Combined sewer overflows (CSOs)
What is a combined sewer overflow (CSO)?
The City of Ottawa has three types of sewers: wastewater, stormwater, and combined.
- Wastewater sewers: Collect wastewater from homes, businesses and industries, and transport the wastewater through a network of sewers, pumping stations and forcemains to main or trunk sewers, and direct it to the Robert O. Pickard Environmental Centre for treatment.
- Stormwater sewers: Carry rainfall and other surface water run-off directly to the nearest creek, stream or river, generally without treatment.
- Combined sewers: Collect and transport both sanitary wastewater and stormwater runoff in a single pipe. This type of collection system was typically installed from 1880 to 1960 and is still in operation in older areas of most Canadian cities.
During dry weather, wastewater is collected and carried from a combined sewer to the City's wastewater treatment plant. During heavy rainstorms or snowmelts, the combined sewer may not be able to handle the high volume of stormwater runoff entering the system. Most of the wastewater is transported to treatment plants via the wastewater pipe, but to prevent flooding and sewer backups, some of the rain and wastewater mixture is diverted as overflow into the river.
The practice of discharging overflows during the normal operation of combined sewer systems is accepted by the Ministry of the Environment, Conservation and Parks (MECP). In Ottawa, these events are monitored and reported to the MECP and downstream users such as water purification plants and special interest groups.
What is the City doing to prevent overflows?
The City of Ottawa has implemented the following plan to mitigate the impact of combined sewer overflows into the Ottawa River:
- The Combined Sewage Storage Tunnel (CSST) is the most significant infrastructure project that the City has undertaken to mitigate the impact of CSOs into the Ottawa River.
- Real time controls to ensure maximum capture of overflows before they occur
- Real time controls permit the remote activation and control of overflow equipment combined with continuous monitoring of pipe flow data to maximize the capture and treatment of wastewater flow from combined sewer systems
- Ongoing sewer separation projects
- Review of the effectiveness of the current sewer separation program, in comparison to other projects
- Development and implementation of a Wet Weather Infrastructure Management Plan
- Installation of devices to remove floatable material from wastewater and prevent it from reaching the river in the event an overflow occurs
The City has been working for many years to separate remaining combined sewers. The value of the work completed to date is estimated at $750 million. With the current funding framework, it is expected the planned separation work will be completed in approximately 25 years.
The City has made the following improvement to existing systems:
- Water level, flow monitoring and alarm devices installed in major combined sewer overflows and monitored daily to alert staff if an overflow occurs
- Strengthened protocols to provide prompt notification to the MECP Spills Action Centre and Council in the event of an overflow
- Construction upgrades are in process for the overflow sites that were the major contributors to the total volume of sewage released during combined sewer overflows
- Improved regulator inspection and maintenance are improved and now scheduled monthly, weekly after each rain and within 24 hours of receiving an alarm
Sewer overflow sites
There are 13 locations in Ottawa where sewer overflows may enter the river:
- Ladouceur CSO Outfall
- Merton CSO Outfall
- Booth-Wellington Regulator Overflow
- CSST-Kent Overflow
- Rideau Canal Regulator Overflow
- Keefer Regulator Overflow
- Dufferin CSO Outfall
- Hemlock CSO Outfall
- Sandridge Storage Tank Overflow
- Alvin Heights CSO Outfall and RCAF CSO Outfall
- RCAF West CSO Outfall
- Springhurst CSO Outfall
- Clegg CSO Outfall
Combined sewer overflows are generally diverted to flow into the Ottawa River.
The three combined sewer overflow sites that contribute the largest volumes of CSOs are:
- Rideau Regulator Overflow
- Booth Regulator Overflow
- Keefer Regulator Overflow
Overflow activity (January 1, 2020 to date)
PLEASE NOTE: The volume indicated in the chart below (CSO) denotes the volume of combined overflow mixture which is comprised of storm water and wastewater. The majority of overflows occur during heavy rain and snowfall/melting periods. The chart below indicates the date, cause, and volume of each overflow event.
- CSO: Combined Sewer Overflow
- SSO: Sanitary Sewer Overflow
Date | Event | Cause | Volume (m3) |
---|---|---|---|
01-11-2020 | CSO | Rain | 58,520 m3 |
03-03-2020 | CSO | Rain | 870 m³ |
03-20-2020 | CSO | Rain | 23,990 m3 |
03-29-2020 | CSO | Rain | 26,300 m³ |
05-15-2020 | CSO | Rain | 4,940 m³ |
05-29-2020 | CSO | Rain | 11,450 m³ |
05-30-2020 | CSO | Rain | 80 m³ |
06-28-2020 | CSO | Rain | 20 m³ |
07-17-2020 | CSO | Rain | 2,110 m³ |
07-19-2020 | CSO | Rain | 30,830 m³ |
07-29-2020 | CSO | Rain | 150 m³ |
07-30-2020 | CSO | Rain | 1,200 m³ |
08-02-2020 | CSO | Rain | 44,980 m³ |
08-04-2020 | CSO | Rain | 12,540 m³ |
08-11-2020 | CSO | Rain | 590 m³ |
08-16-2020 | CSO | Rain | 39,550 m³ |
08-23-2020 | CSO | Rain | 11,920 m³ |
08-29-2020 | CSO | Rain | 34,900 m³ |
09-02-2020 | CSO | Rain | 3,780 m³ |
09-13-2020 | CSO | Rain | 200 m³ |
09-29-2020 | CSO | Rain | 680 m³ |
10-07-2020 | CSO | Rain | 6,440 m³ |
10-21-2020 | CSO | Rain | 3,680 m³ |
12-24-2020 | CSO | Rain | 24,300 m³ |
03-26-2021 | CSO | Rain | 55,730 m³ |
08-29-2021 | CSO | Rain | 680 m³ |
09-06-2021 | CSO | Rain | 10 m³ |
09-15-2021 | CSO | Rain | 1660 m³ |
10-16-2021 | CSO | Rain | 61,870 m³ |
11-16-2021 | SSO | Faulty Instrumentation | 310 m³ |
05-16-2022 | CSO | Rain | 12,450 m³ |
05-21-2022 | CSO | Rain | 910 m³ |
05-27-2022 | CSO | Rain | 20 m³ |
06-01-2022 | SSO | Rain | 17.68 m³ |
07-24-2022 | CSO | Rain | 17.44 m³ |
08-09-2022 | CSO | Rain | 31,370 m³ |
04-05-2023 | CSO | Rain | 28,230 m³ |
04-30-2023 | CSO | Rain | 52,280 m³ |
06-26-2023 | CSO | Rain | 67,310 m³ |
07-28-2023 | CSO | Rain | 160 m3 |
08-10-2023 | CSO | Rain | 314,750 m3 |
06-06-2024 | CSO | Rain | 50,120.28 m3 |
07-06-2024 | CSO | Rain | 593.6 m3 |
07-13-2024 | CSO | Rain | 233.98 m3 |
07-24-2024 | CSO | Rain | 410 m3 |
08-03-2024 | CSO | Rain | 102.7 m3 |
08-09-2024 | CSO | Rain | 155,700 m3 |
08-18-2024 | CSO | Rain | 700 m3 |
Historical overflow activity (CSOs only)
CSO activity during the Annual Reporting Period (April 15 to November 15).
Year | Number of Events | Volume | Precipitation (mm) |
---|---|---|---|
2019 | 26 | 810,000 m3 | 635 mm |
2018 | 58 | 536,000 m3 | 524 mm |
2017 | 79 | 1,611,000 m3 | 923 mm |
2016 | 85 | 413,000 m3 | 495 mm |
2015 | 80 | 180,000 m3 | 332 mm |
2014 | 101 | 552,000 m3 | 640 mm |
2013 | 179 | 213,000 m3 | 581 mm |
2012 | 142 | 237,000 m3 | 523 mm |
2011 | 161 | 230,000 m3 | 533 mm |
2010 | 322 | 673,000 m3 | 646 mm |
2009 | 384 | 851,000 m3 | 649 mm |
2008 | 325 | 877,000 m3 | 600 mm |
2007 | 253 | 730,000 m3 | 555 mm |
2006 | 271 | 1,090,000 m3 | 796 mm |