the height of the existing zoning and the resulting development has satisfactorily addressed the compatibility and design criteria as well as transportation and servicing criteria.

 

ENVIRONMENTAL IMPLICATIONS

 

A Phase I Environmental Site Assessment was submitted as part of the Zoning By-law Amendment application. No significant issues were identified in the Phase I ESA.

 

RURAL IMPLICATIONS

 

N/A

 

CONSULTATION

 

Notice of this application was carried out in accordance with the City’s Public Notification and Consultation Policy. The Department received numerous comments from the public and community groups which are included in Document 5.

 

LEGAL IMPLICATIONS

 

Should this matter be appealed to the Ontario Municipal Board, it is anticipated that a three-day hearing would result.  If the recommendation is approved and the matter appealed, it is expected that the case could be conducted within staff resources.  If the rezoning is refused, reasons must be provided. The City would need to retain an external planner to provide opinion evidence in support of the position of Council It is estimated that the cost that would be incurred by the City would be in the range of $20,000 to $25,000. 

 

RISK MANAGEMENT IMPLICATIONS

 

N/A

 

CITY STRATEGIC PLAN

 

The proposed development and planning application is aligned with the City Strategic Plan in that it respects the existing urban fabric or neighbourhood form so that new growth is integrated seamlessly with established communities.

 

TECHNICAL IMPLICATIONS

 

N/A

 

FINANCIAL IMPLICATIONS

 

If the rezoning is refused, the City would need to retain an external planner to provide opinion evidence in support of the position of Council. It is estimated to be in the range of $20,000 to $25,000. Funds are not budgeted for external planning consultants; the expense may impact Planning and Growth Management’s 2011 operating status.

 

APPLICATION PROCESS TIMELINE STATUS

 

This application was not processed by the “On Time Decision Date” established for the processing of Zoning By-law Amendment applications as the applicant was required to address staff’s comments.

 

SUPPORTING DOCUMENTATION

 

Document 1    Location Map

Document 2   Details of Recommended Zoning

Document 3    Proposed Site Plan

Document 4    3D Elevations

Document 5    Consultation Details


 

DISPOSITION

 

City Clerk and Solicitor Department, Legislative Services to notify the owner, applicant, OttawaScene.com, 174 Colonnade Road, Unit #33, Ottawa, ON  K2E 7J5, Ghislain Lamarche, Program Manager, Assessment, Financial Services Branch (Mail Code:  26-76) of City Council’s decision.

 

Planning and Growth Management to prepare the implementing by-law, forward to Legal Services and undertake the statutory notification.

 

Legal Services to forward the implementing by-law to City Council.


LOCATION MAP                                                                                                DOCUMENT 1

 


DETAILS OF RECOMMENDED ZONING                                                    DOCUMENT 2

 

Proposed Changes to the Comprehensive Zoning By-law

 

1.      The Zoning Map of City of Ottawa Zoning By-law 2008-250 is amended by changing the zoning of the lands known municipally as 316, 318, 324 Bruyère Street and 317, 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N [xxxx] (Residential Fifth Density Zone, Subzone N, Exception xxxx);

 

2.      Add a new exception [xxxx] in Section 239 as follows:

 

Column V: Provisions:

 

a.     the maximum height and number of storeys for an apartment dwelling, mid-high rise is 16.5 metres and 5 storeys

b.    the minimum yard setback from the Bruyere Street lot line is 0.85 metres

c.     notwithstanding Section 65, a canopy is permitted to project up to the rear lot line 

d.   the minimum side yard setback for an apartment dwelling, mid-high rise for the first 21 metres from Bruyere Street is 1.5 metres

 

 


PROPOSED SITE PLAN                                                                                    DOCUMENT 3


PROPOSED 3-D ELEVATION                                                                          DOCUMENT 4

 


CONSULTATION DETAILS
                                                                             DOCUMENT 5

 

NOTIFICATION AND CONSULTATION PROCESS

 

Notification and public consultation was undertaken in accordance with the Public Notification and Public Consultation Policy approved by City Council for Zoning By-law amendments. 

 

 

PUBLIC COMMENTS

 

There were many members of the public who provided comments on this application. Owing to the large amount of public input, including a submission signed by 50 members of the public (Bruyère Task Force) and numerous other submissions by smaller groups, the comments have been categorized to avoid repetition in the comments and the staff response. A summary of the public comments and staff response are provided below.

 

 

SUMMARY OF PUBLIC INPUT

Comment:

HEIGHT/MASS/SCALE:

·        The sheer size (height and width) of the proposed building on Bruyère is incompatible with the low rise neighbourhood surrounding it

  • The proposed setback, does not adequately address the massing issue that will be left by the bulk of the building.
  • The features of this proposed building are out of line with the already impressive density within this small area. The affected community has already intensified significantly, adding density in innovative low-rise architecture primarily within the existing zoning.
  • Nowhere in Lowertown or Sandy Hill is there a building so completely unrelated to the scale and nature of the surrounding development, which conform to R4 zoning at heights of one to three storeys and offer a variety of physical forms, prices and ownership types.
  • Exceeding four storeys would drastically alter the community.
  • The footprint of the five-storey option is even bigger than the eight-storey option, and will require the demolition of more buildings.
  • The proposed building is out of scale and out of character for the community
  • Anything over four storeys (the current zoning) would negatively alter the character and skyline of the community

 

Staff Response:

The Department is of the opinion that the proposed development is compatible with the surrounding low-rise residential area and that the proposed Zoning By-law Amendment does satisfy the policies of the Official Plan or the PPS. Details regarding the Department’s position are contained in the body of this report.


 

Comment:

TRAFFIC

  • The ingress for the new residents would see Bruyère used as the almost exclusive ingress point due to traffic control established at Forsey/St. Patrick and St. Andrew and St. Patrick.
  • Even if traffic entered from all the streets (Guigues, St. Andrew, Bruyère or Cathcart), all cars would be funnelled through the intersection of Bruyère and Rose. This intersection is the only intersection through which pedestrians and dogs enter Bordeleau Park that has become the core of our community.
  • Dozens of individuals who work at the Department of Foreign Affairs already park on the neighbourhood streets, leaving it very difficult for neighbours to have on-street parking for visitors. In addition, the park is very well used, particularly in the summer, by dozens of people using the soccer field, the playground or the tennis courts. This situation creates a potential safety concern. The current on-street parking hampers the ability of emergency vehicles (e.g., fire trucks, ambulances, as well as snow removal apparatus) to enter our community, especially in winter.
  •  In considering this proposal, the City must consider the impact on the community of traffic due to the eventual redevelopment of the property currently owned by the Government of Iraq (346 Bruyère). Currently, the Chinese Embassy operations during working hours impacts traffic on St. Patrick.
  • The impact of the additional cars on King Edward and St. Patrick has not been fully assessed by the developer. The negative impact inside the enclave is clear. However, any additional traffic on those roads at peak times would add to an already contentious urban issue.

 

Staff Response:

As noted in the body of the report, the Department has outstanding comments with respect to the submitted Community Transportation Study, which are currently being addressed and any recommendations from the study will be further addressed in the Site Plan agreement. The issue of parking from other uses in the area can be addressed through Parking Enforcement and an evaluation of the on-street parking restrictions in an area is not part of a Zoning By-law Amendment application. The applicant is proposing a total of 133 parking spaces for the residents and visitors which exceeds the minimum requirements of the Zoning By-law.

 

Comment:

GEOTECHNICAL

  • Dewatering impacts have not been fully addressed relative to the shoreline, the development’s foundation and foundations nearby. There are several concrete examples of how dewatering and blasting have impacted the foundations of this neighbourhood. In addition, due to the clay-based riverbed nature of the land in this area, several homes are already experiencing significant stress on their foundations as the clay continues to settle.

·        Micro-site blasting has not been fully assessed for the impacts it will have on stone and sand foundations. Any blasting that will occur must have area foundations assessed by an engineer, paid for by the developer but sourced by the homeowner to set baseline structural competencies.

  • The Elevations show no parking details i.e. no elevation details below grade. Structures with windows are shown on the roof above the third storey level. Does this provide access to the roof? If roof decks are envisioned, they will be incongruous with the neighbourhood.

·        The parking structure will be below the level of the Rideau River. What are the implications and where will infiltrating water be directed?

·        The consultant notes that “if there are more than two levels of parking” where the program states that there will be three levels of parking. All studies should be based on the assumption that there will be three levels of parking. Assessment of the foundation cannot be undertaken until the number of levels of parking are confirmed as geological strata and engineering properties vary with depth.

 

Staff Response:

The proposal intends to accommodate the required parking in an underground parking garage. The parking garage is proposed to accommodate 110 parking spaces (residential and visitor). With respect to the dewatering or blasting of the site, these are issues which would be addressed at the Site Plan Control stage. In addition, Rideau Valley Conservation Authority has been circulated the application and has provided the following comments regarding the proposal: 

 

“This development is not within the 1:100 year floodplain of the Rideau River, however the city should ensure that protection is in place relating to the Stormwater and drainage system so that no storm sewer surcharging or flooding would occur as a result of the nearby Rideau River reaching 55.71 metres geodetic, the 1:100 flood elevation.”

 

Comment:

PRECEDENT

  • Approval of this request for re-zoning for an increased height limit and decreased setbacks would reverse a policy that has served the non-commercial area of Lowertown well for the last 35 years. If permitted, this change will serve as a precedent for applications from other sites in the immediate area including:

·         the large vacant land adjacent to the proposed site on Bruyère Street;

·         a parcel of land having small older houses similar to that at 316 Bruyère which are adjacent to an empty lot from 285 to 395 St. Andrew Street;

·         other lots with smaller, older structures in the immediate vicinity west of King Edward Ave.

 

Staff Response:

Each planning application is reviewed on its own merits. The Department recognizes that there are properties within the vicinity of the subject property that could be re-developed however, each application will be evaluated at that time independently of any other planning applications in the area.

 

Comment:

HERITAGE

As part of the community’s submission, a document entitled Lowertown East Our Disappearing Heritage which was reviewed by Heritage Services. In addition, there are these following comments received regarding heritage concerns:

·        I'm worried about the demolition of the heritage house on the corner of Rose and Bruyère. I believe the house is 140 years old. What is the city of Ottawa doing to safeguard this type of heritage?

·        There has been no effort to incorporate heritage buildings

·        There is no respect for the diverse historical and current built substance of the neighbourhood

·        There is no effort to maintain, compliment or reflect heritage

  • The proposal makes no effort to incorporate heritage buildings
  • Although Lowertown East is not designated as a heritage area, there a number of old houses. Among those that will be demolished are early 20th century homes. Instead of respecting the historic value of the neighbourhood, the developer says it aims to “incorporate elements of the heritage character” of the neighbourhood. We respectfully disagree with this assessment, since the six brick houses that will be demolished are much more indicative of the heritage character than the proposed building is. The same could be said about 321 St-Andrew St.

·        324-334 Bruyere is a unique Victorian six unit rowhouse built in 1910 – making it by definition a heritage property; this building must be saved.

·        The proposal would essentially gut what may be the most complete block of historic housing left in the neighbourhood.

 

Staff Response:

Heritage Staff were consulted at the pre-consultation stage as well as during the circulation of this Zoning By-law Amendment application. Heritage Staff have not identified any heritage significance pertaining to the existing structures on the subject lands that would warrant designating the building under Part IV of the Ontario Heritage Act. Below is the comment received from Heritage Services. The Department has consulted the applicant on the suggestion by Heritage Services that a commemorative plaque be placed in one of the adjacent parks to describe the history of Lowertown. The applicant has agreed to this suggestion and details of the plaque will be addressed at the Site Plan Control stage and detailed in the Site Plan agreement. 

 

Heritage Services comments:

The properties proposed for demolition as part of this development application have undergone a number of unsympathetic alterations over time. A brief description follows:

 

321 St. Andrew The integrity of the brick has been damaged by several layers of paint. The slumping of brick on the front elevation indicates some structural distress. The decorative star motif above the windows described in the report Lowertown East Our Disappearing Heritage by the Lowertown Community Association and Bruyere Street Task Force, April 2011, is a common design evident in other Lowertown buildings such as 236-238 Cathcart. The front porch, original windows, doors and end brackets in the roof cornice have been removed.

 

316 Bruyere has undergone similar alterations with newer sheathing throughout.


 

324-334 Bruyere There is a visible wave in the building apparent in the roofline when seen from across the street. This is an indication of some structural movement. The building retains its original cornice and the brick appears in fair to good condition. This is not a rare building type for Lowertown as a whole.

 

317-319 St. Andrew This double-gabled dwelling is currently covered with siding. The historic photo in the report Lowertown East Our Disappearing Heritage illustrates a number of changes to the building including different openings on the ground floor, loss of porch etc. Only the general form of the original building remains.

 

Conclusion

 

In summary, the alterations to the original buildings have compromised their design character and significance. There is also a degree of structural distress evident in some of the buildings. The historic streetscape context has also been largely lost in this block with the exception of the east side of Rose Street which contains two flat-roofed brick doubles in good condition.

 

Recommendations

 

Whereas the retention of these buildings may not be warranted, they should be photo-documented prior to demolition. The bricks on the row at 324-334 Bruyere should be recycled. The applicant could be requested to fund a commemorative plaque in one of the adjacent parks to describe the history of Lowertown East as a condition of Site Plan Approval. The Lowertown Community Association could be encouraged to update the Heritage Reference List for the neighbourhood to enable an accurate inventory of remaining older buildings in the area. In terms of the rezoning, there is nothing in the area higher than three storeys so the proposed development would be higher than existing properties in this block and the Lowertown East neighbourhood.

 

Comment:

CITY PARK AND SUN-SHADOW STUDY

·        The enormous bulk of the proposed building will create a massive barrier that will produce a sun shadow during many parts of the day over the year. This park that will be overshadowed currently supports year-round activities including soccer and picnics in summer, snowshoeing and cross-country skiing in winter.

  • Early morning studies and late day studies have not been provided. Shadows will have significant impact on Bordeleau in the fall, winter and spring when the sun’s angle is low. More complete shade studies will show that much of the park will be in shadow during this time of the year, and that shadows will reach across the park to neighbouring properties in the early morning and evening.
  • This is a very small community which is united by Bordeleau Park, directly across the street from the proposed eight-storey building. Lowertown East is contained by the damaging traffic of King Edward Avenue and St. Patrick Street, it is crucial that the park be safe guarded as jewel in this community. The park will be shadowed once the building is completed. 
  • Noise from air conditioning and heating will detract from park ambience and possibly endanger wildlife.

 

Staff  Response:

The Department has not identified a concern regarding the shadowing impacts of the five-storey building on the existing park. The Department is the opinion that the sun shadow impact to the park that primarily occurs during the winter months will not result in undue or adverse impacts to the park.

 

Comment:

SITE DESIGN/SITE FUNCTIONING ISSUES

  • Proposed building will remove its occupants from the kind of street level activities that enhance overall neighbourhood safety and the feelings of security
  • The design discourages people interactions in an area of homes/rowhouses/walk-ups with doors opening at streetside
  • The design encourages entry into and out of an underground garage
  • Special attention should be paid to the noise generated HVAC equipment
  • Small setbacks on Rose St. and St. Andrew St. are not typical of the area and do not justify the lack of setbacks on this proposal
  • No discussion of what the living environment will be like for the units located within the inside corners of the “T”
  • The developer has not adequately described how they will manage waste produced by the condominium units. We anticipate it would necessitate additional heavy truck traffic on the street on a weekly basis at the very least and may also include unsightly garbage bins visible to the neighbours. Also as noted above, the daily on-street parking by both existing residents as well as DFAIT employees will make it very difficult to navigate other servicing traffic (i.e. moving vans, delivery trucks, etc.)
  • With any new building of the size proposed by Claridge, Bordeleau Park would be lit at all times. The building would be unavoidable under any circumstances, but even the dark would not hide its mass due to the large amount of proposed units with exterior as well as interior lighting.  
  • There is no indication of how the developer would mitigate the effects of construction on the neighbourhood. We assume that in order to construct there will be significant blasting, trucks and other equipment coming through, staying on site etc. Given the size of the development and the absence of an open space to put equipment, where will that equipment be kept? How will it be moved? What is the compensation regime for any damage caused by the construction (do we have to go through the normal civil courts with the resulting time and money, or is there some expedited process?)
  • Our fourplex was originally a double built in 1898, to which an addition was added in 1956. We were in the process of planning exhaustive renovations to the place as it is in need of an overhaul.

What were motivating those renovations were, in part, the decaying foundations and the weaker walls of the addition. I am not an engineer but I can say that no blasting (for the lower levels of the parking) can be undertaken until an engineer has come in to do an inspection. In fact, we highly doubt that the foundations of the addition (which stand on clay and not cement) can withstand controlled blasting as it is located about 12 metres from the back lot line. As landlords and residents, our fear is both for the solidity of our residence, but also for the safety of the tenants and of ourselves.

 

Staff Response:

With respect to the design, ground-oriented units are proposed along the Bruyère Street frontage and the frontage of Rose Park to encourage pedestrian interaction. The setback proposed along Bruyère Street is similar to the setbacks of the existing buildings. The setback proposed along St. Andrew Street is similar to the existing buildings along St. Andrew Street. Further discussion regarding the design is found in the body of the report.

 

Construction methods are not considered through the Zoning By-law amendment process, the issues identified pertaining to construction would be addressed at the Site Plan Control stage and Building Permit process stage. If development were to proceed, the applicant would have to store the construction vehicles on-site or off-site in accordance with the City’s regulations. The Site Plan Control application is currently on hold until a decision regarding the Zoning By-law Amendment has been made by City Council. If the Zoning By-law Amendment application is approved, the Site Plan Control process would continue and at that time the issues of de-watering, blasting and construction issues would be addressed.

 

The City’s Noise Control Study guidelines establish when such a study is required, mid-rise housing do not generate a noise level that would necessitate a Noise Control Study.

 

Comment:

SERVICING

·        Claridge did not provide any assessment of how the condominium units will impact existing infrastructure.

 

Staff Response:

The Zoning By-law Amendment application included a servicing study which indicates that there are no servicing issues for the proposed development.

 

Comment:

ENVIRONMENTAL DESIGN

  • Claridge’s plan does not advance an environmental agenda. There are no plans for LEED standards or offsetting of any kind. Moreover, they have not presented options for sustainable development using reclaimed or locally sourced materials.
  • Increase in people but decrease in open space
  • Decreases existing green landscaping
  • Shows little sign of energy conservations intelligence (northern exposure, etc.)

 

Staff Response:

There are currently no requirements for a proposed development to meet any of the LEED building standards or sustainable design.

 

Comment:

HOUSING

·        While the proposed development will increase population density in the area, the proposed sizes and configuration of the apartments suggest the building will not attract many families— and few, if any, young families. 

·        The residents who will lose their homes because of the demolition are unlikely to be housed in the new building.

·        Although this proposal is for a condominium-type ownership structure, 25% of downtown condo units are purchased as rental units. The people who will buy/rent these units will most likely be students or young singles/couples who are just passing through a stage in their life before moving on.

 

Staff Response:

The Department encourages a mix of housing in each new development proposal however there is no mechanism to require an applicant to provide a certain ratio of one, two and three-bedroom units in a residential building.

 

Comment:

INTENSIFICATION/COMPATIBILITY

  • We support an incremental approach to infill and we acknowledge there is great potential to first build to current standards before rezoning for larger, out of scale projects.
  • The proposal represents intensification of more than fivefold from less than 20 families to more than 100.
  • Any intensification should be consistent with and strengthen the current livability of the neighbourhood through the promotion of pedestrian-friendly entrances that bring people onto the street and into our parks.
  • The Claridge proposal presents a scenario of overdevelopment that will disrupt a stable residential neighbourhood. While a more compact city is a necessary and valuable goal, any intensification must avoid producing serious drawbacks while maximizing potential benefits.
  • Many intensification projects have been undertaken in the immediate area under the existing by-laws.
  • We want to stress that we are not against intensification in the Lowertown area. If this developer wants to demolish the houses to build condos that respect the zoning limits, we may find it regrettable from a heritage perspective, but it remains the prerogative of the owner. However, we are strongly opposed to any zoning amendments and we question the setbacks for which Claridge is applying.

 

Staff Response:

The Department is of the opinion that the existing R4T zoning can provide opportunities for redevelopment however this proposal is a modest increase in the height and reductions of setbacks and thus the impacts between the existing potential development of these properties in the R4T zone and what is proposed is acceptable. A detailed discussion regarding the proposal in relation to intensification and compatibility is contained in the body of this report.


 

Comment:

  • There is nothing that we saw in the proposal to provide something back to the neighbours (including our family) who will face greater stress and usage in community amenities, such as use of the park, traffic on the street, more limited parking spaces for guests, etc. Frankly, we would have preferred a mixed commercial-residential use that might have had a coffee shop, yoga studio, etc. incorporated into it. It seems to us part of the advantage of densification and the set-off for increased use of the park (not to say the shading of it) should be increased amenities.

 

Staff Response:

The proposal has not included any non-residential uses however the Department notes that the General Urban designation does contemplate the inclusion of some mixed uses in residential buildings.

 

COMMUNITY ORGANIZATION COMMENTS

LOWERTOWN COMMUNITY ASSOCIATION

 

On behalf of the Lowertown Community Association, I respectfully submit the following views relating to the most recent Zoning By-law Amendment and Site Plan control application for the 5-storey condominium development on 316-330 Bruyère Street. 

 

We appreciate that the proposal has been revised to better fit, in terms of height, with the surrounding community and that the developer accepted to present it to area residents at one of our monthly community meetings. However, we are concerned that the proposal does not meet current zoning bylaws and by the precedent we believe this would set for future developments in our community. Further, I would highlight that a large group of residents have indicated that the development would involve the demolition of buildings which they perceive as having important heritage value to the community and that the proposed development does not seek to maintain them or reflect their architecture. On a related note, we would like to draw your attention to the attached heritage report developed by area residents which explains that there is heritage value in that part of Lowertown that is not appropriately recognized in the city's plan. Let me take the opportunity to express my appreciation again for your engagement with the community on this matter. 

 

Principles by the Lowertown Community Association

 

  • We are open to new residential developments in our community.
  • We urge developers to propose developments that meet existing bylaws (e.g. regarding building height) and are very concerned with the precedent that could be set by changing these bylaws.
  • Proposed developments should seek to fit in the existing community both in terms of size and in terms of architecture.
  • We are concerned with developments that involve the demolition of buildings with heritage value to the community.
  • We encourage developers to make a certain proportion of their development affordable housing and stress the importance of ensuring that residents are not forced out of our community.
  • We are open to working with developers to seek solutions and incentivize best practices that are amenable to the community - including promoting developments that are in line with the character of the neighbourhood and that meet the highest standards for energy efficiency and sustainable building practices.
  • We support the residents’ initiative (led by William Murray) to organize and express their views on the proposed development on 316-330 Bruyère street

 

Staff Response:

The issues raised by the Community Association have been addressed in the body of the report and in the staff responses to issues that were raised by the public comments.

 


Planning Committee

Minutes 16

28 June 2011

Comité de l’URBANISME

PROCÈS-VERBAL 16

le 28 Juin 2011

 

 

ZONING – 316 TO 324 BRUYÈRE STREET AND 317 TO 321 ST. ANDREW STREET

ZONAGE – 316 À 324, RUE BRUYÈRE ET 317 À 321, RUE ST-ANDREW

ACS2011-ICS-PGM-0085                                                         RIDEAU-VANIER (12)

 

(This matter is Subject to Bill 51)

 

REPORT RECOMMENDATION

 

That the Planning Committee recommend Council approve an amendment to the Zoning By‑law 2008‑250 to change the zoning of 316 to 324 Bruyère Street and 317 to 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N (xxxx) (Residential Fifth Density Zone, Subzone N, Exception xxxx) as shown on Document 1 and as detailed in Document 2.

 

Committee received the following written submissions with respect to this matter, copies of which are held on file with the City Clerk:

 

·                Various E-mails and Letters from the Lowertown Community Association (c/o Marc Aubin)

·                Report by Marc Aubin and Nancy Chenier  entitled “Lowertown East Our Disappearing Heritage”

·                Various Submissions from the Bruyère Street Rezoning Task Force (c/o William Murray)

·                E-mails dated 21 and 27 June 2011from Wylie Stewart

·                E-mail dated 27 June 2011from Bill Salminen

·                Letter dated 27 June 2011from Grant Seal, David Griffin and Wei-Chun Ling, and Ruth Rodger

·                E-mail dated 26 June and Comment Sheet dated 28 June 2011from Natalia Chenier

·                Letters dated 24 June and 24 May 2011from Nancy Miller Chenier, John Chenier and Natalia Chenier

·                E-mails dated 24 and 27 June 2011from Amanda Garay

·                E-mail dated 27 June 2011from Elaine and Joel Weiner

·                E-mails dated 11 January and 5 May 2011from Rick Koenders 

·                E-mail and letter dated 24 and 27 June 2011from Selena Fraser

·                E-mails and letters dated 24 January, 12 April, 22 and 27 June 2011from John Chenier

·                E-mails and letter dated 24, 27 and 28 June 2011from Stuart Savage

·                E-mails dated 24 and 27 June 2011from Rhiannon Vogl

·                E-mails dated 24 and 27 June 2011from Michael Simon

·                E-mails dated 24 and 27 June 2011from Megan Furi

·                E-mail dated 24 June 2011from Liz MacKenzie

·                E-mails dated 24 and 30 June 2011 from Liz Brandon-Williams

·                E-mails dated 24 and 26 June 2011from Ian Burgess

Planning Committee

Minutes 16

28 June 2011

Comité de l’URBANISME

PROCÈS-VERBAL 16

le 28 Juin 2011

·                                                                                                                                     

 

·                E-mails from dated 22 and 23 June 2011 from Drew Shantz

·                E-mails dated 22 and 26 June 2011from Christine Harrison

·                E-mail dated 20 June 2011from Elaine Sigler

·                E-mail dated 21 June 2011from Nathaniel Davis

·                E-mail dated 24 June 2011from Jen Peirce.

·                E-mail dated 27 June 2011from Nicole Boilard

·                E-mail dated 27 June 2011from Adam Barbolet

·                E-mails dated 21 and 27 June 2011 from Wylie Stewart.

At the outset, two motions of deferral were introduced, as set out below. Therefore Committee did not consider the substance of the matter.

 

Committee heard from the following public delegations, on the matter of deferral:

 

William Murray, Bruyère Street Rezoning Task Force spoke in favour of deferring the matter to September 2011, and did not feel deferral to August would be sufficient.

 

Jodi Murray, also spoke in favour of deferring the matter to September 2011 rather than August. 

 

Joel Weiner also spoke in favour of deferring the matter to September 2011 rather than August.

 

Jim Burghout, on behalf of the applicant, Claridge Homes, indicated that he would support deferral to August, but would not support deferral to September

 

The following individuals were present to speak in opposition to the application.  They indicated their support for deferral, but reserved their comments for when the substantive matter would be before Committee: Marc Aubin, Selena Fraser, Adam Barbolet, John Chenier, Nancy Chenier, Ruth Rodger, Stuart Savage.

 

The following motions were introduced:

 

MOTION NO PLC 16/5

 

Moved by Councillor R. Bloess

 

That the report be deferred to the Planning Committee meeting of 27 September 2011.


 

Planning Committee

Minutes 16

28 June 2011

Comité de l’URBANISME

PROCÈS-VERBAL 16

le 28 Juin 2011

 

 

 

MOTION NO PLC 16/6

 

That Planning Committee recommend Council direct Planning Committee and Council to consider this application on August 15 and August 24 respectively.

 

CARRIED, on a division of 8 yeas and 1 nay, as follows:

 

YEAS (8):       Councillors S. Blais, R. Chiarelli, K. Hobbs, A. Hubley, B. Monette, S. Qadri, J. Harder, P. Hume.

 

NAYS (1):      Councillor R. Bloess.

 

As Motion PLC 16/6 was approved, motion PLC 16/5 was no longer in order.

 

The application was deferred to the 12 August 2011 Planning Committee meeting by means of Motion PLC 16/6

 


ZONING – 316 TO 324 BRUYÈRE STREET AND 317 TO 321 ST. ANDREW STREET

ZONAGE – 316 À 324, RUE BRUYÈRE ET 317 À 321, RUE ST-ANDREW

ACS2011-ICS-PGM-0085                                                         RIDEAU-VANIER (12)

 

Deferred from the Planning Committee meeting of 28 June 2011

 

(This matter is Subject to Bill 51)

 

REPORT RECOMMENDATION

 

That the Planning Committee recommend Council approve an amendment to the Zoning By‑law 2008‑250 to change the zoning of 316 to 324 Bruyère Street and 317 to 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N (xxxx) (Residential Fifth Density Zone, Subzone N, Exception xxxx) as shown on Document 1 and as detailed in Document 2.

 

In addition to correspondence received prior to the 28 June 2011 meeting, Committee received the following additional written submissions:

 

·         Letter dated 14 August 2011 from Marc Aubin, with the following supporting documents:

o   OBHAC Presentation - Lowertown East

o   Report 1 - Lowertown East - Our Disappearing Heritage

o   Report 2 - Lowertown East - Heritage Options

o   News Clippings

·         E-mail dated 14 August 2011 from Janet M. Hugli

 

Committee considered this item in conjunction with the associated report from the Ottawa Built Heritage Advisory Committee (Item 3 - Designation of the “Gauvreau” Rowhouse, 324-334 Bruyère Street, Under Part IV of the Ontario Heritage Act - ACS2011-CCV-OBH-0002)

 

Committee heard from the following public delegations:

 

Jodi Murray spoke on behalf of the Bruyère Street Task Force.  She thanked Councillors Hume and Harder for their work representing and working with the community on the application, and coming to a compromise agreement on the Zoning, and looked forward to further work on the Site Plan issues.  She also thanked the other Planning Committee members who had taken the time visit the neighbourhood.

 

On the issue of heritage, she indicated that the Task Force consented to the forthcoming motion from Councillor Harder, and was acquiescing on the matter of designation in recognition that the proper process had not been followed, and in the interests of moving the file forward. However, there was remaining concern in the community that the City’s process was disjointed and was resulting in the loss of four valuable buildings. 

She noted that two of the buildings were on the national heritage inventory, and the remaining were on the Ottawa inventory.  She suggested the inability to save these buildings called into question to the meaning of those inventories.

 

She also raised the outstanding concern in the community about the long-term tenants of the existing houses, and how they would transition to a new affordable home. Ms. Murray expressed support for Councillor Harder’s motion to use cash-in-lieu of Parkland funds for transition assistance. 

 

John Chenier, also a member of the Bruyère Street Task Force, spoke as an individual as a resident of Cathcart Street.  He reviewed his concerns with the rationale behind the staff recommendation and the planning process.  While he indicated his agreement with the compromise that had been negotiated, de maintained that staff should never have recommended an R5 Zoning and the community should never have been put in the position it was.  His comments were outlined in a PowerPoint presentation, a copy of which is held o

 

Elizabeth MacKenzie was also present in opposition to the report recommendations as presented, but did not need to speak in light of the submissions from previous speakers. 

 

Nancy Miller Chenier, resident of Cathcart Street, provided some historical background on the area in question, suggesting that the buildings to be demolished for the new development represented the history of Lowertown and of a founding part of Ottawa.  She sought the Committee’s support to assist residents in reclaiming and preserving an important part of Ottawa’s heritage.  A copy of Ms. Miller Chenier’s more detailed comments is held on file with the City Clerk and Solicitor’s office.

 

Adam Barbolet, resident of Bruyère Street, indicated his concurrence with the agreement that had been reached by the community.  However, he suggested that Ottawa’s planning process was broken.  He spoke of how the demolition of the existing buildings represented a loss of 20 affordable rental units. He noted the low rental vacancy rate, the fact that only a small percentage of new builds were for rental units, the large number of renters living in unaffordable accommodations and the long waiting list for social housing in Ottawa.  He expressed concern that the City, developers and community were in a position where they were allowed to agree to the demolition of these affordable rental housing units given these factors, the Provincial Policy Statement requirements and the City’s own policies for the provision of affordable housing.

 

Ted Fobert, FoTenn Consultants Inc.; Doug Hardie, Architect and Paul Webber, Bell Baker LLP were present for the applicants in support of the application.

 

 

MOTION NO PLC 18/1

 

Moved by Councillor J. Harder:

 

WHEREAS report ACS2011-ICS-PGM-0085 recommends zoning changes to the lands known municipally as 316 to 324 Bruyére Street and 317 to 321 St. Andrew Street;

 

AND WHEREAS through discussions with residents of the community, it has been deemed advisable to make certain changes to the zoning provisions to further the built form transition between the proposed building and surrounding areas and address parking requirements as a result of these building modifications;

 

BE IT RESOLVED that the following changes be made to the staff report:

 

1.         The recommendation be replaced with the following:

 

That the Planning Committee recommend Council approve an amendment to the Zoning By law 2008 250 to change the zoning of 316 to 324 Bruyère Street and 317 to 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N (1856) S270 (Residential Fifth Density Zone, Subzone N, Exception 1856, Schedule 270) as shown on Document 1 and as detailed in Document 2.

 

2.         Document 2 be replaced with the following:

 

DETAILS OF RECOMMENDED ZONING                    DOCUMENT 2

 

Proposed Changes to the Comprehensive Zoning By-law

 

1.         The Zoning Map of City of Ottawa Zoning By-law 2008-250 is amended by changing the zoning of the lands known municipally as 316, 318, 324 Bruyère Street and 317, 321 St. Andrew Street from R4T (Residential Fourth Density Zone, Subzone T) to R5N [1856] S270 (Residential Fifth Density Zone, Subzone N, Exception 1856, Schedule 270);

 

2.         Add the attached Schedule as a new Schedule to Part 17 of the by-law.

3.         Add a new exception [1856] in Section 239 including the following provisions:

 

Column V: Provisions:

 

(1)         The maximum permitted building height and number of storeys for an apartment dwelling, mid-high rise are set out on Schedule 270;

(2)         Minimum width of a driveway providing access to a parking garage: 6.2 metres;

(3)         Minimum aisle width providing access to parking spaces in a parking garage: 6.2 metres;

(4)         Minimum visitor parking rate for an apartment building, mid-high rise: none for the first 12 dwelling units and 0.083 spaces per unit thereafter.

(5)         Minimum yard setbacks are set out on Schedule 270.

 

That there be no further notice pursuant to Section 34 (17) of the Planning Act.

                                                                                                            CARRIED

 

MOTION NO PLC 18/2

 

Moved by Councillor J. Harder:

BE IT RESOLVED THAT the following recommendations be added:

2.         The contribution to cash-in-lieu of parkland in respect of the development be reduced by 40%;

3.         The reduction be attributed to the amount that would have otherwise been deposited to the credit of the Ward 12 cash-in-lieu of parkland account;

4.         An amount, as estimated by the General Manager, Planning and Growth Management, equivalent to the reduction in Recommendation 2 above be paid by Claridge to an account to provide for funding assistance for long term residents (more than 20 years) to find alternative accommodation.

5.         The allocation of the funding pursuant to Recommendation 4 be subject to the direction of the General Manager, Community and Social Services Department, subject to the concurrence of the Chair of Planning Committee.

 

The report recommendations were put to Committee and CARRIED, as amended