This site uses JavaScript. Please enable JavaScript in your Browser and reload the page to view the full site.

Parkway Park

Project Status: 
Underway

Parkway Park redevelopment

Parkway Park is being redeveloped. The wading pool and field house will be removed. A new splash pad and new play equipment will be incorporated into the new design. Design will take place fall 2019 and park redevelopment will be 2020. The park will not be open for use during the demolition and construction.

The community is invited to provide comments on the proposed concept plan, as shown below.

Option 1 [ PDF - 1.96 MB ]
Option 2 [ PDF - 2.60 MB ]
Splash pad [ PDF - 7.64 MB ]

If you wish to provide comments please send, no later than October 14, 2019 to the Park Planner listed below.

Update: April 22, 2020

Below is a summary of the public engagement. The final design has taken these comments into consideration

  1. Overall design - Option A is preferred
  2. Play equipment - Option A is preferred, more overhead climbing elements requested
  3. Swings - request separate tall set of swings
  4. Splash pad - option 2 is preferred
  5. Puddle rink - required separate from splash pad
  6. Noise is a problem consider noise mitigation such as larger, longer berms and more tree planting

Contact

Jennifer Shepherd
Team lead
Recreation Culture and Facility Services, Parks and Facilities Planning
City of Ottawa
Jennifer.shepherd@ottawa.ca
613-580-2424 ext. 13771