June 2024

On this page

Full road closure: Echo Drive and Concord Street North from Main Street to Greenfield Avenue (June 3 to August 2, 2024)

The City of Ottawa has commenced construction on the new watermains, sewers, and associated road rehabilitation work as part of the Greenfield-Main-Hawthorne et al. Reconstruction Project. To facilitate this work, the City of Ottawa has approved the closure of the Concord Street North as outlined below.

What: Deep utilities excavation will be occurring on Concord Street North between Kings Landing and Greenfield Avenue, requiring the full closure of the street in this segment. Left turns out of Kings Landing will be prohibited. Echo Drive will be converted to two-way traffic to allow local traffic to exit at Main Street. Echo Drive (Main Street to Concord Street North) will be closed to local traffic only.

Why: The closure is required for the safety of residents and workers, as there is limited area to accommodate the open cut excavation and the necessary labour, materials and equipment.

When: The full closure of Concord Street North (Kings Landing to Greenfield Avenue) and the conversion of Echo Drive to two-way from Main Street to Concord Street North will begin on June 3 and continue through to August 2. After that, Concord Street North will continue to be closed to all but local traffic through to late fall 2024 to facilitate reinstatement work. The scheduled closures may be modified as needed, depending on weather and conditions.

Where: Echo Drive and Concord Street North between Main Street and Greenfield Avenue.

Who: The City of Ottawa has retained the contractor Green Infrastructure Partners Inc. (GIP), to complete the work.

Traffic impacts

During the full closure of Concord Street North, Echo Drive north of Main Street will become a two-way street. On-street parking will need to be removed to facilitate this change.

Local access for Echo Drive and Concord Street North (west of Greenfield Avenue) will be as follows:

  • To exit: Travel southbound on Echo Drive to Main Street and go north (to northbound Colonel By) or south (to northbound Greenfield).
  • To enter: Movements will only be allowed from northbound Main Street (right in only).
Of a map showing the closure as described above.

Local access is defined as those living within the limits of the road closure. All other motorists are required to follow the signed detours and/or find alternative routes of travel.

Note that the southbound closure of Greenfield Avenue and Main Street remains in place until fall 2024.

Garbage collection

The contractor is aware of the garbage collection schedule and is required to maintain access so that garbage can be collected at the curb. If vehicular access is interrupted for any reason, the contractor is responsible to move the garbage from the homeowner’s curb to a common location where it can be picked up. Empty containers will then be returned to the appropriate homeowners/businesses.

Construction disruptions

Green Infrastructure Partners (GIP), formerly Aecon, will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but there may be some inconvenience during the course of the operation of the work, such as delays when travelling through the construction zone, noise and dust. You may also feel vibrations due to heavy equipment operations. Vibrations from construction activities are quite common and rarely cause any problems. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours, please call the City at 3-1-1.
For general project information, please contact the City’s Project Manager.

City Project Manager
Patrick Sammon, P.Eng.
Senior Engineer, Infrastructure Projects
Design and Construction - Municipal
Tel: 613-580-2424, ext. 29843

City Inspector
Ken Barton
Construction Technician
Tel.: 613-762-8349

Contractor Representative
Greg Dennison
Tel.: 613-223-7261

Contract Administrator
Benjamin Tardioli
Tel: 613-254-9643, ext. 243

2023 Sidewalk repairs – city wide: Flannery Drive

As part of the City of Ottawa’s annual infrastructure maintenance cycle, sidewalk repairs will begin in June and will continue until late September 2024.

What: Work will involve repairing existing asphalt sidewalk facilities, repairing a portion of concrete curb, installation of tactile walking surface indicators, and may also include catch basin, and iron adjustments as required. Increased noise levels are to be expected to facilitate the work.

Why: The City of Ottawa will be repairing asphalt sidewalks, with the objective of improving the City’s existing sidewalk network for pedestrians.

When: This work is expected to start in June and completion is anticipated by late September 2024.

The sidewalk repair works will occur during the day and evening and will involve localized pedestrian detours and potential minor lane interruptions.

Where: Asphalt sidewalk repairs will occur on the east side of Flannery Drive between Springland Drive and Brookfield Road along with a localized asphalt sidewalk and concrete curb repair on the northwest corner of the Flannery Drive and Springland Drive intersection.

Who: The City of Ottawa has retained the contractor, Les Parisien Construction LTD, to complete the work.

If you have a subsurface lawn irrigation system, please notify the City’s Project Manager identified below. We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur should you choose not to relocate prior to our arrival.

On-street parking 

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below. 

Traffic management

To accommodate the proposed construction, various sidewalk closures, pedestrian detours, lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained with proper detours in place where applicable.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Christopher Geen, C.ET.
Project Manager,
Infrastructure and Water Services
Tel: 613-580-2424, ext. 23031

Contractor Representative
Jocelyn Chabot
Project Manager
Les Parisien Construction LTD
Tel.: 613-574-2229

2023 Sidewalk repairs – city wide: Springland Drive

As part of the City of Ottawa’s annual infrastructure maintenance cycle, sidewalk repairs will begin in June and will continue until late September 2024.

What: Work will involve localized repairs of existing asphalt sidewalk facilities and may also include the installation of tactile walking surface indicators, catch basin, and iron adjustments as required. Increased noise levels are to be expected to facilitate the work.

Why: The City of Ottawa will be repairing asphalt sidewalks, with the objective of improving the City’s existing sidewalk network for pedestrians.

When: This work is expected to start in June and completion is anticipated by late September 2024.

The sidewalk repair works will occur during the day and evening and will involve localized pedestrian detours and potential minor lane interruptions.

WhereNon-continuous (localized) asphalt sidewalk repairs will occur on Springland Drive between Hobson Road and Nicholson Avenue.

Who: The City of Ottawa has retained the contractor, Les Parisien Construction LTD, to complete the work.

If you have a subsurface lawn irrigation system, please notify the City’s Project Manager identified below. We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur should you choose not to relocate prior to our arrival.

On-street parking 

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below. 

Traffic management

To accommodate the proposed construction, various sidewalk closures, pedestrian detours, lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained with proper detours in place where applicable.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Christopher Geen, C.ET.
Project Manager, Infrastructure and Water Services
Tel: 613-580-2424, ext. 23031

Contractor Representative
Jocelyn Chabot
Project Manager
Les Parisien Construction LTD
Tel.: 613-574-2229

Woodroffe Avenue Sidewalk Renewal

Beginning in late June 2024, the City of Ottawa will begin construction work to construct pedestrian crossovers in your neighbourhood.

What: This project involves the rehabilitation of existing sidewalks on both sides of Woodroffe Avenue between Highway 417 and Carling Avenue. The project also includes the rehabilitation of the western portion of the multi-use pathway situated between Woodroffe Avenue and Amaya Private. 

Why: This work is required to improve mobility and safety for pedestrians.

When: This work is scheduled to begin in late June 2024 and is anticipated to be completed by the end of November 2024.

Where: Work will take place on both the east and west sides of Woodroffe Avenue between Carling Avenue and Highway 417 in addition to the multi-use pathway situated between Woodroffe Avenue and Amaya Private.

Who: The City of Ottawa has retained the contractor, D-Squared Construction, to complete the work.

Traffic, pedestrian and cycling impacts

To accommodate the proposed construction, temporary lane reductions will be required. Access to private properties, including pedestrian and cycling access, will be maintained throughout the construction period unless otherwise communicated.

On-street parking 

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but, as you can appreciate, there may be some inconvenience during the course of the work, such as traffic impacts, noise, and odour. We would like to thank you for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255). This allows construction activity to occur weekdays between 7 am and 10 pm. On Saturdays, work is permitted between 7 am and 10 pm while Sunday and statutory holiday work is allowed between 9 am and 10 pm.

Contact information

For any emergency during normal working hours, outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Kyle Carson, P.Eng.
Engineer, Infrastructure Projects
100 Constellation Drive, Ottawa, ON K2G 6J8
Tel: 613-580-2424, ext. 16874

Resurfacing: Leitrim Road from River Road to Limebank Road

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Leitrim Road.

What: Work will involve milling/pulverizing of the existing surface, granular road base upgrade, granular shouldering, and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is expected to occur between June 17 and June 25 from 7 am to 6 pm. The road will be closed daily and reopened to traffic outside of working hours.

Where: The following roadway will be resurfaced during daytime hours and will involve a full closure:

  • Leitrim Road from River Road to Limebank Road

Traffic interruptions may also be experienced due to flagging operations.

Who: The City of Ottawa has retained the Contractor, GIP Paving Inc, to complete the work.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will also be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Jon Ritchie
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-875-0323

Contractor Representative
Rick Seguin
Project Manager
GIP Paving Inc
Tel: 613-223-0026

City Project Coordinator
Claudio Barbuto, C. Tech.
Project Coordinator, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-875-7978

Resurfacing: Innes Road, from Jeanne-d'Arc Boulevard to Tenth Line Road

The City of Ottawa’s road resurfacing program rehabilitates and improves the driving surfaces of Ottawa’s roadways. Localized repairs to both curbs and sidewalks, along with accessibility improvements and updates, are also part of the program.

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Innes Road to improve this roadway and the overall citywide transportation network.

What: Work will involve milling and paving of surface asphalt. Increased noise levels and vibrations to be expected to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: Night work is scheduled to start the week of June 24 and completion is anticipated by mid-July 2024. Night work will take place between 10 pm and 6 am. Concrete work and maintenance hole adjustments work will take place during the day from 9 am to 3 pm and 6 to 10 pm as required. Innes Road will remain open to traffic with lane closures expected.

Where: Work will occur along Innes Road from Jeanne-d’Arc Boulevard to Tenth Line Road.

Who: The City of Ottawa has retained the contractor, GIP Paving Inc, to resurface Innes Road.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

Impact on the right of way and adjacent private properties

The reconstruction is within the City’s right of way but may result in some disruption to part of the private property directly adjacent to the work. The City of Ottawa will reinstate all sections of landscaping, driveways and walkways that are disturbed by construction. However, if you have plants or any other assets located within the City’s right of way that you want to preserve, we suggest that you may want to move them in preparation for the construction work.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager.

City Project Manager
Guy Lavallee, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-291-9249

Contractor Representative
Rick Seguin
Project Manager
GIP Paving Inc.
Tel: 613-223-0026

2024 Gravel road upgrade, and pavement preservation programs

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur in your neighbourhood.

What: Work will involve milling/pulverizing of the existing surface and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is expected to start in June and completion is anticipated by fall 2024. The road will remain open to traffic with lane closures expected. Traffic control personnel will direct traffic through the site.

Where: The following roadway work will take place during the day and evening as required and will involve minor lane interruptions:

  • Conley Road (OR 36) from Franktown Road (OR 10) to Mansfield Road
  • David Manchester Road from 120 metres south of Richardson Side Road to 1.15 kilometres north of Hazeldean Road
  • O’Toole Road from Wilhaven Drive to Innes Road (OR 30)
  • Old Almonte Road from David Manchester Road to Northshire Drive
  • Pierce Road from McCordick Road to Malakoff Road
  • Swale Road (5th Line Road) from Belmeade Road to Dalmeny Road
  • Wall Road from Tenth Line Road (OR 47) to Trim Road

Weekend work is anticipated and traffic interruptions may also be experienced due to flagging operations.

Who: The City of Ottawa has retained the contractor, RW. Tomlinson Ltd, to complete the work.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will also be maintained.

Construction disruptions

The Contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Robert Leach, C. Tech.
Project Manager
Infrastructure and Water Services
Tel.: 613-857-2942

City Project Coordinator
Brendan Mudd, C. Tech.
Project Coordinator, Road Rehabilitation Infrastructure and Water Services
Tel.: 613-857-8135

Contractor Representative
Marc-André Lebel
Project Manager
R.W. Tomlinson Ltd.
Tel.: 613-880-0556

Resurfacing: Eagleson Road (Fallowfield Road to Emerald Meadows Drive)

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Eagleson Road.

What: Work will involve concrete works, milling of the existing surface, and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is expected to start on June 16 and completion is expected by the end of July 2024.

The road will remain open to traffic with lane closures expected. Traffic control personnel will direct traffic through the site.

Where: The following roadway will be resurfaced during nighttime hours (10 pm to 7 am), with daytime concrete works (7 am to 10 pm) and will involve minor lane interruptions:

  • Eagleson Road from Fallowfield Road to Emerald Meadows Drive

Weekend work is anticipated and traffic interruptions may also be experienced due to flagging operations.

Who: The City of Ottawa has retained the contractor, R.W Tomlinson Ltd, to complete the work.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted. Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will also be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact Information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Phil Hulan, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-804-3738

City Project Coordinator
Claudio Barbuto, C.Tech.
Project Coordinator, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-875-7978

Contractor Representative
Phil Youdell
Project Manager
R.W Tomlinson Limited
Tel: 613-229-9346

Building Demolition: 2135 Huntley Road

Starting the week of June 17, demolition work will be occurring in your neighborhood.

What: Demolition of the Goulbourn Municipal Building.

Why: The existing building has reached end of life.

When: This work will begin the week of June 17 and is expected to be completed by mid-July, 2024, subject to weather conditions.

Where: The work is located within the property at 2135 Huntley Road

Who: The City of Ottawa has retained the contractor, Elite Environmental Group Inc. Ottawa, to complete the work. 

Impact on the right of way and adjacent private properties

The construction work is within the City’s right of way and properties and will not result in any major disruption to the pathway or properties directly adjacent to the work. Should you have any questions or concerns about the project, please contact the City Project Manager listed below.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the operation of your business, but as you can appreciate, there may be some inconvenience during the course of the operation of the work, such as minor traffic delays adjacent to the construction zone, noise and dust. You may also feel minor vibrations due to heavy equipment operations. Vibrations from construction activities are quite common and rarely cause any problems. We would like to thank you for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager.

City Project Manager
C.P. Sharma, Senior Project Manager
Design and Construction - Facilities
100 Constellation Drive, Ottawa, ON K2G 6J8
Tel.: 613-580-2424, ext. 43455

Consultant Project Manager
Doug B. Gray
D. B. Gray Engineering Inc. 
700 Long Point Circle, Ottawa ON K1T 4E9
Tel.: 613-425 8044

Resurfacing: Holland Avenue

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Holland Avenue.

What: Work will involve concrete works, milling of the existing surface, and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is expected to begin on June 17 and completion is expected by the end of July 2024.

The road will remain open to traffic with lane closures expected. Traffic control personnel will direct traffic through the site.

Where: The following roadway will be resurfaced during daytime hours (7 am to 10 pm) and will involve minor lane interruptions:

  • Holland Avenue from Byron Avenue to 100 metres north of Byron Avenue

Weekend work is anticipated and traffic interruptions may also be experienced due to flagging operations.

Who: The City of Ottawa has retained the contractor, Thomas Cavanagh Construction Ltd, to complete the work.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted. Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will also be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Phil Hulan, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-804-3738

City Project Coordinator
Claudio Barbuto, C. Tech.
Project Coordinator, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-875-7978

Contractor Representative
Eric MacPherson, C. Tech.
Project Manager
Thomas Cavanagh Construction Ltd
Tel: 613-402-0453

Resurfacing: March Road

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along March Road.

What: Work will involve milling or pulverizing of the existing surface, possible granular material placement, adjustment of maintenance holes and catch basin grates, concrete repairs, and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is expected to start the week of June 10 and completion is anticipated by fall 2024. The road will remain open to traffic with lane closures expected. Traffic control personnel will direct traffic through the site.

Where: The following roadways will be resurfaced during the day and evening and will involve minor lane interruptions:

  • March Road from Tall Forest Drive (west) to Old Second Line Road

Weekend work is anticipated for all locations and traffic interruptions may also be experienced due to flagging operations.

Who: The City of Ottawa has retained the contractor, GIP Paving, to complete the work.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

Impact on the right of way and adjacent private properties

The construction is within the City’s right of way but may result in some disruption to part of the private property directly adjacent to the work. The City will reinstate sections of landscaping, driveways and walkways that are disturbed by construction. However, if you have plants or any other assets located within the City’s right of way that you want to preserve, we suggest that you move them in preparation for the construction work. If you own a subsurface lawn irrigation system or heated driveway system, please notify the City’s Project Manager.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted. Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Britney McGrath, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-808-0150

City Project Coordinator
Christian Pelletier, C.E.T.
Project Coordinator, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-277-0997

Contractor Representative
Corey Walsh
Superintendent
GIP Paving Inc
Tel.: 613-223-8431

Resurfacing: Baseline Road

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Baseline Road.

What: Work will involve milling or pulverizing of the existing surface, possible granular material placement, adjustment of maintenance holes and catch basin grates, concrete repairs, and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: Sidewalk work is expected to start the week of June 9 during daytime hours, and asphalt work is anticipated to begin later in summer 2024. The road will remain open to traffic with lane closures expected. Traffic control personnel will direct traffic through the site. A further notice for overnight paving work will be sent in advance of this work.

Where: The following roadway will be resurfaced during the day and night and will involve minor lane interruptions:

  • Baseline Road from Zena Street to Farlane Boulevard

Traffic interruptions may be experienced due to flagging operations.

Who: The City of Ottawa has retained the contractor, Thomas Cavanagh Construction Limited, to complete the work.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

Impact on the right of way and adjacent private properties

The construction is within the City’s right of way but may result in some disruption to part of the private property directly adjacent to the work. The City will reinstate sections of landscaping, driveways and walkways that are disturbed by construction. However, if you have plants or any other assets located within the City’s right of way that you want to preserve, we suggest that you move them in preparation for the construction work. If you own a subsurface lawn irrigation system or heated driveway system, please notify the City’s Project Manager.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted. Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Britney McGrath, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-808-0150

Contractor Representative
Eric MacPherson, C.Tech.
Project Manager
Thomas Cavanagh Construction Limited
Tel: 613-402-0453

City Project Coordinator
Christian Pelletier, C.E.T.
Project Coordinator, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-277-0997

Resurfacing: Kirkwood Avenue

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Kirkwood Avenue.

What: Work will involve concrete works, maintenance hole and catch basin adjustments, milling of the existing surface and roadway resurfacing. Increased noise levels to be expected in order to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is expected to start the week of June 3, 2024.

The road will remain open to traffic with lane closures expected. Traffic control personnel will direct traffic through the site.

Where:  The following roadway will be subject to daytime concrete work and nighttime paving activities involving minor lane interruptions:

  • Kirkwood Avenue from Merivale Road to Laperriere Avenue

Weekend work is anticipated and traffic interruptions may also be experienced due to flagging operations.

Who: The City of Ottawa has retained the contractor, Thomas Cavanagh Construction Ltd, to complete the work.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

On-street parking 

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted. Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will also be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager:

City Project Manager
Phil Hulan, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-804-3738

City Project Coordinator
Claudio Barbuto, C. Tech.
Project Coordinator, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-875-7978

Contractor Representative
Eric MacPherson, C. Tech.
Project Manager
Thomas Cavanagh Construction Ltd
Tel: 613-402-0453

Earl Grey Drive Underpass- Geotechnical Investigation

Beginning in June 2024, the City of Ottawa will undertake a geotechnical investigation within your community. This investigation is required as part of the design of the Earl Grey Drive underpass and upgrade of Terry Fox Drive and Didsbury Road intersection.

What: The geotechnical investigation will involve the drilling of boreholes and obtaining environmental soil samples for testing.

Why: This geotechnical investigation supports the design of the road and underpass bridge structure.

When: This geotechnical investigation work is expected to begin in June 2024. The work will be completed during weekdays and should take approximately 5 days weather permitting.

Where: The geotechnical investigation will occur along Earl Grey Drive, Didsbury Road and Terry Fox Drive. The boreholes will be within the roadway, and no impacts to landscaping or private lands are expected.

Who: The City of Ottawa has retained Stantec Consulting and their sub-contractor Strata Soil Sampling Inc. to undertake a geotechnical investigation for this project.

Traffic

  • Lane reductions are anticipated during this work. A minimum of one lane will remain open.
  • Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Contact information

For any emergency outside normal working hours, please call the City at 3-1-1. For general project information, please contact the City’s Project Manager. 

City Project Manager
Chris Ogilvie
Senior Project Manager, Infrastructure Projects
100 Constellation Drive, Ottawa, ON K2G 6J8
Tel.: 613-580-2424, ext. 13432

Contractor Representative
Brian Beatty, Project Manager
Strata Soil Sampling Inc.
Tel.: 613-464-0358

Southmore Drive traffic calming

In late May 2024, the City of Ottawa will begin installation of traffic calming measures and a sidewalk in your neighbourhood.

What: The traffic calming work on Southmore Drive East includes the following:

  • Installation of four speed cushions between Walkley Road and McCarthy Road.
  • Installation of a new 2.0m wide concrete sidewalk along the west side of Southmore Drive East between Walkley Road and Garwood Avenue.
  • Installation of a raised crosswalk at the pedestrian crossing of Southmore Drive East at Walkley Road.
  • Modifications to the intersection of Southmore Drive and McCarthy Road, including the replacement of all four pedestrian landing pads at the intersection.

Why: This work is required to improve conditions for all road users by calming vehicular traffic, encouraging more appropriate driver behaviour, and increasing pedestrian and cyclist safety.

When: This work is scheduled to begin in late May and is scheduled to be completed by early September 2024.

Where: Southmore Drive between Walkley Road and McCarthy Road.

Who: The City of Ottawa has retained the contractor, D-Squared Construction Ltd., to complete the work.

Traffic management

To accommodate the proposed construction, temporary lane reductions will be required on Southmore Drive. To accommodate the proposed raised crosswalk construction, a short-term closure at Southmore Drive East and Walkley Road will be required.

Access to private properties including pedestrian and cycling access, will be maintained throughout the construction period unless otherwise communicated.

On-street parking and local access

As the various road reconstruction activities are in progress, on-street parking will be restricted. Local access will be maintained to residents, business owners and emergency vehicles. Periodically, vehicular access to your property may be unavailable; the contractor is required to provide 24-hour notification of temporary loss of vehicular access/egress to your property. A temporary On-Street Parking Permit will be made available to allow on-street parking within two blocks of your residence when these disruptions occur. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted. Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Contractor responsibility

As part of this contract, the contractor is assuming full responsibility for the construction work until it is entirely complete as well as any damages to private property resulting from these construction activities. In the event of such occurrences, all claims for damages should be immediately reported both verbally and in writing to the contractor and to the City on-site Representative. This will ensure prompt notification of appropriate authorities to complete the claim investigations.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but, as you can appreciate, there may be some inconvenience during the course of the work, such as traffic delays, noise and dust. You may also feel vibrations due to heavy equipment operations. Vibrations from construction activities are quite common and rarely cause any problems. We would like to thank you for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours, please call the City at 3-1-1.
For general project information, please contact the City’s Project Manager.
For construction related questions or concerns, please contact the Contractor Representative.

City Project Manager
Steven Stoddard, P.Eng.
City of Ottawa
Tel.: 613-580-2424, ext. 27880

Contract Administrator
Kelsey Lloyd, P.Eng.
Novatech Engineering
Tel.:  613-254-9643, ext. 287

City On-Site Representative
Todd Penfound, Site Inspector
Novatech
Tel.: 613-277-3273

Contractor Representative
Justin Woodward
Project Manager
DSQ Construction Ltd.
Tel.: 613-914-1431

Fire Station 41 – Parking lot and drive aisles resurfacing

Starting in early June 2024, resurfacing works will occur in your neighborhood.

What: The City of Ottawa will be re-paving the Fire Station 41 drive aisles and parking lot. The works also include accessibility upgrades to the front of the station.

Why: The current asphalt has reached the end of its service life.

When: This work will begin in early June and is expected to be completed by early July 2024.

Where: The work is located within the property at Fire Station 41, 380 Eagleson Road. 

Who: The City has retained the contractor, Brenning Construction, to complete the work. 

Traffic impacts

  • The sidewalk will be closed on the west side of Eagleson Road, between Palomino and Palomino drives. Pedestrians will be redirected to the east sidewalk, please watch for signage.
  • Southbound Eagleson Road will be reduced to one lane in front of the fire station between June 14 and July 5.

On-street parking on Rothesay Drive

Fire station staff will be required to park on Rothesay Drive between June 1 and 13 to accommodate the work. On-street parking may be restricted during this time.

Construction disruptions

Brenning Construction will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during the operation of the work. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager.

City Project Manager
Brian Munro
Project Manager, Infrastructure Services
Design and Construction - Facilities
Tel.: 613-316-9677

Contractor Representative
Eric Courchaine
Brenning Construction
2741 Quinn Road, Ottawa, ON K1T 3V4
Tel.: 613-884-5092

Culvert renewal - Albion Road

This notice is to advise that construction in your neighborhood will begin on June 7, 2024. This work is being conducted to complete the replacement of one culvert to help improve your roadways and maintain surface drainage in your community.

What: Work will involve the removal and replacement of the existing culvert.

Why: The City of Ottawa will be undertaking these repairs as part of a programmed end-of-service-life replacement project.

When: This work is planned to be completed between June 7 and June 10, weather dependent. 

Where: Construction activity can be expected on Albion Road, approximately 25 metres south of the intersection of Albion Road and Lester Road. 

Who: The City of Ottawa has retained the contractor, Goldie Mohr Limited to complete this work.

Traffic management and detour

  • Residents can expect a full road closure of Albion Road at Lester Road throughout the construction period. The signed detour route during the closure is through Lester Road, Bank Street and Leitrim Road.
  • Residents can expect construction traffic and activity within the City’s right of way. 

Construction disruptions

Goldie Mohr will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during the operation of the work. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. Should you have any questions or concerns, please contact the Project Team:

City Project Manager
Larry Mckellop, M.Eng., P.Eng.
Senior Engineer, Infrastructure Projects
100 Constellation Drive, Ottawa, ON K2G 6J8
Tel.: 613-894-0374

City Contract Administrator
Stephen Arends, P.Eng.
Project Manager, Civil Engineer, Jp2g 
Cell: 613-868-1350

City On-Site Representative            
Paul Nicol
Construction Technician
City of Ottawa, Infrastructure Services
Cell: 613-851-1258

Contractor Representative
Stephen Rumleskie
Site Superintendent
Goldie Mohr Ltd.
Cell: 613-229-2466
 

Resurfacing: Morin Street

The City of Ottawa’s road resurfacing program rehabilitates and improves the driving surfaces of Ottawa’s roadways. Localized repairs to both curbs and sidewalks, along with accessibility improvements and updates, are also part of the program.

As part of the City of Ottawa’s annual infrastructure maintenance cycle, road resurfacing will occur along Morin Street to improve this roadway and the overall citywide transportation network.

What: Work will involve milling of existing roadway, the addition of granular A road base, concrete curb repairs, iron adjustments and paving of a binder course and surface asphalt. Increased noise levels and vibrations to be expected to facilitate the work.

Why: The City of Ottawa will be resurfacing roads as preventative maintenance aimed at extending the City's roadway network lifecycle.

When: This work is scheduled to start in early June 2024 and completion is anticipated by fall 2024. Work will take place between the hours of 7 am and 10 pm as required. Morin Street will remain open to traffic with lane closures expected.

Where: Work will occur along Morin Street from Côté Street to St-Laurent Boulevard.

Who: The City of Ottawa has retained the contractor, R.W. Tomlinson Limited, to resurface Morin Street.

We encourage residents to contact the undersigned to identify and confirm that private irrigations systems have been disconnected or relocated. Damage may occur, should you choose not to relocate prior to our arrival.

The reconstruction of the concrete curb and gutter my impact adjacent retaining walls/landscaping. We encourage residents to contact the undersigned to identify and confirm if there will be an impact.

Impact on the right of way and adjacent private properties

The reconstruction is within the City’s right of way but may result in some disruption to part of the private property directly adjacent to the work. The City of Ottawa will reinstate all sections of landscaping, driveways and walkways that are disturbed by construction. However, if you have plants or any other assets located within the City’s right of way that you want to preserve, we suggest that you may want to move them in preparation for the construction work.

On-street parking

As the various road reconstruction activities are in progress on your street, on-street parking may be restricted. In the event that access to your driveway will be impacted, you will receive 24-hours’ notice and provided with a Temporary On-Street Parking Permit (orange form) to permit on-street parking within two blocks of your residence. Residents with electric vehicles will need to find alternative charging arrangements when access is restricted. The use of extension cords within the public right of way is not permitted.

Should you have additional concerns about reduced access, such as business deliveries or accessibility requirements, please contact the project manager listed below.

Traffic management

To accommodate the proposed construction, various lane reductions, alternating traffic and/or detours can be expected. Access to local businesses and private properties will be maintained throughout the construction period. Access for pedestrians and cyclists will be maintained.

Construction disruptions

The contractor will take every precaution to minimize interruptions to the normal life of your family and/or operation of your business, but as you can appreciate, there may be some inconvenience during construction. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours on weekdays and weekends, please call the City at 3-1-1. For further information about this project, please contact the City’s Project Manager.

City Project Manager
Guy Lavallee, C.E.T.
Project Manager, Road Rehabilitation
Infrastructure and Water Services
Tel: 613-291-9249

Contractor Representative
Yves Bisson
Site Superintendent
R.W. Tomlinson Limited
Tel: 613-913-9104

Road closure extension: Main Street southbound, Colonel By Drive to Greenfield Avenue (April 8 to May 10, 2024)

The City of Ottawa has commenced construction on the new watermains, sewers, and associated road rehabilitation work as part of the Greenfield-Main-Hawthorne et al. reconstruction project. To facilitate this work, the City of Ottawa has approved the closure of Main Street southbound from Colonel By Drive to Greenfield Avenue outlined below.

What: The southbound closure of Main Street from Colonel By Drive to Greenfield Avenue to accommodate the safe coordination of the deep storm sewer maintenance hole installation at the Main Street and Greenfield Drive intersection. This closure will extend the existing southbound closure of Main Street, currently closed southbound from Greenfield Avenue to Hawthorne Avenue. The closure of Greenfield Avenue southbound from the 417 on ramp to Main Street remains in place.

Why: The extended southbound Main Street closure is required for the safety of residents and workers, as there is limited area to accommodate the open cut excavation and the necessary labour, materials and equipment.

When: The southbound closure of Main Street has been extended to May 10.  The scheduled closures may be modified as needed, for example if weather affects the schedule, or if conditions change.

Where: Main Street southbound between Colonel By Drive and Greenfield Avenue.

Who: The City of Ottawa has retained the contractor Green Infrastructure Partners Inc. (GIP), formerly Aecon, to complete the work.

Traffic impacts

The detour for vehicles travelling northbound / southbound on Colonel By Drive wishing to travel northbound Greenfield Avenue is via Hawthorne Avenue. Local egress for the residents fronting Echo Drive or Harvey Street west of Main Street will be via Harvey Street to Main Street. Residents of the 10 Main Street condominium building will access their homes via Main Street northbound from Hawthorne Avenue. Egress for 10 Main Street will be northbound on Main Street to Echo Drive eastbound. Note that the southbound closure of Greenfield Avenue and Main Street (separate notice) continues in conjunction with the closure detailed herein.

A map showing the road closure and detour as listed above.

Garbage collection

The contractor is aware of the garbage collection schedule and is required to maintain access so that garbage can be collected at the curb. If vehicular access is interrupted for any reason, the contractor is responsible to move the garbage from the homeowner’s curb to a common location where it can be picked up. Empty containers will then be returned to the appropriate homeowners/businesses.

Construction disruptions

Green Infrastructure Partners (GIP), formerly Aecon, will take every precaution to minimize interruptions to the everyday life of your family and/or operation of your business, but there may be some inconvenience during the course of the operation of the work, such as delays when travelling through the construction zone, noise and dust. You may also feel vibrations due to heavy equipment operations. Vibrations from construction activities are quite common and rarely cause any problems. We would like to thank you in advance for your patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

Contact information

For any emergency outside normal working hours, please call the City at 3-1-1.  
For general project information, please contact the City’s Project Manager. 

City Project Manager
Patrick Sammon, P.Eng.
Senior Engineer, Infrastructure Projects
Design and Construction - Municipal
Tel: 613-580-2424, ext. 29843

City Inspector
Ken Barton
Construction Technician
Tel.: 613-762-8349

Contractor Representative
Greg Dennison
Tel.: 613-223-7261

Contract Administrator
Benjamin Tardioli, P.Eng.
Tel: 613-254-9643, ext. 243