Ottawa Route 174 Slope stabilization |
Environment, Municipal addressing |
Construction |
Planned |
Brian Coburn Boulevard Extension / Cumberland Transitway (Navan Road to Blair Road at Innes Road) Environmental Assessment Study |
Roads, Sewer, Water and Wastewater, Transit |
Planning |
Underway |
2023 Commuter Attitude Survey |
Cycling, Pathways and Sidewalks, Planning and development, Roads, Sewer, Water and Wastewater, Transit |
Planning |
Underway |
Rock Excavation Frequently Asked Questions (FAQ) |
Transit |
Construction |
Underway |
Public Transit System for Gatineau’s West End – Complementary Study |
Transit |
Planning |
Underway |
Blackburn Hamlet Bypass / Innes Road Transit Priority Measures (Navan Road to Blair Road) Environmental Assessment Study |
Bridges, Roads, Sewer, Water and Wastewater, Transit |
Planning |
Underway |
Baseline/Greenbank transit priority intersection improvements |
Cycling, Pathways and Sidewalks, Roads, Sewer, Water and Wastewater, Transit |
Construction |
Planned |
Transportation Master Plan |
Transit |
Planning |
Underway |
Bayshore to Moodie Bus Rapid Transit (BRT) Conversion to Light Rail Transit (LRT) Environmental Assessment (EA) |
Transit |
Planning |
Completed |
Transportation Master Plan |
Cycling, Pathways and Sidewalks, Planning and development, Roads, Sewer, Water and Wastewater, Transit |
Planning |
Underway |
Earl Grey Drive extension |
Bridges, Cycling, Pathways and Sidewalks, Roads, Sewer, Water and Wastewater, Transit |
Construction |
Planned |
Blair Road transit priority and high occupancy vehicle lanes |
Bridges, Cycling, Pathways and Sidewalks, Roads, Sewer, Water and Wastewater, Transit |
Construction |
Planned |
Kanata Light Rail Transit Planning and Environmental Assessment Study |
Transit |
Other |
Completed |
Barrhaven Light Rail Transit (Baseline Station to Barrhaven Town Centre) and Rail Grade-Separations Planning and Environmental Assessment Study |
Transit |
Planning |
Underway |