Current Roadwork and Street Closures


 
Transit service and fare discounts    Transit service and fare discounts »
Interactive Traffic Map  Interactive Traffic Map »
Seasonal Load Restrictions    Seasonal Load Restrictions »

Through this search tool you can access information on current road closures and detours due to construction and/or special events. Dates and times provided below may change due to weather conditions and other factors affecting construction. Although this list is intended to be comprehensive, unavoidable emergency closures and minor closures are not listed.

To begin, simply choose the appropriate search field or enter a keyword and "search". The option is also available to view all activities.

by Keyword:
by Date: between

and
by Traffic Impact:
by Activity Type:
by Ward:

All current projects:


All Activities

Found 123 Results.


Activity Location  Date Time  Project Impact and Description Ward
Special Event
Ottawa Farmers' Market at Brewer Park 
Sloan Avenue between Hopewell Avenue and a point approximately 200 metres south of Hopewell Avenue, Sloan Avenue between Hopewell Avenue and Sunnyside Avenue, and Hopewell Avenue between Sloan Avenue and Brewer Way.  Sunday, May 4 to Sunday, November 16, 2014
8 a.m. to 3 p.m. Sundays only 
Low
Road closures in effect  
17 
Special Event
March and Demonstrations 
March – east on Wellington/Rideau Street between Parliament Hill (Metcalfe Street entrance; see clause d.) and MacKenzie Avenue, and north on MacKenzie Avenue between Rideau Street and the Embassy of the United States of America, south on MacKenzie Avenue between the Embassy of the United States of America and Rideau Street, east on Rideau Street between MacKenzie Avenue and Wurtemburg Street, and south on Wurtemburg Street between Rideau Street and the Embassy of Turkey (197 Wurtemburg Street). Demonstrations – sidewalk opposite the Embassy of the United States of American (MacKenzie Avenue), and sidewalk opposite the Embassy of Turkey (197 Wurtemburg Street).   Tuesday, September 30, 2014
12:30 p.m. to 1:30 p.m. 
Low
March and demonstrations restricted to sidewalks 
12, 14 
Special Event
March and Demonstration 
March – sidewalks - south on Bank Street between Sparks Street and Laurier Avenue, and east on Laurier Avenue between Bank Street and Metcalfe Street Demonstration – sidewalks – Laurier Avenue between Bank Street and Metcalfe Street   Friday, October 3, 2014
11:30 a.m. to 1 p.m. 
Low
March and demonstration restricted to sidewalks 
12, 14 
Special Event
Sears Great Canadian Run 
NCC pathway along Rockliffe Parkway between the National Aviation and Space Museum and Roslyn Avenue, Roslyn Avenue between NCC Pathway and Hiawatha Park Road, Hiawatha Park between Roslyn Avenue and NCC pathway north of St Louis Drive, NCC pathway north of St Louis Drive between Hiawatha Park Road and Trim Road, Trim Road between NCC pathway north of North Service Road and St-Joseph/Old Montreal Road, Old Montreal Road between Trim Road and Hwy 174, and Hwy 174 between Old Montreal Road and the easterly limits of City of Ottawa (Canaan Road).  Saturday, October 4, 2014
6 a.m. to 10 a.m. 
Low
Run restricted to pathways and sidewalks (or shoulders/roadway where no sidewalks exist) 
1, 2, 11, 13, 19 
Special Event
March and Demonstration 
March – east on Wellington Street between Parliament Hill (Metcalfe Street entrance) and Sussex Drive, north on Sussex Drive between Wellington Street and George Street, east on George Street between Sussex Drive and Dalhousie Street, north on Dalhousie Street between George Street and St. Patrick Street, east on St. Patrick Street between Dalhousie Street and the Embassy of the People’s Republic of China (515 St. Patrick Street). Demonstration – sidewalk opposite the Embassy of the People’s Republic of China (515 St. Patrick Street   Saturday, October 4, 2014
11:30 a.m. to 1 p.m. 
Low
March and demonstration restricted to sidewalks 
12, 14 
Special Event
Religious Procession 
Procession – sidewalks – South on Olmstead Street between Assumption Parish (320 Olmstead Street) and Montreal Road, west on Montreal Road between Olmstead Street and Montgomery Street, south on Montgomery Street between Montreal Road and Selkirk Street, west on Selkirk Street between Montgomery Street and North River Road, north on North River Road between Selkirk Street and Montreal Road, east on Montreal Road between North River Road and Lacasse Avenue, south on Lacasse Avenue between Montreal Road and Blake Boulevard, west on Blake Boulevard between Lacasse Avenue and Lajoie Street, south on Lajoie Street between Blake Boulevard and Jeanne Mance Street, west on Jeanne Mance Street between Lajoie Street and Olmstead Street, and north on Olmstead Street between Jeanne Mance Street and Assumption Parish (320 Olmstead Street).  Saturday, October 4, 2014
1 p.m. to 3:30 p.m. 
Low
Procession restricted to sidewalks 
12, 14 
Construction
Facilitating building repairs 
Albert Street between Metcalfe Street and O'Connor Street  Thursday, May 1 to Friday, October 31, 2014
 
Low
Lane reductions in effect. Sidewalk on south side closed. Medium impact for pedestrians  
14 
Construction
Sewer work 
Albert Street between City Centre and Booth Street   Monday, June 9 to Friday, October 31, 2014
 
High
Street reduced to one lane in each direction 
14 
Construction
Hydro work 
Albert Street between Metcalfe Street and O'Connor Street   Monday, September 29 to Thursday, October 2, 2014
 
Medium
Lane reduction 
14 
Construction
Watermain installation 
Albion Road between Findlay Creek Drive and Leitrim Road   Monday, May 26 to Friday, October 31, 2014
 
Medium
Intermittent lane reductions 
22 
Construction
Road rehabilitation 
Albion Road between Lester Road and Mitch Owens Road   Wednesday, July 9 to Saturday, November 15, 2014
9:30 a.m. to 3:30 p.m. 
Medium
Off-peak lane reductions 
10, 11, 22 
Construction
Construction of Confederation Line Light Rail Project 
Belfast Road between Trainyards Drive and Tremblay Road  Tuesday, May 20, 2014 to Monday, May 16, 2016
 
High
Road closed 
18 
Construction
OLRT construction 
Belfast Road between Coventry Road and Tremblay Road  Monday, June 2, 2014 to Thursday, January 15, 2015
 
High
Road closed. Motorists are advised to detour on St. Laurent Boulevard. Signs have been posted advising the public of the detour 
13, 18 
Construction
Mobile crane set-up 
Besserer Street between Cumberland Street and King Edward Avenue  Tuesday, October 7, 2014
 
Low
Road closed. Police on site to facilitate access to closed portion of street 
12 
Construction
Birchgrove Road Bridge Renewal 
Birchgrove Road between French Hill Road and Etienne Road  Monday, July 28 to Friday, October 31, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure.  
19 
Construction
Blackcreek Road bridge renewal 
Blackcreek Road between Cooper Hill Road and Pana Road  Thursday, April 17 to Friday, October 17, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure.  
20 
Construction
Integrated road, sewer and watermain construction 
Brierwood Avenue between Avondale Avenue and Kenwood Avenue  Monday, September 29 to Tuesday, September 30, 2014
 
Low
Road closed 
15 
Construction
Placement of materials and equipment for miscellaneous on-site and road work 
1) Bronson Avenue between Queen Street and Sparks Street & 2) Sparks Street between Bronson Avenue and Bay Street  Friday, August 15 to Monday, October 20, 2014
9 a.m., Friday, August 15 to Monday, October 20 
Low
Road closed. During closure Sparks Street be converted to permit two-way traffic 
14 
Construction
O Train Expansion project 
Brookfield Multi-use Pathway between Sawmill Creek Pathway and Brookfield Road East  Monday, August 18, 2014 to Friday, October 30, 2015
 
Low
Pathway closed. High impact for cyclists and pedestrians. Low for motorists 
16, 17 
Construction
Bridge rehabilitation 
Carp Road Overpass at Highway 417  Friday, May 2 to Friday, October 31, 2014
 
High
Road reduced to one lane. Northbound and southbound traffic controlled by a temporary traffic signal 
5, 21 
Construction
Replacing the railway crossing 
Carlsbad Lane between Russell Road and Sabourin Road  Sunday, October 12 to Monday, October 13, 2014
8 p.m., Saturday, October 11 to 9 a.m. Sunday, October 12  
Low
Road closed 
19 
Construction
Road rehabilitation 
Central Transitway between 180 metres south of Laurier Avenue and Hurdman Station south end   Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
High
Lane reductions in effect. 
12, 17 
Construction
Integrated Road Rehabilitation 
Churchill Avenue southbound between Byron Avenue and Clare Street  Monday, March 3 to Friday, October 3, 2014
 
Medium
Road closure in effect 
15 
Construction
Rockcliffe Park Reconstruction 
Cloverdale Road between Old Prospect Road and Mariposa Avenue  Monday, August 25 to Friday, November 7, 2014
 
Low
Road closed 
13 
Construction
Connection of new site services 
Cole Avenue between Kenwood Avenue and Ravenhill Avenue  Monday, September 29 to Tuesday, September 30, 2014
 
Low
Road closed 
15 
Construction
Culvert replacement 
Cooper Hill Road between Yorks Corners Road and Blackcreek Road  Thursday, October 2 to Friday, October 3, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure. 
20 
Construction
Rideau Centre Expansion 
Colonel By Drive between Daly Avenue and Rideau Street  Wednesday, July 2 to Friday, December 19, 2014
 
Medium
Northbound lane reduction 
12 
Construction
Watermain installation 
Coventry Road between Lola Street and St. Laurent Boulevard   Monday, May 19 to Saturday, December 20, 2014
 
High
Road reduced to one lane in each direction 
13 
Construction
Rideau Street Renewal 
Cumberland Street between Rideau Street and Besserer Street  Wednesday, August 13 to Friday, October 3, 2014
 
Low
Road closed 
12 
Construction
Facilitating new building construction 
Cumberland Street between Besserer Street and Rideau Street  Monday, April 14, 2014 to Tuesday, April 14, 2015
 
Low
Lane reductions in effect. Sidewalk on east side closed. Medium impact for pedestrians  
12 
Construction
Facilitating new building construction 
Dalhousie Street between York Street and George Street  Monday, April 14, 2014 to Thursday, October 1, 2015
 
Medium
Lane reductions in effect 
12 
Construction
Storm sewer improvements 
Dundegan Drive between Glamorgan Drive and Glamorgan Drive  Monday, July 21 to Friday, October 17, 2014
 
Low
Road closed 
23 
Construction
Bridge rehabilitation 
Eagleson Road Overpass at Highway 417  Sunday, May 11 to Friday, October 31, 2014
 
Medium
Road reduced to one northbound lane 
4, 23 
Construction
Road rehabilitation 
East Transitway between Hurdman Sation North andHwy 417 eastbound off-ramp at St Laurent Blvd   Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
High
Lane reductions in effect. 
18 
Construction
Integrated road, sewer and watermain construction 
Edison Avenue between Tillbury Avenue and Dovercourt Avenue  Monday, August 11 to Friday, December 19, 2014
 
Low
Road closed 
15 
Construction
Rockcliffe Park Reconstruction - Project 
Fairview Avenue between Cloverdale Road and Sylvan Avenue  Monday, September 22 to Friday, November 21, 2014
 
Low
Road closed 
13 
Construction
Integrated road and utilities reconstruction 
First Avenue between Bronson Avenue and Percy Street  Monday, July 21 to Wednesday, October 15, 2014
 
Low
Road closed 
17 
Construction
Integrated road and utilities reconstruction 
First Avenue between Bank Street and O'Connor Street  Monday, August 11 to Saturday, November 1, 2014
 
Low
Road closed 
17 
Construction
Project - Fitzroy Station Bridge rehabilitation over Carp River  
Galetta Side Road between Canon Smith Drive and Harbour Street  Monday, August 18 to Friday, October 17, 2014
 
Low
Road closure in effect. Signed detour to direct motorists around the closure 
5 
Construction
Gladstone Avenue Reconstruction  
Gladstone Avenue between Elgin Street and Cartier Street  Monday, June 2 to Friday, October 31, 2014
 
Low
Road closure in effect. Avenue converted to permit two-way traffic 
14 
Construction
Gladstone Avenue Reconstruction  
Gladstone Avenue between Elgin Street and Metcalfe Street  Monday, May 5 to Friday, October 31, 2014
 
High
Road closure in effect. Signed detour to direct motorists around the closure. Transit will be detoured. 
14 
Construction
Gladstone Avenue Reconstruction  
Gladstone Avenue between Bank Street and Metcalfe Street  Monday, April 14 to Friday, October 31, 2014
 
High
Road closed. Signed detour to direct motorists around the closure. Transit service is detoured. 
14 
Construction
Integrated road, sewer and watermain construction 
Golden Avenue between Avondale Avenue and Kenwood Avenue  Wednesday, October 1 to Thursday, October 2, 2014
 
Low
Road closed 
15 
Construction
Integrated road, sewer and watermain construction 
Greenwood Avenue between Melbourne Avenue and Churchill Avenue  Thursday, October 2 to Friday, October 10, 2014
 
Low
Road closed 
15 
Construction
Confederation Boulevard - Sussex Drive Reconstruction - Project 
Guigues Avenue between Sussex Drive and Parent Avenue  Wednesday, August 20 to Saturday, October 25, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure 
12 
Construction
Road rehabilitation 
Highway 174 eastbound bus lane between 460 metres east of Jeanne d'Arc Boulevard (end of on-ramp) and Place Orleans Station   Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
Medium
Lane reductions in effect. 
1 
Construction
Road rehabilitation 
Highway 174 eastbound bus lane between Rockcliffe Parkway under pass and 460 metres west of Jeanne d’Arc Boulevard (start of off-ramp)  Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
Medium
Lane reductions in effect. 
1 
Construction
Removal and installation of new luminaires on 19 High Mast Poles  
Highway 174 between Champlain Street and Tenth Line Road  Tuesday, September 30 to Wednesday, October 1, 2014
8 a.m. to 2 p.m. 
Medium
Eastbound lane closure in effect 
1 
Construction
Removal and installation of new luminaires on 19 High Mast Poles  
Highway 174 between Tenth Line Road and Champlain Street   Wednesday, October 1 to Tuesday, October 7, 2014
9 a.m. to 3 p.m.. 
Medium
Westbound lane closure in effect 
1 
Construction
Highway 417 widening 
Highway 417 West between Eagleson Road and Highway 7  Friday, May 2 to Friday, October 31, 2014
 
Medium
Intermittent lane reductions 
5, 21 
Construction
Widening work  
Hunt Club Road between Airport Parkway and Bank Street  Monday, July 7 to Tuesday, October 28, 2014
 
Medium
Nightly lane reductions 
10, 16 
Construction
Connection of new site services 
Jolliet Avenue between Beechwood Avenue and Garneau Street  Wednesday, September 24 to Friday, September 26, 2014
 
Low
Road closed 
12 
Construction
Road, sewer and watermain reconstruction 
Kerr Avenue between Rex Avenue and Broadview Avenue  Monday, June 2 to Friday, October 3, 2014
 
Low
Road closed 
15 
Construction
Rockcliffe Park Northwest Reconstruction 
Kinzua Road between Elmwood Avenue and Manor Avenue  Monday, August 11 to Friday, December 19, 2014
 
Low
Road closed 
13 
Construction
Rockcliffe Park Reconstruction - Project 
Lakehurst Road between Cloverdale Road and Lansdowne Road North  Monday, July 14 to Friday, October 3, 2014
 
Low
Road closed 
13 
Construction
Mobile crane set-up 
1) Laxton Crescent between Joyce Crescent and Joyce Crescent; 2) Laxton Crescent between Joyce Crescent and Navaho Drive   Thursday, October 2, 2014
 
Low
Road closures in effect, however, they will not be closed at the same time  
8 
Construction
Road resufacing 
Lees Avenue between Main Street and Chestnut Street  Monday, June 9 to Wednesday, October 1, 2014
 
Medium
Road reduced to one lane with flag persons 
17 
Construction
Highway 417 expansion project 
Lees Avenue on-ramp (Eastbound)  Thursday, June 13, 2013 to Saturday, April 28, 2018
 
High
On-ramp closed – signage in place 
11 
Construction
Road rehabilitation 
Lees Avenue ramp between Lees Avenue and Central Transitway  Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
High
Lane reductions in effect. 
17 
Construction
Watermain installation 
Leitrim Road between Gilligan Road and Albion Road   Monday, May 26 to Friday, October 31, 2014
 
Medium
Intermittent lane reductions 
10, 22 
Construction
Road rehabilitation 
Leitrim Road between Bowesville Road and Albion Road   Wednesday, July 9 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
10, 22 
Construction
Intersection modifications 
Lemieux Street between St. Laurent Boulevard and Labelle Street  Monday, August 25 to Friday, October 17, 2014
 
Medium
Lane reductions 
13 
Construction
Overhead formwork installation on Sussex Drive Bridge 
MacDonald Cartier Bridge and King Edward Avenue  Monday, March 17 to Friday, October 31, 2014
 
Medium
MacDonald-Cartier Bridge and King Edward Avenue reduced to two lanes in each direction between 9:30 a.m. and 3:30 p.m. and reduced to one lane in each direction between 7 p.m. and 6 a.m.  
12 
Construction
Rockcliffe Park Reconstruction - Project 
Mariposa Avenue between Acacia Avenue and Lakeview Avenue  Monday, September 15 to Friday, November 14, 2014
 
Low
Road closed 
13 
Construction
Culvert replacement 
Marvelville Road between Bank Streetand 8th Line Road  Tuesday, October 14 to Monday, November 3, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure. 
20 
Construction
Connection of new site services 
McGillivray Street between Clegg Street and Herridge Street  Tuesday, September 23 to Thursday, September 25, 2014
 
Low
Road closed 
17 
Construction
Flooding mitigation 
McKitrick Drive between Melanie Crescent East and Rickey Place  Monday, September 22 to Friday, October 10, 2014
 
Low
Road closed 
23 
Construction
Facilitating sidewalk replacement 
Metcalfe Street between Queen Street and Sparks Street  Monday, April 14, 2014 to Tuesday, April 14, 2015
 
Low
Lane reductions in effect. Sidewalk on east side closed. Medium impact for pedestrians  
14 
Construction
Rockcliffe Park Northwest Reconstruction 
Minto Place between Buena Vista Road and Mariposa Avenue  Monday, August 11 to Friday, December 19, 2014
 
Low
Road closed 
13 
Construction
Rehabilitation of railway bridge 
Mohrs Road between Riddledale Road and Galetta Side Road  Thursday, September 25 to Tuesday, September 30, 2014
 
Low
Road closed during working hours only 
5 
Construction
Highway 417 expansion project 
Nicholas Street off-ramp (Westbound)  Tuesday, July 9, 2013 to Friday, October 30, 2015
 
High
Off-ramp reduced to one lane – signage in place 
11 
Construction
Highway 417 expansion project 
Nicholas Street off-ramp (Eastbound)  Tuesday, July 9, 2013 to Friday, October 30, 2015
 
High
Eastbound Nicholas Street on ramp reduction to one lane requiring traffic to merge to the left.  
11 
Construction
Rideau Centre Expansion 
Nicholas Street between Rideau Street and Besserer Street   Monday, January 20, 2014 to Sunday, February 28, 2016
 
Low
Northbound lane closed 
12 
Construction
Connection of new storm sewer  
Northwestern Avenue between Premier Avenue and Clearview Avenue  Monday, April 28, 2014 to Friday, May 22, 2015
 
Low
Road closed. During working hours, the contractor will convert the southbound lane to accommodate both north and south bound traffic. During non-working hours, the road will be reopened 
15 
Construction
Facilitating development construction 
O’Connor Street between Wellington Street and Sparks Street   Monday, May 5 to Tuesday, September 30, 2014
 
Medium
Lane reductions in effect 
14 
Construction
Installation of new Orleans Watermain 
Ogilvie Road between Montreal Road and Blair Place  Monday, May 5 to Wednesday, October 15, 2014
 
Medium
Road reduced to one lane in each direction 
11 
Construction
Rockcliffe Park Reconstruction 
Old Prospect Road between Cloverdale Road and Lansdowne Road North  Tuesday, August 5 to Friday, October 17, 2014
 
Low
Road closed 
13 
Construction
Connection of new site services 
Avenue P between Tremblay Road and Avenue Q  Wednesday, October 1 to Thursday, October 2, 2014
 
Low
Road closed 
18 
Construction
Sewer replacement 
Paddock Way between Sherwood Street and Post Road  Monday, August 11 to Friday, October 3, 2014
 
Low
Road closed 
23 
Construction
Rockcliffe Park Northwest Reconstruction 
Park Road between Lisgar Avenue and Manor Avenue  Monday, August 11 to Friday, December 19, 2014
 
Low
Road closed 
13 
Construction
Road rehabilitation 
Parkway Road between Stagecoach Road and Old Prescott Road   Friday, July 18 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
20 
Construction
Sewer replacement 
Post Road between Paddock Way and Old Colony Road  Monday, July 21 to Friday, October 3, 2014
 
Low
Road closed 
23 
Construction
Gas main relocation 
Prince of Wales Drive between Fisher Avenue and Colonnade Road  Monday, September 1 to Saturday, November 15, 2014
 
Medium
Southbound lane reduction 
3 
Construction
Installation of new gas main  
Prince of Wales Drive between Woodroffe Avenue and Strandherd Drive.  Saturday, October 4 to Sunday, October 5, 2014
8 p.m. Saturday, October 4 to 7 a.m., Sunday, October 5 
Medium
Road closed. Signed detour in place 
22 
Construction
Road rehabilitation 
Princess Louise Drive between Charlemagne Boulevard West and Charlemagne Boulevard East  Monday, September 15 to Monday, December 15, 2014
 
Medium
Intermittent lane reductions 
1 
Construction
Integrated road, sewer and watermain construction 
Princeton Avenue between Edison Avenue and Brierwood Avenue  Wednesday, September 3 to Friday, December 5, 2014
 
Low
Road closed 
15 
Construction
Utility relocation 
Queen Street between Bay Street and Metcalfe Street   Monday, August 25 to Wednesday, December 31, 2014
 
Low
Intermittent lane reductions. Street reduced to one lane in each direction  
17 
Construction
Emergency culvert replacement 
Ramsayville Road between Leitrim Road and Piperville Road   Friday, July 11 to Tuesday, September 30, 2014
 
Medium
Full road closure. Signed detour to direct motorists around the closure 
20 
Construction
Installation of new sanitary and storm sewers  
Renaud Road between Mer Bleue Road and Glenlivet Avenue.  Tuesday, July 8 to Saturday, November 1, 2014
 
Medium
Road closed. Signed detour to direct motorists around the closure 
2 
Construction
Road, sewer and watermain reconstruction 
Rex Avenue between Carling Avenue and Ernest Avenue  Monday, June 2 to Friday, October 3, 2014
 
Low
Road closed 
15 
Construction
Facilitating new building construction 
Richmond Road between Patricia Avenue and Leighton Terrace  Monday, April 14, 2014 to Monday, June 1, 2015
 
Low
Lane reductions in effect. Sidewalk on south side closed. Medium impact for pedestrians  
15 
Construction
Road rehabilitation 
Rideau Road between Bowesville Road and Albion Road   Friday, July 18 to Friday, September 26, 2014
 
Low
Intermittent lane reductions 
20 
Construction
Capital Works Reconstruction 
Rideau Street between Charlotte Street and Cummings Bridge  Monday, May 5 to Friday, November 7, 2014
 
High
Street reduced to one lane in each direction.  
12 
Construction
Rideau Centre Expansion 
Rideau Street eastbound between Sussex Drive and William Street  Monday, February 3, 2014 to Tuesday, March 31, 2015
 
Medium
Eastbound reduced to single shared use lane 
12 
Construction
Culvert replacement 
Sarsfield Road between Magladry Road and Dunning Road  Friday, November 7 to Friday, November 21, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure. 
19 
Construction
Mobile crane set-up 
1) Sherman Drive between Edgeland Place and Cline Crescent; 2) Sherman Drive between Cline Crescent and Navaho Drive   Monday, October 6, 2014
 
Low
Road closures in effect, however, they will not be closed at the same time  
8 
Construction
Integrated road, sewer and watermain construction 
1) Sherry Lane between Majestic Drive and Brent Avenue, 2) Brent Avenue between Sherry Lane and Cheryl Road, 3) Cheryl Road between Brent Avenue and Majestic Drive   Thursday, September 25 to Sunday, November 30, 2014
 
Low
Road closed 
9 
Construction
Facilitating new building construction 
Slater Street between Bank Street and O'Connor Street  Monday, April 14, 2014 to Thursday, October 1, 2015
 
Low
Lane reductions in effect. Sidewalk on north side closed. Medium impact for pedestrians 
14 
Construction
Facilitating new building construction 
Slater Street between O'Connor Street and Metcalfe Street  Monday, April 14 to Wednesday, October 1, 2014
 
Low
Lane reductions in effect. Sidewalk on north side closed. Medium impact for pedestrians 
14 
Construction
Road rehabilitation 
South East Transitway between Bank Street and Billings Bridge Station, south Limit  Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
High
Lane reductions in effect. 
17 
Construction
Road rehabilitation 
South East Transitway including Greenboro lay-by between Greenboro Station, north Limit and Hunt Club Road  Monday, August 18 to Monday, September 29, 2014
Weekdays 9 a.m. to 3:30 p.m. and after 5:p.m. and weekends at all times 
High
Lane reductions in effect. 
10 
Construction
Confederation Boulevard - Sussex Drive Reconstruction - Project 
St. Andrew Street between Sussex Drive to 30 metres east of Sussex Drive  Wednesday, August 20 to Saturday, October 25, 2014
 
Low
Road closed. Signed detour to direct motorists around the closure 
12 
Construction
Intersection modifications 
St. Laurent Boulevard between Lemieux Street and Highway 417  Monday, August 25 to Friday, October 17, 2014
 
Medium
Lane reductions 
11 
Construction
Highway 417 expansion project 
St. Laurent off-ramp Eastbound  Wednesday, July 17, 2013 to Friday, October 30, 2015
 
High
Ramp reduced to one lane 
11 
Construction
Road resurfacing 
St. Patrick Street between King Edward Avenue and Vanier Parkway   Monday, June 9 to Sunday, October 12, 2014
off-peak (9 a.m. to 3:30 p.m.) and overnight (6 p.m. to 7 a.m.) hours 
Medium
Street reduced to one lane in each direction during off-peak and overnight hours 
12 
Construction
Road resurfacing 
St. Patrick Street between Sussex Drive and Dalhousie Street   Thursday, September 11 to Wednesday, October 15, 2014
off-peak (9 a.m. to 3:30 p.m.)  
Medium
Street reduced to one lane during off-peak hours 
12 
Construction
Watermain installation 
Strandherd Road between Fallowfield Road and Kennevale Drive  Monday, July 14 to Friday, December 19, 2014
 
Medium
Off-peak lane reductions 
3 
Construction
Replacing the railway crossing 
Strandherd Drive between Fallowfield Road and McKenna Casey Drive  Sunday, October 12 to Monday, October 13, 2014
8 p.m., Sunday, October 12 to 9 a.m. Monday, October 13 
High
Road closed. Detour signage in place 
3 
Construction
Drainage Improvements 
Sunnyside Avenue between Bronson Avenue and Bank Street   Monday, September 29 to Friday, November 28, 2014
 
Medium
Off-peak lane reductions 
17 
Construction
Road reconstruction 
Sussex Drive between St. Patrick Street and King Edward Avenue   Monday, February 24 to Saturday, December 20, 2014
 
High
Reduced to one lane in each direction 
12 
Construction
Rockcliffe Park Reconstruction - Project 
Sylvan Avenue between Fairview Avenue and Mariposa Avenue  Monday, September 22 to Friday, November 21, 2014
 
Low
Road closed 
13 
Construction
Integrated road, sewer and watermain construction 
Tillbury Avenue between Edison Avenue and Churchill Avenue  Monday, August 11 to Friday, December 19, 2014
 
Low
Road closed 
15 
Construction
Road widening 
Trim Road between North Service Road and Watters Road   Friday, May 16, 2014 to Monday, August 31, 2015
 
Medium
Intermittent lane reductions 
1, 2 
Construction
Rehabilitation of Minto Bridges East and Centre 
Union Street between Stanley Avenue and 220 metres west of Stanley Avenue  Monday, December 16, 2013 to Wednesday, September 30, 2015
 
Low
Bridge closed - signed detours in place 
12 
Construction
Highway 417 Expansion Project 
Vanier Parkway eastbound off-ramp   Wednesday, July 17, 2013 to Friday, October 30, 2015
 
High
Off ramp reduced to one lane 
13 
Construction
Bridge rehabilitation 
Vanier Parkway between Coventry Road and Tremblay Road  Monday, September 22 to Monday, October 13, 2014
 
High
Road reduced to one lane in each direction 
13 
Construction
Rapid bridge replacement 
1) Vanier Parkway southbound between Coventry Road and Tremblay Road and 2) Vanier Parkway northbound between Tremblay Road and eastbound Highway 417 off-ramp  Saturday, October 4 to Monday, October 6, 2014
4 p.m., Saturday, October 4 to 6 a.m., Monday, October 6 
High
Road closed - signed detours in place 
13 
Construction
Connection of new site services 
Violet Street between Britannia Road and Poulin Avenue  Thursday, September 25 to Thursday, October 2, 2014
 
Low
Road closed 
7 
Construction
OLRT construction 
Waller Street between Laurier Avenue East and Nicholas Street  Friday, July 26, 2013 to Monday, December 31, 2018
 
Low
Road closed 
12 
Construction
Facilitating new building construction 
Wellington Street between Bank Street and O'Connor Street  Monday, April 14, 2014 to Tuesday, April 14, 2015
 
Low
Lane reductions in effect. Sidewalk on south side closed. Medium impact for pedestrians  
15 
Construction
Highway 417 expansion project 
Western Rideau River multi-use pathway along the west bank of the Rideau River in the vicinity of Hurdman Bridge   Monday, September 29 to Monday, October 20, 2014
 
High
Pathway currently closed. Detour signs in place directing traffic via Lees and Robinson  
11 
Construction
Rockcliffe Park Northwest Reconstruction 
Willingdon Avenue between Lisgar Avenue and Manor Avenue  Monday, August 11 to Friday, December 19, 2014
 
Low
Road closed 
13 
Construction
Watermain installation 
Youville Drive northbound between St. Joseph Boulevard and Jeanne d'Arc Boulevard  Monday, September 22 to Friday, December 5, 2014
 
Medium
Youville Drive northbound closed. Signed detour in place 
1 

[ top ]

For more information

City of Ottawa

  • Construction projects and local traffic issues: 3-1-1 (TTY: 613-580-2401)
  • Public transit alternatives: 613-741-4390 (TTY: 613-741-5280)
  • For information on future construction projects, view a list of construction projects by ward.