Summary

The Council approved Carp River Watershed/Subwatershed study recommended restoration and enhancement of the Carp River, Poole Creek, and Feedmill Creek. The Carp River is a slow-moving, sediment filled river. The Carp River Restoration Plan will enhance the river with a narrower low flow channel that improves sediment transport, vegetation along the river banks, and habitat features such as fish habitat pools and wetlands.

The Carp River Restoration Environmental Study Report was undertaken as a Schedule B project in accordance with the Municipal Class Environmental Assessment.

The purpose of the Class Environmental Assessment Study was to develop, evaluate and recommend preferred rehabilitation alternatives for Carp River, Poole Creek and Feedmill Creek within the Kanata West development area. The Carp River Restoration Plan involves full restoration within the Kanata West reach including a change to the channel as well as the following design elements: increased sinuosity; reduction in channel cross-section; creation of ponds and deltas; “nested” channels; varied substrate; riparian vegetation planting; and a pedestrian pathway as part of larger regional and local pathway systems. The Poole Creek Restoration involves four areas that require local improvements including channel realignment, removal of an island and channel narrowing, removal of debris and an old bridge, valley wall treatment, creation of a delta marsh and riparian plantings. Feedmill Creek Restoration involves four areas that require local improvements including channel realignment, increased sinuosity, aquatic connections to the Carp River, local bank treatment and riparian plantings.

In June of 2006 two Master Plans and Environmental Screening Report were completed and

Notices of Completion posted for:

  • Kanata West Master Servicing Study Report, dated June 16, 2006 (15 projects planned under Schedule B of the Municipal Class Environmental Assessment);
  • Kanata West Road Network Environmental Study Report dated May 2006 (6 projects planned under Schedule C of the Municipal Class Environmental Assessment); and
  • Carp River, Poole Creek and Feedmill Creek Restoration Class Environmental
  • Assessment Report dated June 2006 (1 project planned under Schedule B of the Municipal Class Environmental Assessment).

These studies and plans identified 22 projects, 7 of which were subject to Part II Order requests under the Environmental Assessment Act. The other 15 were deemed to be approved and could proceed to construction in accordance with the Class EA process (2009). During the ensuing Part II Orders review period by the Ministry of the Environment (MOE), technical errors were found in the hydrologic and hydraulic models used to develop the strategies for the projects. The City of Ottawa requested that the MOE postpone the review until the errors could be further reviewed. In response to these concerns and errors, the City of Ottawa initiated Third Party Review (TPR) of the Carp River Restoration Plan and associated models. The Minister of the Environment subsequently issued an Order in June of 2008 in response to the Part II Order requests that outlined several conditions and a requirement for the 7 projects that led to the Third-Party Review and Updated Project Documentation and Notification.

The conditions outlined in the Minister’s Order required the following information and/or

responses.

  • How the TPR results affected the 22 projects;
  • Application of one and two zone flood plain policies;
  • TPR recommendations on model calibration;
  • Water level and flow rate monitoring plan;
  • Implementation Plan; and
  • Updated Public Consultation Report.

A response to the Minister’s Order was compiled and accepted by the Ministry of the Environment in October 2009.

Results of the Third Party Review

Greenland International Consulting Ltd, (Greenland), was commissioned to complete a Third Party Review (TPR) of the Carp River Restoration Plan for the City of Ottawa, based on the Terms of Reference that were approved by Council and reviewed by an Advisory Committee consisting of MOE, MTO, and MVC as well as City Staff and an Academic Panel. The Review included all hydrologic and hydraulic models that were used to create the Carp River Restoration Plan and to support the recommendations of the Master Plans and the 22 projects. The TPR assignment also involved assessing various elements of the restoration plan pertaining to flood storage, sediment transport, two-zone floodplain policy application, and positioning of adjacent stormwater management (SWM) facilities. Greenland also provided an opinion on the application of various provincial and municipal policies, and on impacts of the revised models on the 22 Class EA projects. The TPR was completed and the key findings of the TPR are:

  • Modelling errors have been corrected; all missing hydrographs are now included and missing overland flow is now included;
  • There is insufficient data to determine the appropriate run-off parameter for some upper rural catchments and the routing through tributaries;
  • The maximum (worst case) scenario is a potential deficit of 85,600m3 of stormwater volume;
  • Two storm events of 25 mm volume or greater over a two to six hour duration can be used to validate the models and remove the uncertainty;
  • Until such a validation occurs, development can proceed if measures are implemented to account for the worst case volume; and
  • The outcome from the corrected models does not affect the recommendations of the environmental assessments. Specifically, neither the seven Class EA projects that were subject to the Part II order requests nor the other 15 Class EA projects are impacted by the model changes at the planning decision/EA level.

As part of the Minister’s Order in response to the original Part II Order requests, the Carp River Restoration Plan EA was updated and new Notices of Completion were issued in June 2010. Additional Part II Order requests were received in response to the Notice of Completion. On March 30, 2011 – the Minister of Environment dismissed the Part II Order requests and confirmed that individual Environmental Assessments were not required for the seven disputed projects. The Minister further directs that Stormwater Management Ponds 1, 2, and 5 not proceed until such time as the stormwater management models are calibrated and validated. In July 2011, the Model Validation Report is completed and subsequently filed with Ministry of Environment. The Models have been validated and confirm that the approach in the Environmental Assessments and the direction in the original Carp River Subwatershed Study was valid. Stormwater Management Ponds 1, 2, and 5 may proceed to design and construction. The Carp River Restoration Plan has now moved to the Final Design stage to be completed in 2012 with the first phase of construction anticipated in early 2013.

Carp River Model Calibration Validation Exercise Final Report

Main Report 

Appendix A – Correspondence 

Appendix B – Additional Model Validation Figures – Late Fall Events 2010 

Appendix C – HEC-RAS Model Runs – Various Return Periods 

Appendix D – July 24, 2009 storm with Ultimate Conditions Model Run 

Appendix E – Target Hydrographs at Key Locations 

If you would like a copy of the report, please contact amy.macpherson@ottawa.ca

Carp River Restoration Plan Third-Party Review

The City of Ottawa initiated a third-party review of the Carp River Restoration Plan in response to concerns raised following an audit of the project. The environmental assessment (EA) of the Carp River, Poole Creek and Feedmill Creek Restoration Project was completed in 2006.

This project involves rehabilitation of the Carp River (Hazeldean Road to Richardson Side Road) and development of a small amount of land within the floodplain. In 2007, an error in the computer model was discovered and subsequent adjustments were made to the plan. Council directed staff to engage a third-party engineering firm to independently review the model and the overall project, and report on their findings prior to the City implementing the restoration project.

The third-party review of the Carp River Restoration Plan and its associated projects was completed by Greenland International Consulting Inc., the engineering firm hired by the City to conduct the review.

Report – Phase 1 [pdf 3.63 Mb]

Report – Phase 2 [pdf 2.24 Mb]

If you would like a copy of the reports, please contact amy.macpherson@ottawa.ca

City staff presented a report and their recommendations on the Carp River Restoration Plan Third Party Review to the City’s Planning and Environment Committee on Monday, May 11, 2009 and Council on Wednesday, May 27, 2009. The report was approved by City Council and formed the basis for future work that led to the completion of the Environmental Assessment process which allows the Carp River Restoration project to proceed to the final design and construction phase.

Carp River Watershed/Subwatershed Study

The City of Ottawa, in partnership with the Mississippi Valley Conservation Authority, initiated a study of the Carp River watershed in response to growing development pressure in the Kanata area and the existing environmental condition of the river and associated natural resources.

The Carp River Watershed/Subwatershed Study determined the state of the watershed and the impacts of management practices and various land uses on the health of the watershed. This information was essential to estimate the impacts of future land use change on the watershed system and to identify appropriate management approaches to ensure the continued good health of the watershed. With this knowledge, a broad, policy level of planning could be applied to the entire watershed area with a more focused, detailed examination of issues and solutions occurring for the urban (subwatershed) portion of the study area.

The study was initiated in the fall of 2000 and was completed in June 2005. The study provides a long-term environmental management strategy to protect, enhance and restore the environmental quality of the watershed's natural resources. The watershed/subwatershed study followed the Master Planning Process as outlined in the Municipal Engineers Association Class Environmental Assessment document. As a Master Plan, the study report followed Phases 1 and 2 at a broad level of assessment.

The Carp River Watershed/Subwatershed Study outlines a number of projects to be carried out in the future. These projects include stream restoration for sections of the Carp River and major tributaries including Corkery Creek, Huntley Creek, Feedmill Creek and Poole Creek. In the urban area, stormwater management ponds are proposed for future urban development. The plan also includes non-structural works related to environmental protection and enhancement of natural features and land stewardship on agricultural lands. Further studies will be carried out to design the proposed constructed works and public meetings will be held as required.

The Council-approved Carp River Watershed/Subwatershed Study, Final Report (Robinson, December 2004) details the study process, findings and recommendations. The report can be viewed at the following Ottawa Public Library locations:

Main Branch, Ottawa Room
120 Metcalfe St, 3rd Floor
613-236-0303

Carp Branch
3911 Carp Road
613-839-5412

Kanata Beaverbrook Branch
2500 Campeau Drive
613-592-2712

Hazeldean Branch
50 Castlefrank Road
613-836-1900

Stittsville Branch
1637 Main Street
613-836-3381

Chronology

  • The Carp River Restoration Plan has been under development for more than eleven years, beginning with the Carp River Watershed/Subwatershed Study in 2000:
  • August 2000 - Contract awarded for Carp Watershed/Subwatershed Study
  • March 2003 – Council approves Kanata West Concept Plan
  • January 2005 - Council approves the Carp Watershed/Subwatershed Study
  • June 2006 - Kanata West Class Environmental Assessment (EA) Notices of Completion issued
  • July 2006 – Part II Order requests received
  • April 2007 - The Minister of Natural Resources stated that the objectives of the provincial natural hazards policy have been met in the Carp River Restoration Plan
  • 2007 - Auditor General conducts audit of Carp River watershed and related projects in response to call to Fraud and Waste Hotline
  • January 15, 2008 – City staff member informs TSH Environmental and Engineering Services of concerns with modeling
  • January 24, 2008 – TSH Environmental and Engineering Services confirm errors in model
  • January 25, 2008 – City advises Ministry of the Environment (MOE)
  • February to April 2008 – Consultants of record, TSH and CH2M Hill, correct models
  • April 23, 2008 – Auditor General releases Audit of the Carp River Watershed and Related Projects at City Council
  • Recommendations were referred to the Agriculture and Rural Affairs Committee meeting of May 8, 2008 and the Planning and Environment Committee (PEC) meeting of May13, 2008. The issue of potential conflict of interest with respect to consultants and the community lands development recommendations was referred to the Corporate Services and Economic Development Committee meeting of May 6, 2008
  • May 14, 2008 – Council directed staff to proceed with the Third Party Review.
  • June 25, 2008 – Council approved the amended terms of reference for the Third Party Review.
  • July 14, 2008 –Ministry of Transportation of Ontario (MTO) and MOE invited to participate on the Project Advisory Committee.
  • July 21, 2008 – Minister of Environment issues an order under the Environmental Assessment Act imposing conditions with respect to the 22 projects within the Kanata West Development area.
  • August 8, 2008 – Greenland International Consulting Ltd. was retained to conduct Third Party Review.
  • February 13, 2009 – Project Advisory Committee received draft Third Party report.
  • March 16, 2009 – Updated Existing Conditions model released
  • April 9, 2009 – Technical Briefing on final draft of Third Party Review Report
  • April 9, 2009 – Final draft of Third Party Report posted on City website for comment
  • April 20, 2009 – Public comment period ends; comments forwarded to Greenland
  • May 12, 2009 – PEC recommends approval of Third Party Review to Council
  • May 27, 2009 – Council approves Third Party Review
  • November 24, 2009 – Ministry of Environment advises that conditions 1 and 2 of the Minister’s Order have been satisfied and that the City can proceed to put new notices of completion for the seven projects that are the subject of Part II Order requests in July 2006.
  • July 30, 2010 – New Notices of Completion are posted July 30, 2010.
  • August 29, 2010 – Part II Order requests received
  • March 30, 2011 – Minister of Environment dismisses Part II Order requests and confirms that an individual Environmental Assessment is not required for the seven disputed projects. The Minister further directs that Stormwater Management Ponds 1, 2, and 5 not proceed until such time as the stormwater management models are calibrated and validated
  • September 2011 – Model Validation Report completed and filed with Ministry. Models are validated and confirm the approach in the Environmental Assessments was valid. Stormwater Management Ponds 1, 2, and 5 may proceed to design and construction
  • Official Plan and Zoning By-law amendments with respect to floodplain policies were adopted by City Council on July 11, 2012 and are in full force and effect
  • Carp River Restoration Project commenced March 2013

Frequently asked questions

Why was the Third Party Review initiated?

The City of Ottawa initiated a third-party review of the Carp River Restoration Plan in response to concerns raised following an audit of the project and a modeling error discovered by City staff. Council directed staff to engage a third-party engineering firm to independently review the model and the overall project, and report on their findings prior to the City implementing the restoration project.

Where is the Carp River Restoration Plan study area?

The study area comprises a 5,000-hectare portion of the upper reaches of the Carp River watershed. The area in question includes the southwest portion of Kanata, the village of Stittsville, Scotiabank Place and the lands north of Highway 417 adjacent to the river.

Why is the restoration plan being undertaken?

The Carp River is a slow-moving, sediment filled river. The Carp River Restoration Plan will enhance the river with a narrower low flow channel that improves sediment transport, vegetation along the river banks, and habitat features such as fish habitat pools and wetlands.

What is a two-zone concept for flood-plain development?

A flood-plain can be divided into two zones: a floodway and a flood fringe. The flood fringe is the outer portion of the flood-plain where floodwaters are shallow and slow moving. The two-zone concept allows for some development within the flood fringe areas that can be built on with no adverse impacts. The floodway is the central portion of the flood-plain where faster and deeper water flows, and where development should not take place.

The floodway/flood fringe concept was a recommendation in the Carp River Watershed/Subwatershed Study. The two-zone approach is permitted under the Provincial Policy Statement and the City’s Official Plan. Delineation of the zones is approved by the appropriate conservation authority and regulated by the Conservation Authorities Act.

What is a modified one-zone concept?

Under the modified one-zone concept, the flood-plain is reconfigured and development occurs on land that is no longer within the flood-plain.

Do other conservation authorities use the two-zone concept and allow development within flood-plains?

Although the term “two-zone concept” is not always used, several conservation authorities, including Essex Region, Credit Valley, Central Lake Ontario, Nottawasaga Valley and Halton Conservation, have all permitted development within some of their flood-plains.

Concerns have been raised regarding calibration of the models used for this project. What is meant by model “calibration”?

Calibration means adjusting the computer models to reproduce the measured flows and water levels as closely as possible. Data from several significant storm events is needed for calibration. There is only data for one storm event at this time (the September 2004 event, a storm that exceeded the 100-year storm). Stream gauges have been installed. The additional data collected will enable further calibration of the models so that appropriate adjustments to the Restoration Plan or development can be made as development occurs.

How can the errors in modeling be prevented in the future?

In a situation where there are several projects underway at one time, a master keeper of the model is required to ensure that changes are properly documented and circulated to all parties. In addition, runoff volume targets could be applied to all development within the area to ensure that conditions determined by the modeling tool are followed. The model would not need to be updated as frequently with this approach.

Is the City approving development in a flood-plain?

No. The restoration plan will increase overall flood storage volume in the Carp River corridor. The limited areas to be developed will no longer be in the flood-plain.

How do the provisions in the updated Official Plan affect this project?

Staff will bring forward an OPA for the Carp corridor that applies the modified one-zone concept upon approval of the Carp River Restoration EA.

What is proposed for Kanata West?

In small headwater tributaries like the upper Carp River, flood-plains are often very wide, shallow and indistinct, so it may be necessary to modify the flood-plain to enable urban development to proceed in an efficient manner. This becomes more advantageous when significant restoration and environmental improvements can be realized in the process. The Carp River is well suited to the application of the modified one-zone concept since the flood-plain is very wide and shallow. In April 2007, the Minister of Natural Resources stated that the objectives of the Provincial Natural Hazards Policy have been met in the Carp River Restoration Plan.

Does the Carp Restoration Plan reduce flood storage capacity?

No. The Carp Restoration Plan actually increases storage between Hazeldean Road and Richardson Side Road.

Does the Restoration Plan affect the Highway 417 crossing of the Carp River?

There is no adverse impact on the 417 crossing. Peak water levels under the bridge will be lower following development and restoration than they are now.

How soon will the 15 approved Environmental Assessments (EA) be able to proceed?

The Third Party Review has not identified any impact on the 15 approved EAs from the revised models and other findings. These projects may proceed at any time.

What is required for the remaining seven EAs to be approved?

The Minister of Environment has ordered that the three Class EA reports, which contain the seven challenged EA projects, be revised as needed and Notices of Completion be re-issued for these projects upon completion of the Third Party Review. There will be a 30-day public review period and the opportunity to file Part II Order requests (requests for a bump-up to an individual environmental assessment) for these seven projects. If Part II Order requests are filed, the Minister of the Environment will need to make a decision on the requests. Notices of Completion have been re-issued as of July 30, 2010.

What is meant by the following terms?

Geomorphology: The study of landforms, riverine soils and sediment movement along a watercourse.

Riverine soils: The soil created from the deposition of sediment from a watercourse. They occupy a restricted area, generally within the flood-plain of an existing watercourse, or in proximity, as the watercourse may no longer be connected to the flood-plain. The soils are generally poorly drained, due to their low lying and flat topography.

Return Period: The average period of time between selected storm events, i.e. the five-year storm will occur once every five years on average.

Hydrology: The flow of water over the surface of the earth, taking into account rainfall, overland flow, stream flow, infiltration and groundwater movement.

Hydraulics: The movement of water in a defined channel or water body such as a lake or a river channel, including water velocity and depth of flow.

Kanata West Overall Monitoring Plan

  • December 2016 Report on - Annual Compliance Monitoring Report, Kanata West Owners Group, Carp River Restoration
  • December 2017 Report on - Annual Compliance Monitoring Report, Kanata West Owners Group, Carp River Restoration
  • December 2018 Report on - Annual Compliance Monitoring Report, Kanata West Owners Group, Carp River Restoration

These reports are available by contacting Don Herweyer, Manager, Development Review South at 613-580-2424, ext. 28311 or email at don.herweyer@ottawa.ca

Kanata West Overall Monitoring Plan - Update April 1, 2016 

If you would like a copy of the report, please contact amy.macpherson@ottawa.ca

Background

On November 24, 2009 the Ministry of Environment advised that the City of Ottawa (City) and the Kanata West Owner's Group (KWOG) had satisfied the requirements of Conditions 1 and 2 of the Minister's Order dated July 21, 2008. This clearance allowed the City and KWOG to make preparations to proceed to Condition 3 of the Minister's Order – revising and updating the Class EAs for the Carp River Restoration Project, the Master Servicing Study and the Transportation Master Plan. The Notice of Completion for these projects was posted on July 30, 2010. In response to the Notice of Completion, 88 Part II Order requests were received from local environmental groups, local community groups, and members of the public asking the City of Ottawa and Kanata West Owner's Group be required to prepare an individual environmental assessment for seven of the twenty-two disputed projects in the Kanata West Transportation Master Plan Amendment, the Master Servicing Study and the Carp River, Poole Creek and Feedmill Creek Restoration projects.

In its letter dated November 24, 2009 the Ministry requested that the City prepare and submit an Overall Monitoring Plan Report to the MOE's Ottawa District Office by April 1 of each year, with the first report submitted by April 1, 2010. Given the date of the letter and the winter season the first report largely reflected the commitments contained within the Kanata West Implementation Plan and a brief summary of the July 23-24, 2009 rainfall events. Annual results regarding stream flow and water level monitoring results are also posted on the Mississippi Valley Conservation (MVC) website. Additional flow monitors were installed in the spring of 2010 on Poole Creek near Maple Grove and the Carp River at Maple Grove in accordance with the recommendations of the Third Party Review.

Minister of Environment Decision

On March 30, 2011 the City and KWOG were notified that the Minister of Environment had decided that an individual environmental assessment was not required for the seven disputed projects. The Part II Order requests were denied and the following conditions were placed on the City and KWOG:

  1. The City and KWOG shall implement all commitments made in the letter of October 15, 2009;
    1. Additional Stormwater Management Runoff Volume Controls and widening of Planned Restoration Corridor

In response to Condition 1.1 of the Minister’s Order, the City and KWOG committed to ensuring the provision of a worst case runoff volume identified in the Third Party Review – Carp River Restoration Plan through at source SWM controls of 120m³ per hectare of development until the SWM models are validated or until monitoring and/or model validation indicates changes are necessary; and including the provision for 25% of the TPR worst case deficit volume be incorporated into the design of the Carp River, Poole Creek and Feedmill Creek Restoration project.

Status: No longer required - SWM Models have been validated confirming additional SWM Runoff Volume Controls are not required.

    1. Municipal Planning Controls Regarding Floodplain Management

In response to Condition 1.2 of the Minister’s Order, the City and KWOG committed to the application of municipal planning designations and controls with respect to floodplain policies as set out in the City’s letter dated October 15, 2009 and in the Implementation Plan Kanata West Development Area (Implementation Plan).

Status: Complete – Official Plan and Zoning By-law amendments were adopted by City Council on July 11, 2012 and are in full force and effect.

    1. SWM Model Validation and Contingency Plan

In response to Condition 2.1 of the Minister’s Order concerning Water Level and Flow Modeling Data, the City and KWOG committed to completing the validation of the SWM modeling, which includes the preparation of a Model Validation report and the implementation of a contingency plan, as outlined in the Implementation Plan.

Status: Complete - SWM Model Validation achieved and Model Validation Report completed in August 2011 and submitted to all agencies and posted on City's website.

    1. Water Level and Flow Rate Monitoring Plan

In response to Condition 2.2 of the Minister’s Order concerning Water Level and Flow Rate Monitoring Plan, the City and KWOG committed to implementing a long-term Water Level and Stream Flow Monitoring Program, as set out in the Implementation Plan.

Status: Ongoing – Monitoring Plan ongoing - will occur throughout the Restoration Project.

    1. Development Phasing Plan, Restoration Project Phasing and Interim Development

In response to Condition 2.3 of the Minister’s Order concerning the Development Phasing Plan relating to SWM, the City and KWOG committed to:

      1. Adhering to development thresholds as specified in Table 1 of the Implementation Plan;  Status: Complete - Development Thresholds adhered to – no longer apply based on model validation.
      2. Commencing the Restoration Project within 24 months of Class EA approval as per the Implementation Plan; Status: Project commenced – first phase of project commenced March 2013.
      3. Ensuring that each development application submitted to the City demonstrates through an interim analysis that any incremental changes to the floodplain/SWM Pond design will not increase water levels upstream or downstream in accordance with the Implementation Plan; Status: Ongoing – part of review process.
      4. Phasing of the Restoration Project and development in such a manner that there will be no reduction in available flood storage capacity of the corridor as set out in the Implementation Plan and the City’s response letter dated October 15, 2009. Status: Ongoing – Requirement of the Official Plan Policy and Zoning that applies to the Carp River corridor and a requirement of the Carp River Restoration Project Design and associated permits.
    1. Kanata West Overall Monitoring Plan and Report

With respect to Condition 2.3 of the Minister’s Order the City and KWOG committed to providing an Overall Monitoring Plan as specified in the Implementation Plan that tracks and reports on all aspects of the servicing of the development area including the following:

      1. The various monitoring programs contained in the Implementation Plan;
      2. The status and Progress of development including conformance with the Development Phasing Plan;
      3. The application of SWM controls and performance;
      4. The results of all model validation efforts;
      5. Construction phasing and progress on the Restoration Project;
      6. Any contingency and adaptive management measures.

The City and KWOG have committed to preparing the overall Monitoring Plan report on an annual basis that will be submitted to the MOE on April 1st of each year and made available to the public and other review agencies. This report represents the fourth annual report the first having been submitted on April 1, 2010.

Model Validation Report

Initially the monitoring program stream flow and/or water levels will be assessed to validate the hydrologic and hydraulic models of existing/baseline conditions. Minor changes in land use data may occur in the model, depending on the pace of development, so that comparison of monitoring and modeling results are valid. Annual results regarding stream flow and water level monitoring results will be posted on the MVC website.

The Third Party Review has indicated one or two meaningful events plus smaller events can be used to validate the model of record. Meaningful events have been described as greater than 25 mm of rainfall within a two to six hour time period. The impact of such an event may also be tempered by the antecedent moisture conditions prior to the event as well.

A rainfall event on July 24, 2009 provided an opportunity to collect data for the Carp River. This monitoring undertaken includes water level data and will be used towards the development of rating curves for the purposes of model validation. City radar imagery was utilized and validated by five City rainfall gauges in the watershed. Water level information from one flow monitor has been provided by the MVC to the City for assessment within the model recognizing that rating curves are required prior to the event being used for validation. High-water marks were staked and surveyed in the field and are being input into the model. Two additional flow monitors were installed on Poole Creek and Maple Grove and Carp River at Maple Grove consistent with the recommendations of the Third Party Review. This event and subsequent rainfalls will be monitored and utilized by the City for validation purposes. Ultimate validation assessment will have to ensure and document that the monitored data received is sufficient and adequate for validation.

Since the completion of the Third Party Review the model has been updated with new/active developments. New stormwater management facilities have been updated from those in the original model. These and other updates will occur on an ongoing basis as part of the Model Keeper role.

Condition 2 of the Minister’s Decision of March 30, 2010 also indicated that the City and KWOG not implement SWM Ponds 1, 2, or 5 until such time as the City and KWOG have calibrated and validated the SWM models for the Upper Carp River watershed and prepared the associated Model Validation Report referenced in Condition 1.

In the event that the Model Validation Report identifies significant differences between the observed and simulated results that cannot be rationalized, Condition 3 of the Minister’s decision requires the City and KWOG to implement the Contingency Plan (as required by Condition 1) and re-evaluate and determine the impact these changes may have on the KWMSS and the Restoration Plan.

Since the April 2010 report an adequate number of additional rainfall events were monitored in 2010 such that a Model Validation Report is currently being finalized. The report reviews the monitoring data that was collected between 2009 and 211 and specifically addresses:

  • Whether this data is sufficient to augment the original model calibration efforts and:
  • Whether the adjusted calibrated models can validate the conditions being measured during subsequent events.

The report was finalized and reviewed by Conservation Authority and the City of Ottawa. The final version of this report dated July 13, 2011 was submitted to the Ministry of Environment and posted on the City's website in August 2011.

Stormwater Management Monitoring

The City provides on-going monitoring of stormwater management facilities for suspended solids, phosphorous, and temperature (if required by the classification of the receiver). Visual inspections of SWM facilities occur after each large event (15 mm or greater) and debris is removed as necessary to ensure proper functioning of the facility. Routine inspections of inlets/outlets and the depth of sediment are carried out at the same time.

Construction inspection staff regularly checks these facilities prior to the City assuming the facilities after 80% build-out and identify any remedial measures required to be implemented by the developer to ensure the protection of the receiving stream. An operation and maintenance manual must be prepared and provided to the City prior to assumption of the facility.

The following represents a standardized SWM monitoring program for the Kanata West Area:

Monitoring Program:

  1. The stormwater monitoring program shall be implemented for a minimum of two years and shall continue to be implemented until such time that the MOE’s Ottawa District Office provides written notice that the program may be discontinued;
  2. Monitoring will be provided during the period between May 1st and October 31st for water quality and water level as well as general performance. Water quality would be established for both base flow and rainfall event conditions;
  3. Routine operational inspections would be conducted over the life of the facility, to confirm: general site conditions (erosion/landscaping); ensure monitoring equipment is functioning appropriately; and that orifices and weirs are not clogged with debris. Routine cleaning of any blockages would be done during the inspections, if required;
  4. Pond water levels would be monitored to determine drawdown characteristics of the facility (typically 24 - 48 hours). No flow monitoring is proposed in this program;
  5. Water quality samples would consist of composite samples (collected utilizing automated equipment or by grab sampling) taken at the facility inlet and outlet during/after specified rainfall events. The routine inspection would typically be conducted coincident with sample collection activities;
  6. Water quality parameters would include the Total Suspended Solids (TSS) and Total Phosphorous (TP) and Water Temperature (spot measurement);
  7. The sample collection, preservation, handling and analytical methods including detection limits, would be documented. Sample analysis to be conducted per Standard Methods or approved equivalent at a CALA certified laboratory. Field and lab QA/QC procedures would reflect standard sampling protocols (i.e. samples delivered within 12 hours to lab following collection);
  8. Provide monitoring (sampling, water levels) during the following events over a two year period to ensure that the facility is performing as designed:
  • Two small rainfall events ( less than 7mm)
  • Two medium rainfall events (7-15mm)
  • Three large rainfall events (greater than 15mm)

9. The requirement is for a minimum of the 7 noted events of the size specified. Monitoring activities would typically capture a number of other events during the process, as the amount of rainfall from an event is not predictable in advance. All events that are monitored/sampled, are to be reported in the annual reports. The sampling of all the events within a one year period, although possible, is not acceptable as the intent is a two year program;

  1. Rainfall measurements should be obtained from the nearest available City of Ottawa rain gauge(s) to the facility;
  2. A topographic/bathymetric survey should be undertaken after 3-5 years of operation to determine sediment deposition and sediment deposition rates. This would allow for more concise forecast of forebay cleanout frequency; either confirming or revising the frequency in final SWM report.

Annual Stormwater Monitoring Report

The Annual Stormwater monitoring report shall be prepared and submitted to the District Manager, Ottawa District Office of MOE within six months following the end of the monitoring period. The Annual Stormwater Monitoring Report shall also be provided to the City of Ottawa’s Planning and Growth Management Department so that the City can review and include results in its annual Overall Monitoring Report in accordance with the Implementation Plan Kanata West Development Area; the Report is to contain the following:

  1. A description of the physical works, its location, and how it is designed to function;
  2. A tabulation, interpretation and summary of all monitoring data with an assessment of the performance of the facility based on TSS removal including comparison of the water quality data with applicable criteria such as the Provincial Water Quality Objectives (PWQOs);
  3. An evaluation of the pond’s performance and its ability to meet the design performance criteria of 70% TSS removal (during the monitoring period) and ability to achieve an appropriate draw down time (24 – 48 hours);
  4. A description of any operating problems encountered and corrective actions taken during the reporting period and the need for further investigation in the following reporting period for pond refinements or ways of improving the performance of the facility to meet the performance target;
  5. Any need for modifications of the monitoring program and/or the work plan;
  6. A summary of any complaints received during the reporting period and any steps taken to address the complaints;
  7. Appendices of inspection logs and facility photos;
  8. Any other information that is deemed to have been obtained by the Owner pursuant to the requirements of the Certificate of Approval that the MOE District Manager requires for inclusion in the reports.

Monitoring for Interim Stormwater Management Facilities

SWMP monitoring requirements for each facility will be identified in the Ministry of the

Environment’s Certificate of Approval for each facility. The City and the MVC require a comprehensive monitoring program to ensure the Carp River, Poole Creek and Feedmill Creek restoration project and preferred stormwater management solutions identified in the Master Servicing Plan operate and perform to the specifications and standards described in the Class Environmental Assessment documents.

Stream flow monitoring will form an important component of the monitoring program. The City and the MVC, are committed to implementing a long-term stream flow monitoring program for the Upper Carp River Watershed. The program will support the mandate of the MVC, including flood forecasting. It will also be utilized, by the City of Ottawa to confirm the current hydrologic and hydraulic models that have been developed for the Upper Carp River Watershed. The current models contain stormwater management proposals, including at source, stormwater management ponds and conveyance systems that meet the water management objectives of the City of Ottawa, the MVC, MNR, MOE and MTO. The City, along with MVC and provincial agencies, has a vested interest in ensuring water management objectives for the Carp River system is met.

The following additional requirements for interim SWM facilities shall be provided in addition to the above Stormwater Management Monitoring Program requirements:

  • The stormwater monitoring program shall be implemented for a minimum of two years and shall continue to be implemented until such time that the Ministry of Environment provides written notice that the program may be discontinued;
  • An annual stormwater monitoring report shall be prepared and submitted to the Ministry of Environment (Ottawa District Office) than March 31st of each and every year. The annual reports shall cover the monitoring period for the previous year,
  • The annual monitoring reports and associated data are also to be provided to the City of Ottawa, so that the municipality can review and include the results in its annual Overall Monitoring Report in accordance with the Implementation Plan for the Kanata West Development Area; and
  • All annual monitoring reports shall include the following additional information for the reporting period
    • an estimate of base flow from the facility;
    • an estimate of the percentage of build out for the contributing drainage area of the facility; and
    • a description of any considerations that may need to be implemented upon transition and/or decommissioning of the interim facility once an ultimate SWM facility is provided.

Stream Flow and Fisheries Monitoring

The City of Ottawa is undertaking a comprehensive monitoring program to ensure the Carp River, Poole Creek and Feedmill Creek restoration projects operate and perform to the specifications and standards described in the Class Environmental Assessment documents. An integrated monitoring program has been developed and implemented that will include but not be limited to:

  • Semi-annual fisheries and terrestrial monitoring/reporting to DFO
  • Stream Flow monitoring

Semi-annual fisheries and terrestrial monitoring/reporting to DFO

This monitoring will include assessment of erosion and deposition through the system as well as any erosion/scour at major crossings including Highay 417. Observations will be documented with field measurements and photos depicting the stabilization process of the restoration features. In the event that specific areas demonstrate the need for remedial action, repair or restoration will be made accordingly. The reports would be circulated to other agencies as required. Two kinds of monitoring of the aquatic environment are particularly relevant:

  1. Construction monitoring to ensure that the new channel and ponds are constructed as per specifications; and
  2. Post-construction monitoring to determine whether the newly constructed channels and ponds have indeed improved aquatic habitats.

Construction monitoring of the fish habitat compensations will be carried out to demonstrate that proposed activities have been implemented.

  • Biologists, environmental inspectors, or experienced contractors will inspect the compensation works during and after completion and will collect photographic evidence to show that the works were completed as agreed upon in the plan and for the purpose of an authorization under Section 35 of the Fisheries Act.

Sediment and erosion control measures will be inspected regularly and maintained in proper working order until all areas are fully stabilized.

The City of Ottawa currently monitors water quality, fish and benthic invertebrates in the Carp River system on a frequent basis, and it is anticipated that the City will continue to do so following construction.

  • Monitoring will be conducted in years 1 and 2 after full construction, then at 2 year intervals until the system is demonstrated to be stabilized. The information gained from this monitoring will be useful for determining the success of the plan, and may provide insight for future restoration activities in the Carp River and elsewhere.
  • Monitoring will include indicators of the physical and chemical environment, as well as of the biological responses (fish and benthos).

During years 1 and 2 (Post Construction), the stability of the banks, and streambed will be assessed and any features that are determined to not be functioning as intended will be corrected. Additional plantings and/or seeding will be applied where the establishment of vegetation is insufficient to meet soil stability.

Streamflow velocity, water quality (pH, dissolved oxygen, total suspended solids, conductivity, copper, hardness, and total and unionized ammonia, TKN, and phosphorus) will be recorded on a seasonal basis (spring, summer, and fall). Temperature loggers will be installed to collect continuous data through the summer months. Benthos sampling will be completed annually, in late summer, and measurements of abundance and diversity will be calculated for temporal comparisons. Electro fishing will be carried out following a standardized protocol (e.g., OSAP as per Stanfield et al., 2000) so that the data are comparable to preconstruction data.

In addition to the monitoring described herein, the Third Party Review recommends the collection of in-stream sediment samples during the construction phases of the Restoration Plan. To augment the data being collected and assess local impacts, additional samples could also be collected downstream of the Huntley Creek confluence. By including this downstream location, all sampling would help qualify the upper Carp River impacts downstream. This data could also be used to augment any future databases for the Carp River.

Monitoring reports content and frequency will be determined by DFO but may include:

  • A photographic record showing the areas where compensation measures took place. The photographic record will include hard copies of digital photographs documenting the site before, during, and after construction, and once a year for the extent of the monitoring plan. The photographs will be taken from similar vantage points for ease of comparison. Electronic copies of the digital photos will be made available to Fisheries and Oceans Canada if required;
  • Summaries of the data collected in tabular form for ease of comparison over time; and
  • Recommendations for changes and/or improvements to the monitoring plan or the monitoring methods.

Stream Flow monitoring

The City and the MVC are committed to implementing a long-term streamflow monitoring program for the Upper Carp River Watershed. The program will support the mandate of the MVC, including flood forecasting and warning. Annual results will be posted on the MVC website.

Continuous monitoring of water level and streamflow (year round) will occur at three locations in the Upper Carp River Watershed including the Carp River and Poole Creek.

  • Carp River at Richardson Side Road
  • Carp River at Maple Grove Road
  • Poole Creek at Maple Grove Road

All of these streamflow monitoring stations are permanent gauges as part of the ongoing MVCA long-term monitoring program. Water level data is currently being collected and stage-discharge rating curves are being developed for each location. The Carp River gauges closely relate to flows at MTO's 417 bridge structure. Gauges located at Richardson Side Road and two on Maple Grove Road (one at the Carp and one at the Poole crossing) will provide appropriate information as the flows from Feedmill are intermittent and can be inferred from the other locations. Palladium Drive was also considered as a replacement for Maple Grove Road location at the Carp River which would not be affected by the future changes to Maple Grove but not selected by the MVC for access and safety reasons. The results from the streamflow monitoring are detailed in the Model Validation report.

The City of Ottawa’s Water Environment Protection Program provides up to date information on the condition of Ottawa’s surface water resources. As far as existing monitoring sites within Kanata West the City have the following in the Baseline program:

  • Carp River @ Richardson Side Rd - water quality data for 10 years;
  • Carp River @ Huntmar - base flow in 2009; biological monitoring added in 2010;
  • Poole Creek upstream of Stittsville - base flow in 2009; added as part of expanded program in 2010 for water quality and biological; fish community information since 2005; and
  • Feedmill Creek – stream habitat assessment completed in 2004 for three areas between the Carp River and Highway 417 (includes habitat, fish and benthos community, thermal stability information).

The City has initiated further monitoring of the aquatic environment in the vicinity of the
restoration efforts on the Carp River, Feedmill Creek and Poole Creek to determine
restoration effectiveness. Key concepts of the Project Outline include:

  • Quantitative assessments to determine restoration effectiveness;
  • Pre-construction monitoring to document condition of aquatic indicators before restoration and develop restoration effectiveness criteria
  • Post construction monitoring to document condition of aquatic indicators after restoration for comparison to criteria; and
  • Post-monitoring analysis to determine changes in aquatic indicators and level of restoration effectiveness.

Fieldwork commenced in March 2012 and was completed November 2012. Fish habitat assessments, benthos community assessments, fish community sampling and assessment were carried out as well as water chemistry sampling and water temperature monitoring. Field work for 2012 was also undertaken and the results of the 2012 work program are also provided on the City's website and form part of the Annual Monitoring report process (see Appendix 1). A report was not produced for 2013 as the City has adequate pre-construction data to evaluate against post-construction conditions. Additional information on the City’s Baseline Water Quality Monitoring Program can be found ottawa.ca.

Water Demand Monitoring

A regular water demand monitoring program will be required to accurately identify the timing of the construction of upgrades to the sub-pressure zones. All infrastructures will be included in the City infrastructure management program. Infrastructure under developer warranty will not be included in this program.

The watermains are associated with the area arterial and collector roadway construction and watermain looping needs to service adjacent and proposed development. The timing of the proposed transmission watermains is subject to the timing of the local developments they serve and the construction timing of the transportation network. Looping of the watermain is required in the lands south of the 417 at 1000 units and north of the 417 at 500 units. Design and construction for both the north and south watermain looping has been completed. and construction is anticipated to be completed in 2013.

Sanitary Monitoring

A regular flow monitoring program will be performed by the City to accurately identify the timing of the various upgrades to the Signature Ridge Pumping Station (SRPS) required to facilitate the development of Area “A” (Kanata West Master Servicing Plan -MSS). The hydraulic analysis in Master Servicing Study uses current City design guidelines to demonstrate that Phase IA can build out within the design capacity of the upgraded SRPS.

Area “B” as shown on the MSS includes the area within Kanata West which will be tributary to the new pumping station to be built on Maple Grove Road west of the Carp River. This pumping station will drain to the Stittsville Collector Sewer on an interim basis via a temporary forcemain in Maple Grove Road, Huntmar Road and Iber Road. All of Area “B” will not be able to be tributary to the Stittsville Collector on an interim basis and a regular flow monitoring program is required to determine the exact amount of development which will be allowed into the Stittsville system on an interim basis.

A regular flow monitoring program is in place for the Stittsville system to accurately identify development needs and capacity use.

The new Kanata West Pump Station and associated forcemains and overflow are currently under design with construction scheduled to occur between 2013 and 2016.

Development – Timing and Phasing

As of April 1 2014, a limited amount of development within Kanata West has commenced. Figure 1 illustrates the status of developments in Kanata West. Given the delays incurred throughout the Kanata West environmental assessment process and based on existing sanitary sewer capacity constraints and significant land and SWM ponds tied to the Carp River Restoration, there has been limited development in the Kanata West area to date.

The Kanata West Area is comprised of approximately 722 hectares of urban land. A total of approximately 73 hectares of land represents "existing development" (i.e. Scotiabank Place, Palladium Auto Park, Maple Grove Works Yards, and the Bridge Church). A total of 128 hectares is made up of constructed or registered residential lots including the retail area along Hazeldean Road and the Fairwinds North and South subdivisions along Maple Grove Road. An additional 92.5 hectares of land has been approved but not yet constructed. In terms of constructed, registered and ready to develop land, a total of 130.5 hectares exists in Kanata West which represents approximately 18% of the total land area. In addition, a further 158 hectares of development land has been draft approved. Much of this land cannot be developed until the Kanata West Pump Station has been commissioned or the Carp River Restoration Project has been completed. In terms of draft approved and registered lands, a total of 286 hectares exists within Kanata West representing 40%of the total land area in Kanata West.

Applications have been received for a further 86 hectares of land for which draft approvals have not been granted and final approval/construction will be some time based on servicing constraints (Sanitary Pump Stations, SWM ponds).

Thresholds

The Third Party Review identified a worst case volume of runoff that should be accommodated in advance of the models being validated with monitored results. The volume could be prorated around 100 to 120 m³/ha of new development. To address this scenario in the absence of model validation, at-source controls were initially implemented to the limited number of developments that proceeded in advance of model validation. Based on the Model Validation these at source controls are no longer applicable or required.

The Third Party Review had identified a threshold development that can proceed prior to the completion of the restoration plan. The following scenarios in Table 1 for build out were considered:

Table 1: Threshold Summary
% of Kanata West and Fernbank* Development Permitted Conditions

34%With no Carp River restoration, no monitored data to validate model and no other measures taken to compensate for deficit volume

53.6%With Carp River restoration completed but no other measures to compensate for deficit volume

65%With no Carp River restoration and no monitored data to validate model, an additional 85,600m3 of storage to be provided on a pro rata basis by development within Kanata West or through other areas with the drainage area

100%The restoration plan for the Carp River to be completed and constructed and either of a) the model to be validated; or b) the additional 85,600m3 of storage to be provided within Kanata West.

* Reference to Fernbank only relates to the portion of the Fernbank Community Design Plan area which contributes to the Carp River. The Fernbank development area is located adjacent to Kanata West on the south side of Hazeldean Road.

Status of EA Projects

There were 22 projects approved through the three Environmental Assessment Studies, seven of which were subject to Part II Order requests in response to the June 2006 Notice of Completion. The other 15 were deemed to be approved and could proceed to construction in accordance with the Class EA process. In July of 2010 a new Notice of Completion was filed for the 7 disputed projects and the four roadway projects that had not as of yet commenced. On March 30, 2011 the Minister of Environment issued a decision dismissing the subsequent Part II Order requests to the July 2011 Notice of Completion. Table 1 lists the 22 projects, provides an indication of their current status and when the deadline for commencement of the project is based on the date of the corresponding Environmental Assessment Process (10 years from 2006 or 2011).

Table 1

ProjectImplementation StatusDeadline for Project Commencement before EA Update Required

Master Servicing Study

Water Projects

Watermains in Huntmar Road Extension from Hazeldean Road to Maple Grove Rd.Watermain in Huntmar Road constructedN/A construction started

Watermains in Huntmar Road Widening from Maple Grove Road to Campeau DrivePart of project started in 2013 completion in 20152016

Watermains in Campeau Drive from Didsbury Road to North South ArterialConstruction completedN/A construction started

Watermain in Maple Grove Road from Stittsville Main Street to Terry Fox DriveWatermain in Maple Grove Road partially constructedN/A construction started

Watermains in North-South Arterial from Hazeldean Road to Campeau Drive ExtensionNot started2016

Watermains in Stittsville Main Street Extension from Maple Grove Road to Palladium DriveNot started2016

Stormwater Projects

Stormwater Management Pond # 1 and associated storm sewersPartial trunk storm sewer constructedN/A construction started

Stormwater Management Pond # 2 and associated storm sewersDesign commenced2021

Stormwater Management Pond # 3 and associated storm sewersDesign Completed2016

Stormwater Management Pond # 4 and associated storm sewersPartial trunk storm sewer along Maple Grove constructedN/A construction started

Stormwater Management Pond # 5 and associated storm sewersDesign Commenced2021

Stormwater Management Pond # 6 and associated storm sewersPartially constructed2016 N/A construction started

Stormwater Management Pond # 7 and associated storm sewersNot started2016

Sanitary Projects

Signature Ridge Pump Station Upgrade and associated gravity sanitary sewersDetailed design underway for minor upgrade and overflow.
Detailed design underway for sanitary sewers – construction commencement scheduled 2013N/A Construction Started

Kanata West Pumping Station and associated gravity sanitary sewers

  • Permanent Twinned Force main to the Tri Party Collector
  • Trunk Sanitary from Silver Seven, & along Carp River between Maple Grove Road and Palladium Drive

Detailed design underway – to be tendered in 2014. Construction 2015-16.
Part of Trunk Sanitary to the Kanata West Pump Station constructedN/A construction started

Transportation Master Plan

Huntmar Road Extension from Hazeldean Road to Maple Grove RoadConstruction CompleteN/A construction completed

Campeau Drive from Didsbury Road to North-South ArterialConstruction commencement N/A construction completed

Huntmar Road Widening from Maple Grove Road to Campeau DriveNot started2021

Maple Grove Road Widening from west of Huntmar Road to Terry Fox DriveNot started2021

North-South Arterial from Hazeldean Road to Campeau Drive ExtensionNot started2021

Stittsville Main Street Extension from Maple Grove Road to North-South ArterialNot started2021

TransitwayTransitway EA completedN/A no expiry for TPAP

Carp River, Poole Creek and Feedmill Creek Restoration

Carp River, Poole Creek and Feedmill Creek RestorationProject Commenced March  2013.N/A construction started

Timing of Annual Report

This reporting will occur on an annual basis (April 1st). The report will be sent to the local MOE office and posted on the City’s website at ottawa.ca.

Appendix 1

The City of Ottawa’s Water Environment Protection Program Report on Carp River, Feedmill Creek and Poole Creek. 

If you would like a copy of the report, please contact Amy MacPherson, amy.macpherson@ottawa.ca