Through this search tool you can access information on current road closures and detours due to construction and/or special events. Dates and times provided below may change due to weather conditions and other factors affecting construction. Although this list is intended to be comprehensive, unavoidable emergency closures and minor closures are not listed.

To begin, simply choose the appropriate search field or enter a keyword and "search". The option is also available to view all activities.

by Keyword:
by Date: between

and
by Traffic Impact:
by Activity Type:
by Ward:

All current projects:


All Activities

Found 135 Results.


Activity Location  Date Time  Project Impact and Description Ward
Special Event
Ottawa Farmers' Market at Brewer Park 
Sloan Avenue between Hopewell Avenue and a point approximately 200 metres south of Hopewell Avenue, Sloan Avenue between Hopewell Avenue and Sunnyside Avenue, and Hopewell Avenue between Sloan Avenue and Brewer Way.  Sunday, May 4 to Sunday, November 16, 2014
8 a.m. to 3 p.m. Sundays only 
Low
Road closures in effect  
17 
Special Event
Alcatel Sunday Bikedays  
Sir John A. MacDonald Parkway – Westbound lanes on the south side of the Ottawa River and west of downtown from Vimy Place (War Museum) to Carling Avenue Colonel By Drive – Both lanes located on the east side of the Rideau Canal from Laurier Bridge to Hogs Back Bridge Rockcliffe Parkway – Both lanes running along the south side of the Ottawa River just east of downtown from the Aviation Parkway to St. Joseph Boulevard (Orleans)   Monday, May 19 to Monday, September 1, 2014
9 a.m. to 1 p.m. 
High
Lane closures. Parkways closed to motor vehicles every Sunday morning from Victoria Day weekend to Labour Day (May 21 to September 2) 
 
Special Event
Glebe Neighbourhood Activities Group 
Lyon Street South between Second Avenue and Third Avenue  Thursday, July 31, 2014
noon to 5 p.m. 
Low
Street closures in effect 
17 
Special Event
International Busker Festival 
Metcalfe Street between Queen Street and Wellington Street, and O’Connor Street between Queen Street and Wellington Street   Friday, August 1 to Monday, August 4, 2014
Friday, August 1 from 6 p.m. to midnight; Saturday, August 2 from 9 a.m. to midnight; Sunday, August 3 from 9 a.m. to midnight; Monday, August 4 from 9 a.m. to 8 p.m. 
Low
Street closures in effect 
12, 14 
Special Event
National Capital Triathlon 
Hog's Back Road between Prince of Wales Drive and Riverside Drive  Saturday, August 2, 2014
6 a.m. to 3 p.m. 
Medium
Road closure in effect 
16 
Special Event
Sound of Light - Casino du Lac-Leamy  
Alexandra Bridge, St. Patrick Street at Mackenzie Avenue, Murray Street at Mackenzie Avenue, and Lady Grey Drive at Sussex Drive  Saturday, August 2, 2014
8 p.m. to 10 p.m. 
Medium
Bridge and street closures in effect 
12, 14 
Special Event
Sound of Light - Casino du Lac-Leamy  
Alexandra Bridge, St. Patrick Street at Mackenzie Avenue, Murray Street at Mackenzie Avenue, and Lady Grey Drive at Sussex Drive  Wednesday, August 6, 2014
8 p.m. to 10 p.m. 
Medium
Bridge and street closures in effect 
12, 14 
Special Event
Sound of Light - Casino du Lac-Leamy  
Alexandra Bridge, St. Patrick Street at Mackenzie Avenue, Murray Street at Mackenzie Avenue, and Lady Grey Drive at Sussex Drive  Saturday, August 9, 2014
8 p.m. to 10 p.m. 
Medium
Bridge and street closures in effect 
12, 14 
Special Event
Sound of Light - Casino du Lac-Leamy  
Alexandra Bridge, St. Patrick Street at Mackenzie Avenue, Murray Street at Mackenzie Avenue, and Lady Grey Drive at Sussex Drive  Wednesday, August 13, 2014
8 p.m. to 10 p.m. 
Medium
Bridge and street closures in effect 
12, 14 
Special Event
Sound of Light - Casino du Lac-Leamy  
Alexandra Bridge, St. Patrick Street at Mackenzie Avenue, Murray Street at Mackenzie Avenue, and Lady Grey Drive at Sussex Drive  Saturday, August 16, 2014
8 p.m. to 10 p.m. 
Medium
Bridge and street closures in effect 
12, 14 
Special Event
Cruising St. Joseph Night 
Jeanne d’Arc Boulevard South between St. Joseph Boulevard and Youville Drive, Youville Drive between Jeanne d’Arc Boulevard South and St. Joseph Boulevard, St. Joseph Boulevard between Youville Drive and Prestone Drive, Prestone Drive between St. Joseph Boulevard and Centrum Boulevard, and Centrum Boulevard  Monday, August 4, 2014
7 p.m. to 8 p.m. 
Medium
Street closures in effect 
1, 2 
Construction
Facilitating building repairs 
Albert Street between Metcalfe Street and O'Connor Street  Thursday, May 1 to Friday, August 1, 2014
 
Low
Lane reductions in effect. Sidewalk on south side closed. Medium impact for pedestrians  
14 
Construction
Sewer work 
Albert Street between City Centre and Booth Street   Monday, June 9 to Friday, October 31, 2014
 
High
Street reduced to one lane in each 
14 
Construction
Road resurfacing 
Albert Street between Elgin Street and Empress Avenue   Monday, July 21 to Monday, September 1, 2014
 
Medium
Albert Street reduced to two lanes (one for bus & one for vehicles) during weekday off-peak hours (9 a.m. to 3 p.m.) and, reduced to one lane weekday nights after (7 p.m.) and on weekends 
14, 23 
Construction
Watermain installation 
Albion Road between Findlay Creek Drive and Leitrim Road   Monday, May 26 to Friday, October 31, 2014
 
Medium
Intermittent lane reductions 
22 
Construction
Road resurfacing 
Albion Rd between 90 metres north of Tullamore Street and 200 metres north of Lester Road   Wednesday, July 9 to Friday, September 26, 2014
 
Medium
Off-peak lane reductions 
10, 22 
Construction
Road rehabilitation 
Albion Road between Lester Road and Mitch Owens Road   Wednesday, July 9 to Saturday, November 15, 2014
9:30 a.m. to 3:30 p.m. 
Medium
Off-peak lane reductions 
10, 11, 22 
Construction
Road rehabilitation 
Apple Orchard Road between Manotick Station Road and Stagecoach Road   Friday, July 18 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
10, 22 
Construction
Road rehabilitation 
Banff Avenue between Kitchener Avenue and 100 metres north of Ledbury Avenue  Thursday, July 10 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
16 
Construction
Lansdowne Park redevelopment 
Bank Street between Echo Drive and Holmwood Avenue   Monday, November 19, 2012 to Thursday, July 31, 2014
 
High
Bank Street reduced to one lane in the northbound direction 
17 
Construction
Bank Street/Kemp Road intersection modifications 
Bank Street between Leitrim Road and Davidson/Lester Roads   Wednesday, June 18 to Friday, September 26, 2014
 
Medium
Intermittent lane reductions 
10 
Construction
Culvert replacement  
Bank Street between Queensdale Avenue and Lester Road  Thursday, July 3 to Friday, August 29, 2014
 
Medium
Street reduced to one lane in each direction 
10 
Construction
Construction and road resurfacing  
Baseline Road between Woodroffe Avenue and Prince of Wales Drive   Tuesday, May 20 to Thursday, October 30, 2014
9 a.m. to 3:30 p.m. (off peak) and 6 p.m. to 7 a.m. (overnight) 
High
Road reduced to one lane in each direction during off-peak and overnight hours 
8 
Construction
Construction of Confederation Line Light Rail Project 
Belfast Road between Trainyards Drive and Tremblay Road  Tuesday, May 20, 2014 to Monday, May 16, 2016
 
High
Road closed 
18 
Construction
OLRT construction 
Belfast Road between Coventry Road and Tremblay Road  Monday, June 2, 2014 to Thursday, January 15, 2015
 
High
Road closed. Motorists are advised to detour on St. Laurent Boulevard. Signs have been posted advising the public of the detour 
13, 18 
Construction
Road rehabilitation 
Bell Street between Norway Spruce Street and Stitsvile Main Street   Monday, July 7 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
6 
Construction
Road rehabilitation 
Beverly Street between 100 metres west of Stitstville Main Street and 50 metres west of Birdstone Avenue  Wednesday, July 2 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
6 
Construction
Birchgrove Road Bridge Renewal 
Birchgrove Road between French Hill Road and Etienne Road  Monday, July 28 to Friday, October 31, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure.  
19 
Construction
Road rehabilitation 
Burnbank Road between Dead End and Grenfell Crescent   Monday, July 14 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
9 
Construction
Culvert replacement  
Burton Road between North Russell Road and Eadie Road  Monday, July 14 to Monday, August 11, 2014
 
Low
Road closed. Detour signage in place  
19 
Construction
Road rehabilitation 
Canter Boulevard between Withrow Avenue and Elmbank Crescent  Monday, July 14 to Friday, August 15, 2014
 
Low
Intermittent lane reductions 
8 
Construction
Intersection modifications 
Carling Avenue at Richmond Road   Monday, June 16 to Friday, August 29, 2014
 
Medium
Lane reductions 
7 
Construction
Road rehabilitation 
Carling Avenue between Burke Road (50 metres west of CN Underpass) and Rifle Road (50 metres northeast of CN Underpass)  Saturday, July 19 to Friday, August 15, 2014
 
High
Intermittent lane reductions 
7 
Construction
Bridge rehabilitation 
Carp Road Overpass at Highway 417  Friday, May 2 to Friday, October 31, 2014
 
High
Road reduced to one lane. Northbound and southbound traffic controlled by a temporary traffic signal 
5, 21 
Construction
Road rehabilitation 
Carp Road between Richardson Side Road and Donald B Munro Drive  Monday, June 9 to Friday, October 17, 2014
 
Medium
Intermittent lane reductions 
5 
Construction
Road rehabilitation 
Century Road between McCordick Road and Bowrin Road  Tuesday, July 15 to Friday, August 29, 2014
 
Medium
Intermittent lane reductions 
21 
Construction
Road rehabilitation 
Church Sreet between McCordick Road and Lenida Drive North  Thursday, July 10 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
21 
Construction
Integrated Road Rehabilitation 
Churchill Avenue southbound between Byron Avenue and Clare Street  Monday, March 3 to Friday, October 3, 2014
 
Medium
Road closure in effect 
15 
Construction
Integrated Road Rehabilitation 
Churchill Avenue southbound between Clare Street and Carling Avenue  Monday, March 3 to Friday, August 1, 2014
 
Medium
Road closure in effect 
15 
Construction
Mobile crane set-up 
Clarence Street between ByWard Market Square and Sussex Drive  Wednesday, August 6, 2014
7 a.m. to 1 p.m. 
Low
Road closure in effect 
12 
Construction
Rideau Centre Expansion 
Colonel By Drive between Daly Avenue and Rideau Street  Wednesday, July 2 to Friday, December 19, 2014
 
Medium
Northbound lane reduction 
12 
Construction
Road rehabilitation 
Corkstown Road between March Road and Moodie Drive  Thursday, July 10 to Friday, August 15, 2014
 
Low
Intermittent lane reductions 
7 
Construction
Watermain installation 
Coventry Road between Lola Street and St. Laurent Boulevard   Monday, May 19 to Saturday, December 20, 2014
 
High
Road reduced to one lane in each direction 
13 
Construction
Facilitating new building construction 
Cumberland Street between Besserer Street and Rideau Street  Monday, April 14, 2014 to Tuesday, April 14, 2015
 
Low
Lane reductions in effect. Sidewalk on east side closed. Medium impact for pedestrians  
12 
Construction
Facilitating new building construction 
Dalhousie Street between York Street and George Street  Monday, April 14, 2014 to Thursday, October 1, 2015
 
Medium
Lane reductions in effect 
12 
Construction
Repairing and replacing sanitary and water service 
Dawson Avenue between Iona Street and Wesley Avenue  Thursday, July 31 to Friday, August 1, 2014
 
Low
Road closed 
15 
Construction
Storm sewer improvements 
Dundegan Drive between Glamorgan Drive and Glamorgan Drive  Monday, July 21 to Friday, October 17, 2014
 
Low
Road closed 
23 
Construction
Bridge rehabilitation 
Eagleson Road Overpass at Highway 417  Sunday, May 11 to Friday, October 31, 2014
 
Medium
Road reduced to one northbound lane 
4, 23 
Construction
Gas pipeline replacement 
Falcon Brook Road between Rushing Brook Drive and Gentry Road  Monday, July 28 to Friday, August 29, 2014
 
Low
Road closed 
5 
Construction
Construction of a single-lane roundabout at the intersection 
Fernbank Road between Shea Road and Liard Street   Monday, June 9 to Thursday, August 28, 2014
 
Medium
Intermittent lane reductions. Flag person onsite during weekday construction hours to direct traffic 
21 
Construction
Integrated road and utilities reconstruction 
First Avenue between Bronson Avenue and Percy Street  Monday, July 21 to Wednesday, October 15, 2014
 
Low
Road closed 
17 
Construction
Integrated road and utilities reconstruction 
First Avenue between Bank Street and O'Connor Street  Monday, August 11 to Saturday, November 1, 2014
 
Low
Road closed 
17 
Construction
Road rehabilitation 
First Line Road between Roger Stevens Road and Bankfield Road  Wednesday, June 4 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
21 
Construction
Gladstone Avenue Reconstruction  
Gladstone Avenue between Elgin Street and Cartier Street  Monday, June 2 to Friday, August 29, 2014
 
Low
Road closure in effect.Avenue converted to permit two-way traffic 
14 
Construction
Gladstone Avenue Reconstruction  
Gladstone Avenue between Elgin Street and Metcalfe Street  Monday, May 5 to Friday, August 1, 2014
 
High
Road closure in effect. Signed detour to direct motorists around the closure. Transit will be detoured. 
14 
Construction
Gladstone Avenue Reconstruction  
Gladstone Avenue between Bank Street and Metcalfe Street  Monday, April 14 to Friday, September 12, 2014
 
High
Road closed. Signed detour to direct motorists around the closure. Transit service is detoured. 
14 
Construction
Mobile crane set-up 
Hanbury Street between Albany Drive and Ainsley Drive  Tuesday, July 29, 2014
 
Low
Road closed 
8 
Construction
Road rehabilitation 
Harvest Grove Drive between Civic #6572 and Civic #6578  Friday, July 18 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
10, 22 
Construction
Bridge rehabilitation 
Heron Road Overpass to Bronson Avenue  Saturday, March 15 to Sunday, August 31, 2014
 
Medium
Road reduced to one lane 
17 
Construction
Highway 417 widening 
Highway 417 West between Eagleson Road and Highway 7  Friday, May 2 to Friday, October 31, 2014
 
Medium
Intermittent lane reductions 
5, 21 
Construction
Installation of new sanitary sewer and connection of four new site services  
Hobin Street between Stittsville Main Street and Ember Glow Court  Monday, July 21 to Friday, August 8, 2014
 
Low
Road closed 
6 
Construction
Barrhaven Feedermain Project 
Holitman Drive between Foxfield Drive and Thare Crescent  Monday, July 14 to Friday, August 29, 2014
 
Low
Road closed 
3 
Construction
Widening work  
Hunt Club Road between Airport Parkway and Bank Street  Monday, July 7 to Tuesday, October 28, 2014
 
Medium
Nightly lane reductions 
10, 16 
Construction
Installation of storm sewer and road construction for realignment 
Huntmar Drive between Palladium Drive North and Cyclone Taylor Boulevard   Monday, June 9 to Monday, September 15, 2014
 
Medium
Road closed. Signed detour to direct motorists around the closure 
6 
Construction
Road rehabilitation 
Huron Avenue between Dead End and 170 metres north of Dead End  Monday, July 14 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
15 
Construction
Road resurfacing 
Industrial Road between Alta Vista Drive and Russell Road  Thursday, July 3 to Wednesday, July 30, 2014
9 a.m. to 3:30 p.m. 
Medium
Lane reductions during off-peak hours with possible reductions at night 
18 
Construction
Enbridge Gas installation 
Innes Road between Hwy 417 and Blair Road  Tuesday, April 22 to Friday, August 29, 2014
 
Medium
Intermittent lane reductions 
2, 11 
Construction
Mobile crane set-up 
Irving Avenue between Wellington Street and Laurel Street  Thursday, July 31, 2014
 
Low
Road closed 
15 
Construction
Orleans Watermain Link East – Phase 1 
Jasmine Crescent South between Ogilvie Road and Arrowsmith Drive  Thursday, July 3 to Wednesday, July 30, 2014
 
Low
Road closed 
11 
Construction
Orleans Watermain Link East – Phase 1 
Jasmine Crescent North between Ogilvie Road and Beaverhill Drive  Thursday, July 31 to Friday, August 15, 2014
 
Low
Road closed 
11 
Construction
Road rehabilitation 
Jonathan Pack Street between Abbott Street West and Beverly Street  Friday, July 4 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
6 
Construction
Road, sewer and watermain reconstruction 
Kerr Avenue between Rex Avenue and Broadview Avenue  Monday, June 2 to Friday, October 3, 2014
 
Low
Road closed 
15 
Construction
Rockcliffe Park Reconstruction - Project 
Lakehurst Road between Cloverdale Road and Lansdowne Road North  Monday, July 14 to Friday, August 29, 2014
 
Low
Road closed 
13 
Construction
Mobile crane set-up 
1) Laxton Crescent between Joyce Crescent and Joyce Crescent; 2) Laxton Crescent between Joyce Crescent and Navaho Drive   Tuesday, August 5, 2014
 
Low
Road closures in effect, however, both streets will not be closed at the same time 
8 
Construction
Highway 417 expansion project 
Lees Avenue on-ramp (Eastbound)  Thursday, June 13, 2013 to Saturday, April 28, 2018
 
High
On-ramp closed – signage in place 
11 
Construction
Hwy 417 Expansion project - Removing and replacing the Lees Avenue overpass 
Lees Avenue between Chapel Crescent and the east side of 200 Lees Avenue entrance  Monday, June 16 to Monday, September 15, 2014
 
High
Road closed. Detour signage in place for motorists, cyclists and pedestrians 
12, 17 
Construction
Watermain installation 
Leitrim Road between Gilligan Road and Albion Road   Monday, May 26 to Friday, October 31, 2014
 
Medium
Intermittent lane reductions 
10, 22 
Construction
Road rehabilitation 
Leitrim Road between Bowesville Road and Albion Road   Wednesday, July 9 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
10, 22 
Construction
Mobile crane set-up 
1) Lonsdale Road between Dunvegan Road and Justin Avenue, and 2) Dunvegan Road between Lonsdale Road and Eastbourne Avenue  Tuesday, September 16, 2014
 
Low
Road closed 
13 
Construction
Overhead formwork installation on Sussex Drive Bridge 
MacDonald Cartier Bridge and King Edward Avenue  Monday, March 17 to Friday, October 31, 2014
 
Medium
MacDonald-Cartier Bridge and King Edward Avenue reduced to two lanes in each direction between 9:30 a.m. and 3:30 p.m. and reduced to one lane in each direction between 7 p.m. and 6 a.m.  
12 
Construction
Road rehabilitation 
Mayo Avenue between Pineglen Crescent and Greenside Drive  Monday, July 14 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
9 
Construction
Connection of new site services 
Meadowglen Drive between Orleans Boulevard and Windflower Way  Thursday, August 14 to Friday, August 22, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure 
2 
Construction
Road rehabilitation 
McBean Street between Bowrin Road and Ottawa Street  Wednesday, July 16 to Friday, August 29, 2014
 
Medium
Intermittent lane reductions 
21 
Construction
Road rehabilitation 
McCordick Road (two locations) between McKay Road and Lockhead Road  Tuesday, July 22 to Friday, August 29, 2014
 
Low
Intermittent lane reductions 
21 
Construction
Facilitating sidewalk replacement 
Metcalfe Street between Queen Street and Sparks Street  Monday, April 14, 2014 to Tuesday, April 14, 2015
 
Low
Lane reductions in effect. Sidewalk on east side closed. Medium impact for pedestrians  
14 
Construction
Highway 417 expansion project 
Nicholas Street off-ramp (Westbound)  Tuesday, July 9, 2013 to Friday, October 30, 2015
 
High
Off-ramp reduced to one lane – signage in place 
11 
Construction
Highway 417 expansion project 
Nicholas Street off-ramp (Eastbound)  Tuesday, July 9, 2013 to Friday, October 30, 2015
 
High
Eastbound Nicholas Street on ramp reduction to one lane requiring traffic to merge to the left.  
11 
Construction
Rideau Centre Expansion 
Nicholas Street between Rideau Street and Besserer Street   Monday, January 20, 2014 to Sunday, February 28, 2016
 
Low
Northbound lane closed 
12 
Construction
Connection of new storm sewer  
Northwestern Avenue between Premier Avenue and Clearview Avenue  Monday, April 28, 2014 to Friday, May 22, 2015
 
Low
Road closed. During working hours, the contractor will convert the southbound lane to accommodate both north and south bound traffic. During non-working hours, the road will be reopened 
15 
Construction
Facilitating development construction 
O’Connor Street between Wellington Street and Sparks Street   Monday, May 5 to Tuesday, September 30, 2014
 
Medium
Lane reductions in effect 
14 
Construction
Installation of new Orleans Watermain 
Ogilvie Road between Montreal Road and Blair Place  Monday, May 5 to Wednesday, October 15, 2014
 
Medium
Road reduced to one lane in each direction 
11 
Construction
Trim Road realignment 
Old Montreal Road between Dairy Drive and Grand Chêne Cour Du Court  Monday, July 14 to Friday, August 1, 2014
 
Low
Road closed 
1 
Construction
Rockcliffe Park Reconstruction 
Old Prospect Road between Cloverdale Road and Lansdowne Road North  Tuesday, August 5 to Friday, October 17, 2014
 
Low
Road closed 
13 
Construction
New watermain construction 
Olmstead Street between Jeanne Mance Street and McArthur Avenue  Monday, June 30 to Wednesday, July 30, 2014
 
Low
Road closed 
12 
Construction
Sewer replacement 
Oriole Avenue between Oakburn Road and Abbeyhill Drive  Monday, July 21 to Friday, August 15, 2014
 
Low
Road closed 
23 
Construction
Road rehabilitation 
Orville Street between 100 metres east of Stitsville Main Street and Dead End  Friday, July 4 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
6 
Construction
Sewer replacement 
Paddock Way between Sherwood Street and Post Road  Monday, August 11 to Monday, September 15, 2014
 
Low
Road closed 
23 
Construction
Road rehabilitation 
Parkway Road between Stagecoach Road and Old Prescott Road   Friday, July 18 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
10, 22 
Construction
Road rehabilitation 
Pierce Road between Deer Run Place and Malakoff Road  Monday, July 28 to Friday, August 8, 2014
 
Low
Intermittent lane reductions 
21 
Construction
Sewer replacement 
Post Road between Paddock Way and Old Colony Road  Monday, July 21 to Monday, September 15, 2014
 
Low
Road closed 
23 
Construction
Integrated road, sewer and watermain construction 
Princeton Avenue between Denbury Avenue and Brierwood Avenue  Monday, July 14 to Friday, August 29, 2014
 
Low
Road closed 
15 
Construction
Queen Street Watermain Replacement 
Queen Street between Elgin Street and Metcalfe Street  Monday, July 7 to Friday, October 10, 2014
 
High
Road closed. Signed detour to direct motorists around the closure 
14 
Construction
Installation of new sanitary and storm sewers  
Renaud Road between Mer Bleue Road and Glenlivet Avenue.  Tuesday, July 8 to Saturday, August 30, 2014
 
Medium
Road closed. Signed detour to direct motorists around the closure 
2 
Construction
Road, sewer and watermain reconstruction 
Rex Avenue between Carling Avenue and Ernest Avenue  Monday, June 2 to Friday, October 3, 2014
 
Low
Road closed 
15 
Construction
Facilitating new building construction 
Richmond Road between Patricia Avenue and Leighton Terrace  Monday, April 14, 2014 to Monday, June 1, 2015
 
Low
Lane reductions in effect. Sidewalk on south side closed. Medium impact for pedestrians  
15 
Construction
Road rehabilitation 
Rideau Road between Bowesville Road and Albion Road   Friday, July 18 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
10, 22 
Construction
Capital Works Reconstruction 
Rideau Street between Chapel Street and Cummings Bridge  Monday, May 5 to Friday, September 26, 2014
 
High
Street reduced to one lane in each direction.  
12 
Construction
Rideau Centre Expansion 
Rideau Street eastbound between Sussex Drive and William Street  Monday, February 3, 2014 to Tuesday, March 31, 2015
 
Medium
Eastbound reduced to single shared use lane 
12 
Construction
Road rehabilitation 
Rideau Valley Drive between South Dorack Street and Roger Stevens Drive  Wednesday, July 9 to Friday, August 15, 2014
 
Medium
Intermittent lane reductions 
21 
Construction
Road rehabilitation 
Ridgetop Road between Thomas Dolan Parkway and Dunhaven Road  Monday, June 2 to Friday, October 17, 2014
 
Low
Intermittent lane reductions 
5 
Construction
Gas pipeline replacement 
Rushing Brook Drive between Falcon Brook Road and Falcon Brook Road  Monday, July 28 to Friday, August 29, 2014
 
Low
Road closed 
5 
Construction
Intersection and roadway improvements 
Shefford Road between Montreal Road and Canotek Road  Saturday, June 1, 2013 to Friday, August 1, 2014
 
Medium
Intermittent lane reductions 
11 
Construction
Facilitating new building construction 
Slater Street between Bank Street and O'Connor Street  Monday, April 14, 2014 to Thursday, October 1, 2015
 
Low
Lane reductions in effect. Sidewalk on north side closed. Medium impact for pedestrians 
14 
Construction
Facilitating new building construction 
Slater Street between O'Connor Street and Metcalfe Street  Monday, April 14 to Wednesday, October 1, 2014
 
Low
Lane reductions in effect. Sidewalk on north side closed. Medium impact for pedestrians 
14 
Construction
Road resurfacing 
Slater Street between Empress Avenue and Elgin Street   Monday, July 21 to Monday, September 1, 2014
 
Medium
Slater Street reduced to two lanes (one for bus & one for vehicles) during weekday off-peak hours (9 a.m. to 3 p.m.) and, reduced to one lane weekday nights after (7 p.m.) and on weekends 
14, 23 
Construction
Watermain installation 
St. Laurent Boulevard southbound between Cyrville Road and Coventry Road and northbound between Cyrville Road and Lemieux Street  Tuesday, July 29 to Monday, September 15, 2014
 
High
Southbound traffic reduced to one lane and northbound traffic reduced to two lanes 
11 
Construction
Connection of new site services 
Slater Street between Bank Street and O’Connor Street  Saturday, August 9 to Sunday, August 10, 2014
 
Low
Road closed. Signed detour to direct motorists around closure  
14 
Construction
Highway 417 expansion project - St. Laurent Boulevard southbound 
Southbound St. Laurent Boulevard on-ramp to Hwy 417 eastbound   Monday, July 14 to Monday, August 11, 2014
 
High
Ramp closure in effect 
11 
Construction
Highway 417 expansion project - St. Laurent Boulevard northbound 
Northbound St. Laurent Boulevard on-ramp to Hwy 417 westbound   Friday, August 15 to Friday, September 12, 2014
6 a.m. Friday, August 15 to 6 a.m., Friday, September 12 
High
Ramp closure in effect 
11 
Construction
Highway 417 expansion project 
Eastbound St. Laurent off-ramp   Wednesday, July 17, 2013 to Friday, October 30, 2015
 
High
Ramp reduced to one lane 
11 
Construction
Road resurfacing 
St. Patrick Street between King Edward Avenue and Vanier Parkway   Monday, June 9 to Sunday, October 12, 2014
off-peak (9 a.m. to 3:30 p.m.) and overnight (6 p.m. to 7 a.m.) hours 
Medium
Street reduced to one lane in each direction during off-peak and overnight hours 
 
Construction
Watermain installation 
Strandherd Road between Fallowfield Road and Kennevale Drive  Monday, July 14 to Friday, December 19, 2014
 
Medium
Off-peak lane reductions 
3 
Construction
Road reconstruction 
Sussex Drive between St. Patrick Street and King Edward Avenue   Monday, February 24 to Saturday, December 20, 2014
 
High
Reduced to one lane in each direction 
12 
Construction
Facilitate bridge maintenance 
Sussex Drive between Boteler Street and King Edward Avenue   Thursday, July 31 to Friday, August 1, 2014
midnight to 4 a.m. 
Low
The road closed for 15 minute intervals. Ottawa Police will be on-site to assist with traffic control 
12 
Construction
Road rehabilitation 
Terry Fox Drive between Hwy 417 eastbound ramp and Didsbury Avenue  Wednesday, July 30 to Saturday, August 2, 2014
 
Low
Intermittent lane reductions during the night 
4, 23 
Construction
Rehabilitation of Minto Bridges East and Centre 
Union Street between Stanley Avenue and 220 metres west of Stanley Avenue  Monday, December 16, 2013 to Wednesday, September 30, 2015
 
Low
Bridge closed - signed detours in place 
12 
Construction
Highway 417 Expansion Project 
Eastbound Vanier Parkway off-ramp   Wednesday, July 17, 2013 to Friday, October 30, 2015
 
High
Off ramp reduced to one lane 
13 
Construction
Highway 417 Expansion Project 
Westbound Vanier Parkway off-ramp   Wednesday, July 17, 2013 to Friday, October 30, 2015
 
High
Off ramp reduced to one lane 
13 
Construction
Road rehabilitation 
Walgreen Road  Monday, June 2 to Friday, October 17, 2014
 
Low
Intermittent lane reductions 
21 
Construction
OLRT construction 
Waller Street between Laurier Avenue East and Nicholas Street  Friday, July 26, 2013 to Monday, December 31, 2018
 
Low
Road closed 
12 
Construction
Facilitating new building construction 
Wellington Street between Bank Street and O'Connor Street  Monday, April 14, 2014 to Tuesday, April 14, 2015
 
Low
Lane reductions in effect. Sidewalk on south side closed. Medium impact for pedestrians  
15 
Construction
Road rehabilitation 
Westbrook Road between Walgreen Road and Carp Road  Monday, June 2 to Friday, October 17, 2014
 
Low
Intermittent lane reductions 
21 
Construction
Connection of new site services 
Winston Avenue between Whitby Avenue and Madison Avenue  Thursday, July 31 to Tuesday, August 5, 2014
 
Low
Road closed 
15 
Construction
Road rehabilitation 
Willowlea Road between Westbrook Road and Moonstone Road  Monday, June 2 to Friday, October 17, 2014
 
Low
Intermittent lane reductions 
21 
Construction
Rideau Street Renewal: Phase 2 
Wurtemburg Street between Rideau Street and Heney Street  Monday, May 5 to Monday, August 18, 2014
 
Low
Road closed 
12 

[ top ]

For more information

City of Ottawa

  • Construction projects and local traffic issues: 3-1-1 (TTY: 613-580-2401)
  • Public transit alternatives: 613-741-4390 (TTY: 613-741-5280)