Appleford Street accelerated neighbourhood traffic calming

On this page
Project status
Completed

Project overview

Project description

The City of Ottawa is undertaking the construction of six speed humps on Appleford Street in November 2024.

Plan [ PDF 10.006 MB ]

Speed hump locations shown in the above plan are subject to modification based on site conditions.

Project timing

Design: completed
Construction start: fall 2024
Construction completion: fall 2024

Project budget

Approved project funds to date are $83,000.

Public engagement

An online survey was conducted in September 2023.The results of this survey can be viewed in detail in the As We Heard It report.

Accessibility

Accessibility is an important consideration for the City of Ottawa. The City makes every effort to provide access through and around construction sites. If you require a disability-related accommodation, please contact the project team. Accessible formats and communication supports are available, upon request.

Safety

The City of Ottawa is committed to safety in and around project sites. The project team continues to work closely with the industry and to comply with recommendations provided by municipal, provincial and federal health officials, as well as the Ministry of Labour, Immigration, Training and Skills Development.

Construction notice (November 2024)

The City of Ottawa will construct six speed humps on Appleford Street.

What: The work involves the implementation of six speed humps on Appleford Street.

Why: Following concerns from residents regarding speeding on Appleford Street, a traffic calming study and online survey were conducted by the City of Ottawa in 2023 – more information about this can be found on the website link posted above. Based on the survey, the decision was made to proceed with construction of the speed humps.

The traffic calming measures will be installed to address vehicular speeding along Appleford Street and increase pedestrian safety.

When: Construction of the six speed humps is anticipated to be complete by the end of November 2024.

Where: The six speed humps will be installed on Appleford Street, between Blair Road to Ogilvie Road. Plans showing the locations of the speed humps can be found on the website link provided above.  

Who: The City of Ottawa has retained the contractor, Les Parisien Construction Ltd., to complete the work.

Traffic management

Appleford Street will have information and construction signs installed and maintained throughout the construction site for the duration of the work to keep you informed of the changing conditions. Expect some delays in your travel time over the course of the work. Significant effort is being made to reduce the duration of the construction impacts in your community. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained.

Impact on the right of way and adjacent private properties

The speed humps will be constructed in the roadway within the City’s right of way. Disruption to adjacent private properties is not expected as part of the work.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during the course of the construction work. We would like to thank you for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

To obtain any additional information on this project, please contact the City’s Project Manager:

City Project Manager
Joseph Lolli, P.Eng. 
Senior Engineer, Infrastructure Projects
100 Constellation Drive, Ottawa, ON K2G 6J8
Tel: 613-580-2424, ext. 21679

Contractor Representative
Jocelyn Chabot
Les Parisien Construction Ltd. 
Tel: 343-574-2229